ISBN: 9786202317702 - development of field rework index in construction industry: identify chances of rework before starting of your construction work. (9 resultados)

- Tapa blanda
Librería: Books Puddle, Woodside, NY, Estados Unidos de AmericaBooks Puddle
Contactar con el vendedorVendedor de 4 estrellasCondición: Nuevo
EUR 75,67
Envío por EUR 3,55Se envía dentro de Estados Unidos de AmericaCantidad disponible: 4 disponibles
Condición: New. pp. 76.

- Tapa blanda
Librería: Revaluation Books, Exeter, Reino UnidoRevaluation Books
Contactar con el vendedorVendedor de 5 estrellasCondición: Nuevo
EUR 82,59
Envío por EUR 11,98Se envía de Reino Unido a Estados Unidos de AmericaCantidad disponible: 1 disponible
Paperback. Condición: Brand New. 76 pages. 8.66x5.91x0.18 inches. In Stock.

- Tapa blanda
Librería: preigu, Osnabrück, Alemaniapreigu
Contactar con el vendedorVendedor de 5 estrellasCondición: Nuevo
EUR 41,25
Envío por EUR 70,00Se envía de Alemania a Estados Unidos de AmericaCantidad disponible: 5 disponibles
Taschenbuch. Condición: Neu. Development of Field Rework Index in Construction Industry | Identify Chances of rework before starting of Your Construction work. | Krupesh Chauhan (u. a.) | Taschenbuch | 76 S. | Englisch | 2018 | Scholars' Press | EAN 9786202317702 | Verantwortliche Person für die EU: preigu GmbH & Co. KG, Lengericher Landstr. 19, 49078 Osnabrück, mail[at]preigu[dot]de | Anbieter: preigu. …

- Tapa blanda
- Impresión bajo demanda
Librería: BuchWeltWeit Ludwig Meier e.K., Bergisch Gladbach, AlemaniaBuchWeltWeit Ludwig Meier e.K.
Contactar con el vendedorVendedor de 5 estrellasCondición: Nuevo
EUR 45,90
Envío por EUR 23,00Se envía de Alemania a Estados Unidos de AmericaCantidad disponible: 2 disponibles
Taschenbuch. Condición: Neu. This item is printed on demand - it takes 3-4 days longer - Neuware -The construction industry is facing the significant problems of high cost of project delivery, bad financial performance and inability to deliver value to customers on time. A major factor contributing to this setback is rework. Rework is defined as the unnecessary effort of redoing an activity that was inaccurately done the first time. In this research work questionnaire survey having various reasons of rework was conducted, Survey was carried out in Surat City south Gujarat Region. From the various Literatures 48 Causes of rework were finalized under 7 Major Group which was checked for their impact in construction using IMPORTANCE INDEX (IMPI) method and top most crucial causes were used to develop FIELD REWORK INDEX (FRI). The FRI score between 14 to 30 was approaching stage, 30 to 45 was normal vigilance stage and 45 to 70 was rework alert stage. After FRI questionnaire was distributed in 11 building construction sites out of 3 sites (27.27%) sites are having success approach, 8 sites (72.73%) are having normal chances of rework and 0 sites are having high alert. 76 pp. Englisch.…

- Tapa blanda
- Impresión bajo demanda
Librería: Majestic Books, Hounslow, Reino UnidoMajestic Books
Contactar con el vendedorVendedor de 4 estrellasCondición: Nuevo
EUR 76,48
Envío por EUR 7,79Se envía de Reino Unido a Estados Unidos de AmericaCantidad disponible: 4 disponibles
Condición: New. Print on Demand pp. 76.

- Tapa blanda
- Impresión bajo demanda
Librería: AHA-BUCH GmbH, Einbeck, AlemaniaAHA-BUCH GmbH
Contactar con el vendedorVendedor de 5 estrellasCondición: Nuevo
EUR 51,62
Envío por EUR 35,00Se envía de Alemania a Estados Unidos de AmericaCantidad disponible: 1 disponible
Taschenbuch. Condición: Neu. nach der Bestellung gedruckt Neuware - Printed after ordering - The construction industry is facing the significant problems of high cost of project delivery, bad financial performance and inability to deliver value to customers on time. A major factor contributing to this setback is rework. Rework is defined as the unnecessary effort of redoing an activity that was inaccurately done the first time. In this research work questionnaire survey having various reasons of rework was conducted, Survey was carried out in Surat City south Gujarat Region. From the various Literatures 48 Causes of rework were finalized under 7 Major Group which was checked for their impact in construction using IMPORTANCE INDEX (IMPI) method and top most crucial causes were used to develop FIELD REWORK INDEX (FRI). The FRI score between 14 to 30 was approaching stage, 30 to 45 was normal vigilance stage and 45 to 70 was rework alert stage. After FRI questionnaire was distributed in 11 building construction sites out of 3 sites (27.27%) sites are having success approach, 8 sites (72.73%) are having normal chances of rework and 0 sites are having high alert.…

- Tapa blanda
- Impresión bajo demanda
Librería: Biblios, frankfurt am main, HESSE, AlemaniaBiblios
Contactar con el vendedorVendedor de 4 estrellasCondición: Nuevo
EUR 77,23
Envío por EUR 9,95Se envía de Alemania a Estados Unidos de AmericaCantidad disponible: 4 disponibles
Condición: New. PRINT ON DEMAND pp. 76.

- Tapa blanda
- Impresión bajo demanda
Librería: moluna, Greven, Alemaniamoluna
Contactar con el vendedorVendedor de 5 estrellasCondición: Nuevo
EUR 38,74
Envío por EUR 48,99Se envía de Alemania a Estados Unidos de AmericaCantidad disponible: Más de 20 disponibles
Condición: New. Dieser Artikel ist ein Print on Demand Artikel und wird nach Ihrer Bestellung fuer Sie gedruckt. Autor/Autorin: Chauhan KrupeshThe author is the Associate Professor at the Civil Engineering Department, Sardar Vallabhbhai National Institute of Technology, Surat, Gujarat, India, from 25 years & field work experience of 9 Years. The areas of his .…

- Tapa blanda
- Impresión bajo demanda
Librería: buchversandmimpf2000, Emtmannsberg, BAYE, Alemaniabuchversandmimpf2000
Contactar con el vendedorVendedor de 5 estrellasCondición: Nuevo
EUR 45,90
Envío por EUR 60,00Se envía de Alemania a Estados Unidos de AmericaCantidad disponible: 1 disponible
Taschenbuch. Condición: Neu. This item is printed on demand - Print on Demand Titel. Neuware -The construction industry is facing the significant problems of high cost of project delivery, bad financial performance and inability to deliver value to customers on time. A major factor contributing to this setback is rework. Rework is defined as the unnecessary effort of redoing an activity that was inaccurately done the first time. In this research work questionnaire survey having various reasons of rework was conducted, Survey was carried out in Surat City south Gujarat Region. From the various Literatures 48 Causes of rework were finalized under 7 Major Group which was checked for their impact in construction using IMPORTANCE INDEX (IMPI) method and top most crucial causes were used to develop FIELD REWORK INDEX (FRI). The FRI score between 14 to 30 was approaching stage, 30 to 45 was normal vigilance stage and 45 to 70 was rework alert stage. After FRI questionnaire was distributed in 11 building construction sites out of 3 sites (27.27%) sites are having success approach, 8 sites (72.73%) are having normal chances of rework and 0 sites are having high alert.VDM Verlag, Dudweiler Landstraße 99, 66123 Saarbrücken 76 pp. Englisch.…