Plessen dirk von (41 resultados)

- Tapa blanda
Librería: Home-set, Mannheim, AlemaniaHome-set
Contactar con el vendedorVendedor de 5 estrellasCondición: Nuevo
EUR 34,99
Envío por EUR 49,90Se envía de Alemania a Estados Unidos de AmericaCantidad disponible: 2 disponibles
Softcover/Taschenbuch. Condición: Neu. The International Olympic Committee announced on the 6th July 2005 that the Games of the 30th Olympiad in 2012 will take place in the city of London.This study aims to determine whether the procurement strategies chosen by the ODA are the right choice for delivering the two main venues in the Olympic Park in time, on budget and to the required quality. In order to answer this question, the approach of this study is to undertake extensive research in the subject area of construction procurement and to identify best practice in making procurement decisions for a project. In particular, the procurement strategies chosen by the ODA will be researched and their shortcomings identified. Based on this theoretical framework, the author will be able to undertake a systematic analysis of the decisions made by the ODA to procure the two most prestigious venues in the Olympic Park. As a main part of this analysis the author will conduct semistructured interviews with key people involved in the Olympics and with experts of MSc Management in Construction - the industry. Sprache: Englisch Gewicht in Gramm: 203.…

- Tapa blanda
Librería: California Books, Miami, FL, Estados Unidos de AmericaCalifornia Books
Contactar con el vendedorVendedor de 5 estrellasCondición: Nuevo
EUR 96,23
Envío por EUR 2,72Se envía dentro de Estados Unidos de AmericaCantidad disponible: Más de 20 disponibles
Condición: New.

- Tapa blanda
Librería: California Books, Miami, FL, Estados Unidos de AmericaCalifornia Books
Contactar con el vendedorVendedor de 5 estrellasCondición: Nuevo
EUR 96,23
Envío por EUR 2,72Se envía dentro de Estados Unidos de AmericaCantidad disponible: Más de 20 disponibles
Condición: New.

- Tapa blanda
Librería: Ria Christie Collections, Uxbridge, Reino UnidoRia Christie Collections
Contactar con el vendedorVendedor de 5 estrellasCondición: Nuevo
EUR 94,12
Envío por EUR 11,83Se envía de Reino Unido a Estados Unidos de AmericaCantidad disponible: Más de 20 disponibles
Condición: New. In English.

- Tapa blanda
Librería: Ria Christie Collections, Uxbridge, Reino UnidoRia Christie Collections
Contactar con el vendedorVendedor de 5 estrellasCondición: Nuevo
EUR 94,12
Envío por EUR 11,83Se envía de Reino Unido a Estados Unidos de AmericaCantidad disponible: Más de 20 disponibles
Condición: New. In English.

- Tapa blanda
Librería: preigu, Osnabrück, Alemaniapreigu
Contactar con el vendedorVendedor de 5 estrellasCondición: Nuevo
EUR 34,99
Envío por EUR 70,00Se envía de Alemania a Estados Unidos de AmericaCantidad disponible: 5 disponibles
Taschenbuch. Condición: Neu. The procurement strategies for the Olympic Stadium and the Aquatic Centre for the London 2012 Olympic Games | Dirk von Plessen | Taschenbuch | 120 S. | Englisch | 2014 | [.] | EAN 9783956366956 | Verantwortliche Person für die EU: Bedey & Thoms Media GmbH, Björn Bedey, Hermannstal 119k, 22119 Hamburg, info[at]diplom[dot]de | Anbieter: preigu. …

- Tapa blanda
Librería: preigu, Osnabrück, Alemaniapreigu
Contactar con el vendedorVendedor de 5 estrellasCondición: Nuevo
EUR 34,99
Envío por EUR 70,00Se envía de Alemania a Estados Unidos de AmericaCantidad disponible: 5 disponibles
Taschenbuch. Condición: Neu. The procurement strategies for the Olympic Stadium and the Aquatic Centre for the London 2012 Olympic Games | Dirk von Plessen | Taschenbuch | 120 S. | Englisch | 2018 | Anchor Academic Publishing | EAN 9783954893928 | Verantwortliche Person für die EU: Bedey & Thoms Media GmbH, Björn Bedey, Hermannstal 119k, 22119 Hamburg, info[at]diplom[dot]de | Anbieter: preigu.…

- Tapa dura
Librería: Home-set, Mannheim, AlemaniaHome-set
Contactar con el vendedorVendedor de 5 estrellasCondición: Nuevo
EUR 48,00
Envío por EUR 49,90Se envía de Alemania a Estados Unidos de AmericaCantidad disponible: 2 disponibles
Softcover/Taschenbuch. Condición: Neu. Inhaltsangabe:Einleitung: Der relativ junge Markt f?r mobile Kommunikation ist weltweit als einer der dynamischsten und schnelllebigsten anzusehen. Innovationsf?higkeit und Anpassungsverm?gen sind gefragt, m?chte man als Unternehmen auch unter dem Aspekt eines sich immer weiter versch?rfenden internationalen Wettbewerbs den Erfolg f?r die Zukunft sichern. Dies gilt in gleichem Ma?e sowohl f?r die Produkthersteller und Netzbetreiber dieser Branche als auch f?r die Unternehmen, die die Grundlage f?r ein leistungsf?higes Telekommunikationssystem schaffen. Der Aufbau einer Infrastruktur von Mobilfunkstationen tr?gt in erheblichem Umfang dazu bei, wann, zu welchen Preisen und mit welcher Qualit?t der Endkunde den Service erf?hrt. Zurzeit existieren in Deutschland ca. 35.000 solcher Mobilfunkstationen, um mehr als 50 Millionen Kunden eine Verbindung zu erm?glichen. Erst in j?ngster Vergangenheit haben sechs Netzbetreiber in Deutschland erneut in die Zukunft investiert und Milliardensummen f?r den Erwerb von Lizenzen gezahlt. Weitere Milliardenbetr?ge werden nun erforderlich, um mit bis zu 50.000 zus?tzlichen Mobilfunkstationen dem Kunden die Dienste anbieten zu k?nnen. Aufgrund der daf?r notwendigen hohen Finanzierungskosten sucht die Branche nach L?sungen, die Kosten f?r den Netzaufbau unter der Ma?gabe gleich bleibender Qualit?t und m?glichst schneller Realisierung zu senken. Dies stellt f?r die ausf?hrenden Unternehmen eine schwierige Ausgangssituation dar, da gerade die Qualit?tsstandards in dieser Branche als besonders herausfordernd anzusehen sind. Das sich damit auf das Leistungsangebot der Unternehmung auswirkende Spannungsfeld zwischen Qualit?t, Kosten und Zeit gilt es im unternehmensspezifischen Leistungsprozess zu beherrschen. Die Beherrschung ist dabei als eine wichtige Managementaufgabe zu verstehen und ist in einem System zum Qualit?tsmanagement zu konzipieren. Es gilt die t?tigkeitsfeldspezifischen Qualit?ten unter dem Einfluss vieler Parameter zu identifizieren und entsprechend den Kundenanforderungen zu realisieren. Die Einf?hrung eines solchen Systems unter Anwendung der Normreihe DIN ISO 9000:1994 ist in der Baubranche heute weit verbreitet, bringt jedoch aufgrund der Industrieorientierung dieser Norm viele Probleme mit sich. Durch die auf die Produktion ausgerichtete Struktur der Norm ist die ?bertragbarkeit der Forderungen auf den unternehmensspezifischen Leistungsprozess nur begrenzt m?glich. Das erschwert die Einbeziehung [.] De Gewicht in Gramm: 202.…

- Tapa blanda
Librería: California Books, Miami, FL, Estados Unidos de AmericaCalifornia Books
Contactar con el vendedorVendedor de 5 estrellasCondición: Nuevo
EUR 101,84
Envío por EUR 2,72Se envía dentro de Estados Unidos de AmericaCantidad disponible: Más de 20 disponibles
Condición: New.

- Tapa blanda
Librería: Ria Christie Collections, Uxbridge, Reino UnidoRia Christie Collections
Contactar con el vendedorVendedor de 5 estrellasCondición: Nuevo
EUR 100,21
Envío por EUR 11,83Se envía de Reino Unido a Estados Unidos de AmericaCantidad disponible: Más de 20 disponibles
Condición: New. In English.
Más imágenes- Tapa blanda
Librería: preigu, Osnabrück, Alemaniapreigu
Contactar con el vendedorVendedor de 5 estrellasCondición: Nuevo
EUR 48,00
Envío por EUR 70,00Se envía de Alemania a Estados Unidos de AmericaCantidad disponible: 5 disponibles
Taschenbuch. Condición: Neu. Qualitätsmanagement beim Bau von schlüsselfertigen Mobilfunkstationen | Dirk von Plessen | Taschenbuch | 132 S. | Deutsch | 2002 | [.] | EAN 9783838661339 | Verantwortliche Person für die EU: Bedey und Thoms Media GmbH, Hermannstal 119k, 22119 Hamburg, kontakt[at]bedey-media[dot]de | Anbieter: preigu. …

- Tapa blanda
Librería: Mispah books, Redhill, SURRE, Reino UnidoMispah books
Contactar con el vendedorVendedor de 4 estrellasCondición: Usado - Como Nuevo
EUR 171,63
Envío por EUR 29,97Se envía de Reino Unido a Estados Unidos de AmericaCantidad disponible: 1 disponible
Paperback. Condición: Like New. LIKE NEW. SHIPS FROM MULTIPLE LOCATIONS. book.

- Tapa blanda
- Impresión bajo demanda
Librería: BuchWeltWeit Ludwig Meier e.K., Bergisch Gladbach, AlemaniaBuchWeltWeit Ludwig Meier e.K.
Contactar con el vendedorVendedor de 5 estrellasCondición: Nuevo
EUR 34,99
Envío por EUR 23,00Se envía de Alemania a Estados Unidos de AmericaCantidad disponible: 2 disponibles
Taschenbuch. Condición: Neu. This item is printed on demand - it takes 3-4 days longer - Neuware -The International Olympic Committee announced on the 6th July 2005 that the Games of the 30th Olympiad in 2012 will take place in the city of London.Three years later, a lot of preparation work has already been done to get London ready for hosting the world's most prestigious sporting occasion. Over 192 buildings have been demolished, one million cubic metres of soil excavated, two six kilometer tunnels and 200km of cabling are completed, and most of the contractors for the new sporting facilities are appointed.The Olympic Park will be at the centre of this large development project and spans two million square metres of the Lower Lea Valley in East London. Most of the new build venues and sporting facilities will be sited here; amongst them are the two flagship venues: the Olympic Stadium and the Aquatics Centre. The construction and operation of these sports facilities for the Games will be undertaken by the London Organising Committee of the Olympic Games (LOCOG). The delivery of the venues in time, within budget and to the required standard, however, is the responsibility of the Olympic Delivery Authority (ODA). The ODA is a non-departmental public body and acts in essence as the delivery organisation for all the construction activity. In the Pre-Olympic phase (2005- 2011) the construction of the Olympic venues will be at the centre of public attention, and scrutiny. Construction industry practices will be placed under the microscope in the time leading up to the Games, especially the ODA's developed and introduced strategy for procuring the infrastructure.This study aims to determine whether the procurement strategies chosen by the ODA are the right choice for delivering the two main venues in the Olympic Park in time, on budget and to the required quality. In order to answer this question, the approach of this study is to undertake extensive research in the subject area of construction procurement and to identify best practice in making procurement decisions for a project. In particular, the procurement strategies chosen by the ODA will be researched and their shortcomings identified. Based on this theoretical framework, the author will be able to undertake a systematic analysis of the decisions made by the ODA to procure the two most prestigious venues in the Olympic Park. As a main part of this analysis the author will conduct semistructured interviews with key people involved in the Olympics and with experts of MSc Management in Construction - the industry. 120 pp. Englisch.…

- Tapa blanda
- Impresión bajo demanda
Librería: BuchWeltWeit Ludwig Meier e.K., Bergisch Gladbach, AlemaniaBuchWeltWeit Ludwig Meier e.K.
Contactar con el vendedorVendedor de 5 estrellasCondición: Nuevo
EUR 34,99
Envío por EUR 23,00Se envía de Alemania a Estados Unidos de AmericaCantidad disponible: 2 disponibles
Taschenbuch. Condición: Neu. This item is printed on demand - it takes 3-4 days longer - Neuware -Master's Thesis from the year 2009 in the subject Engineering - Metal Engineering / Metal Processing / Metal Structure, grade: A, Kingston University London, language: English, abstract: The study aims to determine [hypothesis] whether the procurement strategies chosen by the ODA (Olympic Delivery Authority) are the right choice for delivering the two main venues in the Olympic Park in time, on budget and to the required quality.In order to answer this question, the approach of this study is to undertake extensive research in the subject area of construction procurement and to identify best practice in making procurement decisions for a project. In particular, the procurement strategies chosen by the ODA will be researched and their shortcomings identified. Based on this theoretical framework, the author will be able to undertake a systematic analysis of the decisions made by the ODA to procure the two most prestigious venues in the Olympic Park.As a main part of this analysis the author will conduct semi- structured interviews with key people involved in the Olympics and with experts of the industry. Both the literature review and the interviews will help to achieve the main research objectives of this study, which are summarised below: Obtain a better understanding of construction procurement and the key areas affecting the project success Identify best practice in selecting a procurement method and to make out the pitfalls and the shortcomings of the procurement strategies that are used for both venues Understand why these procurement decisions were made and identify if best practice was followed by the ODA during its procurement process and if the pitfalls of the chosen strategies were counteracted Determine if the chosen procurement strategies fit the client & the project 120 pp. Englisch.…

- Tapa blanda
- Impresión bajo demanda
Librería: Majestic Books, Hounslow, Reino UnidoMajestic Books
Contactar con el vendedorVendedor de 4 estrellasCondición: Nuevo
EUR 60,72
Envío por EUR 7,79Se envía de Reino Unido a Estados Unidos de AmericaCantidad disponible: 4 disponibles
Condición: New. Print on Demand.

- Tapa blanda
- Impresión bajo demanda
Librería: Books Puddle, Woodside, NY, Estados Unidos de AmericaBooks Puddle
Contactar con el vendedorVendedor de 4 estrellasCondición: Nuevo
EUR 65,68
Envío por EUR 3,62Se envía dentro de Estados Unidos de AmericaCantidad disponible: 4 disponibles
Condición: New. Print on Demand.

- Tapa blanda
- Impresión bajo demanda
Librería: AHA-BUCH GmbH, Einbeck, AlemaniaAHA-BUCH GmbH
Contactar con el vendedorVendedor de 5 estrellasCondición: Nuevo
EUR 34,99
Envío por EUR 35,00Se envía de Alemania a Estados Unidos de AmericaCantidad disponible: 1 disponible
Taschenbuch. Condición: Neu. nach der Bestellung gedruckt Neuware - Printed after ordering - The International Olympic Committee announced on the 6th July 2005 that the Games of the 30th Olympiad in 2012 will take place in the city of London.Three years later, a lot of preparation work has already been done to get London ready for hosting the world's most prestigious sporting occasion. Over 192 buildings have been demolished, one million cubic metres of soil excavated, two six kilometer tunnels and 200km of cabling are completed, and most of the contractors for the new sporting facilities are appointed.The Olympic Park will be at the centre of this large development project and spans two million square metres of the Lower Lea Valley in East London. Most of the new build venues and sporting facilities will be sited here; amongst them are the two flagship venues: the Olympic Stadium and the Aquatics Centre. The construction and operation of these sports facilities for the Games will be undertaken by the London Organising Committee of the Olympic Games (LOCOG). The delivery of the venues in time, within budget and to the required standard, however, is the responsibility of the Olympic Delivery Authority (ODA). The ODA is a non-departmental public body and acts in essence as the delivery organisation for all the construction activity. In the Pre-Olympic phase (2005- 2011) the construction of the Olympic venues will be at the centre of public attention, and scrutiny. Construction industry practices will be placed under the microscope in the time leading up to the Games, especially the ODA's developed and introduced strategy for procuring the infrastructure.This study aims to determine whether the procurement strategies chosen by the ODA are the right choice for delivering the two main venues in the Olympic Park in time, on budget and to the required quality. In order to answer this question, the approach of this study is to undertake extensive research in the subject area of construction procurement and to identify best practice in making procurement decisions for a project. In particular, the procurement strategies chosen by the ODA will be researched and their shortcomings identified. Based on this theoretical framework, the author will be able to undertake a systematic analysis of the decisions made by the ODA to procure the two most prestigious venues in the Olympic Park. As a main part of this analysis the author will conduct semistructured interviews with key people involved in the Olympics and with experts of MSc Management in Construction - the industry.…

- Tapa blanda
- Impresión bajo demanda
Librería: AHA-BUCH GmbH, Einbeck, AlemaniaAHA-BUCH GmbH
Contactar con el vendedorVendedor de 5 estrellasCondición: Nuevo
EUR 34,99
Envío por EUR 35,00Se envía de Alemania a Estados Unidos de AmericaCantidad disponible: 1 disponible
Taschenbuch. Condición: Neu. nach der Bestellung gedruckt Neuware - Printed after ordering - Master's Thesis from the year 2009 in the subject Engineering - Metal Engineering / Metal Processing / Metal Structure, grade: A, Kingston University London, language: English, abstract: The study aims to determine [hypothesis] whether the procurement strategies chosen by the ODA (Olympic Delivery Authority) are the right choice for delivering the two main venues in the Olympic Park in time, on budget and to the required quality.In order to answer this question, the approach of this study is to undertake extensive research in the subject area of construction procurement and to identify best practice in making procurement decisions for a project. In particular, the procurement strategies chosen by the ODA will be researched and their shortcomings identified. Based on this theoretical framework, the author will be able to undertake a systematic analysis of the decisions made by the ODA to procure the two most prestigious venues in the Olympic Park.As a main part of this analysis the author will conduct semi- structured interviews with key people involved in the Olympics and with experts of the industry. Both the literature review and the interviews will help to achieve the main research objectives of this study, which are summarised below: Obtain a better understanding of construction procurement and the key areas affecting the project success Identify best practice in selecting a procurement method and to make out the pitfalls and the shortcomings of the procurement strategies that are used for both venues Understand why these procurement decisions were made and identify if best practice was followed by the ODA during its procurement process and if the pitfalls of the chosen strategies were counteracted Determine if the chosen procurement strategies fit the client & the project.…

- Tapa blanda
- Impresión bajo demanda
Librería: Biblios, frankfurt am main, HESSE, AlemaniaBiblios
Contactar con el vendedorVendedor de 4 estrellasCondición: Nuevo
EUR 60,54
Envío por EUR 9,95Se envía de Alemania a Estados Unidos de AmericaCantidad disponible: 4 disponibles
Condición: New. PRINT ON DEMAND.

- Tapa blanda
- Impresión bajo demanda
Librería: Majestic Books, Hounslow, Reino UnidoMajestic Books
Contactar con el vendedorVendedor de 4 estrellasCondición: Nuevo
EUR 77,45
Envío por EUR 7,79Se envía de Reino Unido a Estados Unidos de AmericaCantidad disponible: 4 disponibles
Condición: New. Print on Demand pp. 120.

- Tapa blanda
- Impresión bajo demanda
Librería: Books Puddle, Woodside, NY, Estados Unidos de AmericaBooks Puddle
Contactar con el vendedorVendedor de 4 estrellasCondición: Nuevo
EUR 82,44
Envío por EUR 3,62Se envía dentro de Estados Unidos de AmericaCantidad disponible: 4 disponibles
Condición: New. Print on Demand pp. 120.

- Tapa blanda
- Impresión bajo demanda
Librería: moluna, Greven, Alemaniamoluna
Contactar con el vendedorVendedor de 5 estrellasCondición: Nuevo
EUR 34,99
Envío por EUR 48,99Se envía de Alemania a Estados Unidos de AmericaCantidad disponible: Más de 20 disponibles
Condición: New. Dieser Artikel ist ein Print on Demand Artikel und wird nach Ihrer Bestellung fuer Sie gedruckt. The International Olympic Committee announced on the 6th July 2005 that the Games of the 30th Olympiad in 2012 will take place in the city of London.Three years later, a lot of preparation work has already been done to get London ready for hosting the.…

- Tapa blanda
- Impresión bajo demanda
Librería: moluna, Greven, Alemaniamoluna
Contactar con el vendedorVendedor de 5 estrellasCondición: Nuevo
EUR 34,99
Envío por EUR 48,99Se envía de Alemania a Estados Unidos de AmericaCantidad disponible: Más de 20 disponibles
Condición: New. Dieser Artikel ist ein Print on Demand Artikel und wird nach Ihrer Bestellung fuer Sie gedruckt. Master s Thesis from the year 2009 in the subject Engineering - Metal Engineering / Metal Processing / Metal Structure, grade: A, Kingston University London, language: English, abstract: The study aims to determine [hypothesis] whether the procurement strat. …

- Tapa blanda
- Impresión bajo demanda
Librería: Biblios, frankfurt am main, HESSE, AlemaniaBiblios
Contactar con el vendedorVendedor de 4 estrellasCondición: Nuevo
EUR 77,23
Envío por EUR 9,95Se envía de Alemania a Estados Unidos de AmericaCantidad disponible: 4 disponibles
Condición: New. PRINT ON DEMAND pp. 120.

- Tapa blanda
- Impresión bajo demanda
Librería: Chiron Media, Wallingford, Reino UnidoChiron Media
Contactar con el vendedorVendedor de 5 estrellasCondición: Nuevo
EUR 83,31
Envío por EUR 5,38Se envía de Reino Unido a Estados Unidos de AmericaCantidad disponible: 20 disponibles
PF. Condición: New. This item is printed on demand. Brand new book, sourced directly from publisher. Dispatch time is 6-7 days from our warehouse. Book will be sent in robust, secure packaging to ensure it reaches you securely.

- Tapa blanda
- Impresión bajo demanda
Librería: Chiron Media, Wallingford, Reino UnidoChiron Media
Contactar con el vendedorVendedor de 5 estrellasCondición: Nuevo
EUR 83,31
Envío por EUR 5,38Se envía de Reino Unido a Estados Unidos de AmericaCantidad disponible: 20 disponibles
PF. Condición: New. This item is printed on demand. Brand new book, sourced directly from publisher. Dispatch time is 6-7 days from our warehouse. Book will be sent in robust, secure packaging to ensure it reaches you securely.

- Tapa blanda
- Impresión bajo demanda
Librería: PBShop.store US, Wood Dale, IL, Estados Unidos de AmericaPBShop.store US
Contactar con el vendedorVendedor de 5 estrellasCondición: Nuevo
EUR 91,37
Gastos de envío gratisSe envía dentro de Estados Unidos de AmericaCantidad disponible: Más de 20 disponibles
PAP. Condición: New. New Book. Shipped from UK. THIS BOOK IS PRINTED ON DEMAND. Established seller since 2000.

- Tapa blanda
- Impresión bajo demanda
Librería: PBShop.store US, Wood Dale, IL, Estados Unidos de AmericaPBShop.store US
Contactar con el vendedorVendedor de 5 estrellasCondición: Nuevo
EUR 91,50
Gastos de envío gratisSe envía dentro de Estados Unidos de AmericaCantidad disponible: Más de 20 disponibles
PAP. Condición: New. New Book. Shipped from UK. THIS BOOK IS PRINTED ON DEMAND. Established seller since 2000.

- Tapa blanda
- Impresión bajo demanda
Librería: PBShop.store UK, Fairford, GLOS, Reino UnidoPBShop.store UK
Contactar con el vendedorVendedor de 5 estrellasCondición: Nuevo
EUR 88,39
Envío por EUR 3,94Se envía de Reino Unido a Estados Unidos de AmericaCantidad disponible: Más de 20 disponibles
PAP. Condición: New. New Book. Delivered from our UK warehouse in 4 to 14 business days. THIS BOOK IS PRINTED ON DEMAND. Established seller since 2000.

- Tapa blanda
- Impresión bajo demanda
Librería: PBShop.store UK, Fairford, GLOS, Reino UnidoPBShop.store UK
Contactar con el vendedorVendedor de 5 estrellasCondición: Nuevo
EUR 88,39
Envío por EUR 3,94Se envía de Reino Unido a Estados Unidos de AmericaCantidad disponible: Más de 20 disponibles
PAP. Condición: New. New Book. Delivered from our UK warehouse in 4 to 14 business days. THIS BOOK IS PRINTED ON DEMAND. Established seller since 2000.