Isbn: 9783540578345 - resource-constrained project scheduling: exact methods for the multi-mode case: 409 (lecture notes in economics and mathematical systems, 409) (15 resultados)

ISBN: 
Refinar con la Búsqueda avanzada

Filtrar la búsqueda

  • Libros (15)

a

Intervalo de precios personalizado (EUR)

a

  • Idioma: Inglés

    Editorial: Springer, 1994

    354057834X / 9783540578345

    • Tapa blanda

    Librería: -OnTimeBooks-, Phoenix, AZ, Estados Unidos de America-OnTimeBooks-

    Vendedor de 5 estrellas
    Contactar con el vendedor

    Condición: Usado - Aceptable

    EUR 82,60

     Gastos de envío gratis 
    Se envía dentro de Estados Unidos de America

    Cantidad disponible: 1 disponibles

    Condición: good. A copy that has been read, remains in good condition. All pages are intact, and the cover is intact. The spine and cover show signs of wear. Pages can include notes and highlighting and show signs of wear, and the copy can include "From the library of" labels or previous owner inscriptions. 100% GUARANTEE! Shipped with delivery confirmation, if you're not satisfied with purchase please return item! Ships via media mail.…

  • Idioma: Inglés

    Editorial: Springer 1994-05, 1994

    354057834X / 9783540578345

    • Tapa blanda

    Librería: Chiron Media, Wallingford, Reino UnidoChiron Media

    Vendedor de 5 estrellas
    Contactar con el vendedor

    Condición: Nuevo

    EUR 106,94

    Envío por EUR 18,01 
    Se envía de Reino Unido a Estados Unidos de America

    Cantidad disponible: 10 disponibles

    PF. Condición: New.

  • Idioma: Inglés

    Editorial: Springer, 1994

    354057834X / 9783540578345

    • Tapa blanda

    Librería: Ria Christie Collections, Uxbridge, Reino UnidoRia Christie Collections

    Vendedor de 5 estrellas
    Contactar con el vendedor

    Condición: Nuevo

    EUR 121,03

    Envío por EUR 10,89 
    Se envía de Reino Unido a Estados Unidos de America

    Cantidad disponible: Más de 20 disponibles

    Condición: New. In English.

  • Idioma: Inglés

    Editorial: Springer Berlin Heidelberg, 1994

    354057834X / 9783540578345

    • Tapa blanda

    Librería: moluna, Greven, Alemaniamoluna

    Vendedor de 5 estrellas
    Contactar con el vendedor

    Condición: Nuevo

    EUR 92,27

    Envío por EUR 48,99 
    Se envía de Alemania a Estados Unidos de America

    Cantidad disponible: Más de 20 disponibles

    Condición: New.

  • Idioma: Inglés

    Editorial: Springer, 1994

    354057834X / 9783540578345

    • Tapa blanda

    Librería: Books Puddle, Woodside, NY, Estados Unidos de AmericaBooks Puddle

    Vendedor de 4 estrellas
    Contactar con el vendedor

    Condición: Nuevo

    EUR 146,45

    Envío por EUR 3,51 
    Se envía dentro de Estados Unidos de America

    Cantidad disponible: 4 disponibles

    Condición: New. pp. 164.

  • Idioma: Inglés

    Editorial: Springer, 1994

    354057834X / 9783540578345

    • Tapa blanda

    Librería: AHA-BUCH GmbH, Einbeck, AlemaniaAHA-BUCH GmbH

    Vendedor de 5 estrellas
    Contactar con el vendedor

    Condición: Nuevo

    EUR 117,28

    Envío por EUR 35,00 
    Se envía de Alemania a Estados Unidos de America

    Cantidad disponible: 1 disponibles

    Taschenbuch. Condición: Neu. Druck auf Anfrage Neuware - Printed after ordering - Within a project human and non-human resources are pulled together in a tempo raray organization in order to achieve a predefined goal (d. [20], p. 187). That is, in contrast to manufacturing management, project management is directed to an end. One major function of project management is the scheduling of the project. Project scheduling is the time-based arrangement of the activities comprising the project subject to precedence-, time-and resource-constraints (d. [4], p. 170). In the 1950's the standard methods MPM (Metra Potential Method) and CPM (Cri tical Path Method) were developed. Given deterministic durations and precedence constraints the minimum project length, time windows for the start times and critical paths can be calculated. At the same time another group of researchers developed the Program Evaluation and Review Technique (PERT) (d. [19], [73] and [90]). In contrast to MPM and CPM, random variables describe the activity durations. Based on the optimistic, most likely and pessimistic estimations of the activity durations an assumed Beta distribution is derived in order to calculate the distribution of the project duration, the critical events, the distribution of earliest and latest occurence of an event, the distribution of the slack of the events and the probability of exceeding a date. By the time the estimates of the distributions have been improved (d. e.g. [52] and [56]). Nevertheless, there are some points of critique concerning the estimation of the resulting distributions and probabilities (d. e.g. [48], [49] and [50]).…

  • Idioma: Inglés

    Editorial: Springer, 1994

    354057834X / 9783540578345

    • Tapa blanda

    Librería: Revaluation Books, Exeter, Reino UnidoRevaluation Books

    Vendedor de 5 estrellas
    Contactar con el vendedor

    Condición: Nuevo

    EUR 153,55

    Envío por EUR 11,63 
    Se envía de Reino Unido a Estados Unidos de America

    Cantidad disponible: 2 disponibles

    Paperback. Condición: Brand New. reprint edition. 154 pages. 9.20x6.10x0.37 inches. In Stock.

  • Idioma: Inglés

    Editorial: Springer, 1994

    354057834X / 9783540578345

    • Tapa blanda

    Librería: Mispah books, Redhill, SURRE, Reino UnidoMispah books

    Vendedor de 4 estrellas
    Contactar con el vendedor

    Condición: Usado - Como Nuevo

    EUR 164,06

    Envío por EUR 29,07 
    Se envía de Reino Unido a Estados Unidos de America

    Cantidad disponible: 1 disponibles

    Paperback. Condición: Like New. Like New. book.

  • Idioma: Inglés

    Editorial: Springer Spektrum, 1994

    354057834X / 9783540578345

    • Tapa blanda

    Librería: Buchpark, Trebbin, AlemaniaBuchpark

    Vendedor de 5 estrellas
    Contactar con el vendedor

    Condición: Usado - Bueno

    EUR 83,44

    Envío por EUR 105,00 
    Se envía de Alemania a Estados Unidos de America

    Cantidad disponible: 4 disponibles

    Condición: Gut. Zustand: Gut | Sprache: Englisch | Produktart: Bücher | Within a project human and non-human resources are pulled together in a tempo­ raray organization in order to achieve a predefined goal (d. [20], p. 187). That is, in contrast to manufacturing management, project management is directed to an end. One major function of project management is the scheduling of the project. Project scheduling is the time-based arrangement of the activities comprising the project subject to precedence-, time-and resource-constraints (d. [4], p. 170). In the 1950's the standard methods MPM (Metra Potential Method) and CPM (Cri­ tical Path Method) were developed. Given deterministic durations and precedence­ constraints the minimum project length, time windows for the start times and critical paths can be calculated. At the same time another group of researchers developed the Program Evaluation and Review Technique (PERT) (d. [19], [73] and [90]). In contrast to MPM and CPM, random variables describe the activity durations. Based on the optimistic, most likely and pessimistic estimations of the activity durations an assumed Beta­ distribution is derived in order to calculate the distribution of the project duration, the critical events, the distribution of earliest and latest occurence of an event, the distribution of the slack of the events and the probability of exceeding a date. By the time the estimates of the distributions have been improved (d. e.g. [52] and [56]). Nevertheless, there are some points of critique concerning the estimation of the resulting distributions and probabilities (d. e.g. [48], [49] and [50]).…

  • Idioma: Inglés

    Editorial: Springer Spektrum, 1994

    354057834X / 9783540578345

    • Tapa blanda

    Librería: Buchpark, Trebbin, AlemaniaBuchpark

    Vendedor de 5 estrellas
    Contactar con el vendedor

    Condición: Usado - Excelente

    EUR 85,94

    Envío por EUR 105,00 
    Se envía de Alemania a Estados Unidos de America

    Cantidad disponible: 1 disponibles

    Condición: Sehr gut. Zustand: Sehr gut | Sprache: Englisch | Produktart: Bücher | Within a project human and non-human resources are pulled together in a tempo­ raray organization in order to achieve a predefined goal (d. [20], p. 187). That is, in contrast to manufacturing management, project management is directed to an end. One major function of project management is the scheduling of the project. Project scheduling is the time-based arrangement of the activities comprising the project subject to precedence-, time-and resource-constraints (d. [4], p. 170). In the 1950's the standard methods MPM (Metra Potential Method) and CPM (Cri­ tical Path Method) were developed. Given deterministic durations and precedence­ constraints the minimum project length, time windows for the start times and critical paths can be calculated. At the same time another group of researchers developed the Program Evaluation and Review Technique (PERT) (d. [19], [73] and [90]). In contrast to MPM and CPM, random variables describe the activity durations. Based on the optimistic, most likely and pessimistic estimations of the activity durations an assumed Beta­ distribution is derived in order to calculate the distribution of the project duration, the critical events, the distribution of earliest and latest occurence of an event, the distribution of the slack of the events and the probability of exceeding a date. By the time the estimates of the distributions have been improved (d. e.g. [52] and [56]). Nevertheless, there are some points of critique concerning the estimation of the resulting distributions and probabilities (d. e.g. [48], [49] and [50]).…

  • Idioma: Inglés

    Editorial: Springer, Springer Spektrum Mai 1994, 1994

    354057834X / 9783540578345

    • Tapa blanda
    • Impresión bajo demanda

    Librería: BuchWeltWeit Ludwig Meier e.K., Bergisch Gladbach, AlemaniaBuchWeltWeit Ludwig Meier e.K.

    Vendedor de 5 estrellas
    Contactar con el vendedor

    Condición: Nuevo

    EUR 106,99

    Envío por EUR 23,00 
    Se envía de Alemania a Estados Unidos de America

    Cantidad disponible: 2 disponibles

    Taschenbuch. Condición: Neu. This item is printed on demand - it takes 3-4 days longer - Neuware -Within a project human and non-human resources are pulled together in a tempo raray organization in order to achieve a predefined goal (d. [20], p. 187). That is, in contrast to manufacturing management, project management is directed to an end. One major function of project management is the scheduling of the project. Project scheduling is the time-based arrangement of the activities comprising the project subject to precedence-, time-and resource-constraints (d. [4], p. 170). In the 1950's the standard methods MPM (Metra Potential Method) and CPM (Cri tical Path Method) were developed. Given deterministic durations and precedence constraints the minimum project length, time windows for the start times and critical paths can be calculated. At the same time another group of researchers developed the Program Evaluation and Review Technique (PERT) (d. [19], [73] and [90]). In contrast to MPM and CPM, random variables describe the activity durations. Based on the optimistic, most likely and pessimistic estimations of the activity durations an assumed Beta distribution is derived in order to calculate the distribution of the project duration, the critical events, the distribution of earliest and latest occurence of an event, the distribution of the slack of the events and the probability of exceeding a date. By the time the estimates of the distributions have been improved (d. e.g. [52] and [56]). Nevertheless, there are some points of critique concerning the estimation of the resulting distributions and probabilities (d. e.g. [48], [49] and [50]). 164 pp. Englisch.…

  • Idioma: Inglés

    Editorial: Springer, 1994

    354057834X / 9783540578345

    • Tapa blanda
    • Impresión bajo demanda

    Librería: Majestic Books, Hounslow, Reino UnidoMajestic Books

    Vendedor de 4 estrellas
    Contactar con el vendedor

    Condición: Nuevo

    EUR 151,57

    Envío por EUR 7,56 
    Se envía de Reino Unido a Estados Unidos de America

    Cantidad disponible: 4 disponibles

    Condición: New. Print on Demand pp. 164 49:B&W 6.14 x 9.21 in or 234 x 156 mm (Royal 8vo) Perfect Bound on White w/Gloss Lam.

  • Idioma: Inglés

    Editorial: Springer, 1994

    354057834X / 9783540578345

    • Tapa blanda
    • Impresión bajo demanda

    Librería: Biblios, frankfurt am main, HESSE, AlemaniaBiblios

    Vendedor de 4 estrellas
    Contactar con el vendedor

    Condición: Nuevo

    EUR 152,30

    Envío por EUR 9,95 
    Se envía de Alemania a Estados Unidos de America

    Cantidad disponible: 4 disponibles

    Condición: New. PRINT ON DEMAND pp. 164.

  • Más imágenes

    Idioma: Inglés

    Editorial: Springer, 1994

    354057834X / 9783540578345

    • Tapa blanda
    • Impresión bajo demanda

    Librería: preigu, Osnabrück, Alemaniapreigu

    Vendedor de 5 estrellas
    Contactar con el vendedor

    Condición: Nuevo

    EUR 95,70

    Envío por EUR 70,00 
    Se envía de Alemania a Estados Unidos de America

    Cantidad disponible: 5 disponibles

    Taschenbuch. Condición: Neu. Resource-Constrained Project Scheduling | Exact Methods for the Multi-Mode Case | Arno Sprecher | Taschenbuch | Lecture Notes in Economics and Mathematical Systems | xii | Englisch | 1994 | Springer | EAN 9783540578345 | Verantwortliche Person für die EU: Springer Verlag GmbH, Tiergartenstr. 17, 69121 Heidelberg, juergen[dot]hartmann[at]springer[dot]com | Anbieter: preigu Print on Demand.…

  • Idioma: Inglés

    Editorial: Springer, J.B. Metzler Mai 1994, 1994

    354057834X / 9783540578345

    • Tapa blanda
    • Impresión bajo demanda

    Librería: buchversandmimpf2000, Emtmannsberg, BAYE, Alemaniabuchversandmimpf2000

    Vendedor de 5 estrellas
    Contactar con el vendedor

    Condición: Nuevo

    EUR 106,99

    Envío por EUR 60,00 
    Se envía de Alemania a Estados Unidos de America

    Cantidad disponible: 1 disponibles

    Taschenbuch. Condición: Neu. This item is printed on demand - Print on Demand Titel. Neuware -Within a project human and non-human resources are pulled together in a tempo raray organization in order to achieve a predefined goal (d. [20], p. 187). That is, in contrast to manufacturing management, project management is directed to an end. One major function of project management is the scheduling of the project. Project scheduling is the time-based arrangement of the activities comprising the project subject to precedence-, time-and resource-constraints (d. [4], p. 170). In the 1950's the standard methods MPM (Metra Potential Method) and CPM (Cri tical Path Method) were developed. Given deterministic durations and precedence constraints the minimum project length, time windows for the start times and critical paths can be calculated. At the same time another group of researchers developed the Program Evaluation and Review Technique (PERT) (d. [19], [73] and [90]). In contrast to MPM and CPM, random variables describe the activity durations. Based on the optimistic, most likely and pessimistic estimations of the activity durations an assumed Beta distribution is derived in order to calculate the distribution of the project duration, the critical events, the distribution of earliest and latest occurence of an event, the distribution of the slack of the events and the probability of exceeding a date. By the time the estimates of the distributions have been improved (d. e.g. [52] and [56]). Nevertheless, there are some points of critique concerning the estimation of the resulting distributions and probabilities (d. e.g. [48], [49] and [50]).Springer-Verlag KG, Sachsenplatz 4-6, 1201 Wien 164 pp. Englisch. …