Temesgen tegabu (8 resultados)

Autor: 
Refinar con la Búsqueda avanzada

Filtrar la búsqueda

  • Libros (8)

  • Nuevo (8)

a

Intervalo de precios personalizado (EUR)

a

  • Idioma: Inglés

    Editorial: LAP LAMBERT Academic Publishing, 2018

    3659964670 / 9783659964671

    • Tapa blanda

    Librería: preigu, Osnabrück, Alemaniapreigu

    Vendedor de 5 estrellas
    Contactar con el vendedor

    Condición: Nuevo

    EUR 53,35

    Envío por EUR 70,00 
    Se envía de Alemania a Estados Unidos de America

    Cantidad disponible: 5 disponibles

    Taschenbuch. Condición: Neu. ROW Risk Management of Road Construction Projects in Urban Areas | A Case Study of Addis Ababa, Ethiopia | Temesgen Tegabu | Taschenbuch | 232 S. | Englisch | 2018 | LAP LAMBERT Academic Publishing | EAN 9783659964671 | Verantwortliche Person für die EU: BoD - Books on Demand, In de Tarpen 42, 22848 Norderstedt, info[at]bod[dot]de | Anbieter: preigu.…

  • Idioma: Inglés

    3659964670 / 9783659964671

    • Tapa blanda

    Librería: Books Puddle, Woodside, NY, Estados Unidos de AmericaBooks Puddle

    Vendedor de 4 estrellas
    Contactar con el vendedor

    Condición: Nuevo

    EUR 100,35

    Envío por EUR 3,50 
    Se envía dentro de Estados Unidos de America

    Cantidad disponible: 4 disponibles

    Condición: New.

  • Idioma: Inglés

    Editorial: LAP LAMBERT Academic Publishing Okt 2018, 2018

    3659964670 / 9783659964671

    • Tapa blanda
    • Impresión bajo demanda

    Librería: BuchWeltWeit Ludwig Meier e.K., Bergisch Gladbach, AlemaniaBuchWeltWeit Ludwig Meier e.K.

    Vendedor de 5 estrellas
    Contactar con el vendedor

    Condición: Nuevo

    EUR 61,90

    Envío por EUR 23,00 
    Se envía de Alemania a Estados Unidos de America

    Cantidad disponible: 2 disponibles

    Taschenbuch. Condición: Neu. This item is printed on demand - it takes 3-4 days longer - Neuware -Almost all Addis Ababa city road projects are exposed to time and cost overrun. Failure of roads also starts before the expected design period expires. The objective of this research is to identify the factors adversely affecting the objectives of AACRA road projects and to propose recommendation on how to deal with the problems. To achieve the objectives of the research, case study of 10 road projects selected from Addis Ababa, desk studies relevant to the subject matter and 10 interview responses from professionals from the client, consultants and contractors that have been currently working with AACRA have been rigorously assessed. The findings from the research show that the major problem for non-achieving project objectives of AACRA roads is the slow clearance of obstructions from ROW construction limit. There is no formal risk management entertained by any of the parties to address the issue. This book also introduces a Project Definition Rating Index (PDRI) tool which is believed by the researcher helpful to assess scope definition completeness at various stages of AACRA road preproject planning process. 232 pp. Englisch.…

  • Idioma: Inglés

    Editorial: LAP LAMBERT Academic Publishing

    3659964670 / 9783659964671

    • Tapa blanda
    • Impresión bajo demanda

    Librería: AHA-BUCH GmbH, Einbeck, AlemaniaAHA-BUCH GmbH

    Vendedor de 5 estrellas
    Contactar con el vendedor

    Condición: Nuevo

    EUR 64,02

    Envío por EUR 35,00 
    Se envía de Alemania a Estados Unidos de America

    Cantidad disponible: 1 disponibles

    Taschenbuch. Condición: Neu. nach der Bestellung gedruckt Neuware - Printed after ordering - Almost all Addis Ababa city road projects are exposed to time and cost overrun. Failure of roads also starts before the expected design period expires. The objective of this research is to identify the factors adversely affecting the objectives of AACRA road projects and to propose recommendation on how to deal with the problems. To achieve the objectives of the research, case study of 10 road projects selected from Addis Ababa, desk studies relevant to the subject matter and 10 interview responses from professionals from the client, consultants and contractors that have been currently working with AACRA have been rigorously assessed. The findings from the research show that the major problem for non-achieving project objectives of AACRA roads is the slow clearance of obstructions from ROW construction limit. There is no formal risk management entertained by any of the parties to address the issue. This book also introduces a Project Definition Rating Index (PDRI) tool which is believed by the researcher helpful to assess scope definition completeness at various stages of AACRA road preproject planning process.…

  • Idioma: Inglés

    Editorial: LAP LAMBERT Academic Publishing, 2018

    3659964670 / 9783659964671

    • Tapa blanda
    • Impresión bajo demanda

    Librería: moluna, Greven, Alemaniamoluna

    Vendedor de 5 estrellas
    Contactar con el vendedor

    Condición: Nuevo

    EUR 50,66

    Envío por EUR 48,99 
    Se envía de Alemania a Estados Unidos de America

    Cantidad disponible: Más de 20 disponibles

    Condición: New. Dieser Artikel ist ein Print on Demand Artikel und wird nach Ihrer Bestellung fuer Sie gedruckt. Autor/Autorin: Tegabu TemesgenTemesgen Tegabu, BSc, M.Sc: Studied Civil Engineering at Addis Ababa University, Ethiopia. Presently Claim Expert at DOHWA-IPE-MCE JV Consulting Engr. for Industrial Park Construction Projects in A.A. Also Fdr & GM at .…

  • Idioma: Inglés

    Editorial: LAP LAMBERT Academic Publishing Okt 2018, 2018

    3659964670 / 9783659964671

    • Tapa blanda
    • Impresión bajo demanda

    Librería: buchversandmimpf2000, Emtmannsberg, BAYE, Alemaniabuchversandmimpf2000

    Vendedor de 5 estrellas
    Contactar con el vendedor

    Condición: Nuevo

    EUR 61,90

    Envío por EUR 60,00 
    Se envía de Alemania a Estados Unidos de America

    Cantidad disponible: 1 disponibles

    Taschenbuch. Condición: Neu. This item is printed on demand - Print on Demand Titel. Neuware -Almost all Addis Ababa city road projects are exposed to time and cost overrun. Failure of roads also starts before the expected design period expires. The objective of this research is to identify the factors adversely affecting the objectives of AACRA road projects and to propose recommendation on how to deal with the problems. To achieve the objectives of the research, case study of 10 road projects selected from Addis Ababa, desk studies relevant to the subject matter and 10 interview responses from professionals from the client, consultants and contractors that have been currently working with AACRA have been rigorously assessed. The findings from the research show that the major problem for non-achieving project objectives of AACRA roads is the slow clearance of obstructions from ROW construction limit. There is no formal risk management entertained by any of the parties to address the issue. This book also introduces a Project Definition Rating Index (PDRI) tool which is believed by the researcher helpful to assess scope definition completeness at various stages of AACRA road preproject planning process.VDM Verlag, Dudweiler Landstraße 99, 66123 Saarbrücken 232 pp. Englisch.…

  • Idioma: Inglés

    3659964670 / 9783659964671

    • Tapa blanda
    • Impresión bajo demanda

    Librería: Majestic Books, Hounslow, Reino UnidoMajestic Books

    Vendedor de 4 estrellas
    Contactar con el vendedor

    Condición: Nuevo

    EUR 102,92

    Envío por EUR 7,56 
    Se envía de Reino Unido a Estados Unidos de America

    Cantidad disponible: 4 disponibles

    Condición: New. Print on Demand.

  • Idioma: Inglés

    3659964670 / 9783659964671

    • Tapa blanda
    • Impresión bajo demanda

    Librería: Biblios, frankfurt am main, HESSE, AlemaniaBiblios

    Vendedor de 4 estrellas
    Contactar con el vendedor

    Condición: Nuevo

    EUR 102,30

    Envío por EUR 9,95 
    Se envía de Alemania a Estados Unidos de America

    Cantidad disponible: 4 disponibles

    Condición: New. PRINT ON DEMAND.