Librería: ThriftBooks-Atlanta, AUSTELL, GA, Estados Unidos de America
EUR 8,95
Cantidad disponible: 1 disponibles
Añadir al carritoPaperback. Condición: Good. No Jacket. Pages can have notes/highlighting. Spine may show signs of wear. ~ ThriftBooks: Read More, Spend Less.
Librería: Chiron Media, Wallingford, Reino Unido
EUR 57,01
Cantidad disponible: 10 disponibles
Añadir al carritoPF. Condición: New.
Librería: Ria Christie Collections, Uxbridge, Reino Unido
EUR 60,69
Cantidad disponible: Más de 20 disponibles
Añadir al carritoCondición: New. In.
Librería: Revaluation Books, Exeter, Reino Unido
EUR 78,33
Cantidad disponible: 2 disponibles
Añadir al carritoPaperback. Condición: Brand New. spi rep edition. 171 pages. 9.61x6.70x0.40 inches. In Stock.
Librería: AHA-BUCH GmbH, Einbeck, Alemania
EUR 53,49
Cantidad disponible: 1 disponibles
Añadir al carritoTaschenbuch. Condición: Neu. Druck auf Anfrage Neuware - Printed after ordering - Group Technology (GT) as a manufacturing concept has gained steady interest within the machine building industry all over the world. Originally it was used more or less only in the so-called parts family manufacturing concept. With growing opportunities for using the computer in the design process, operating planning and layout planning, the potential advantages became more and more obvious. In order to implement GT successfully and with a view to improving the overall economic situation of a production company, it is necessary to consider all aspects of the com plete manufacturing system. Experience has shown, that in the first stage a general basis has to be formed. This is done by a clear and practical definition of three GT manufacturing systems, the devel opment of a set of classification systems for work pieces, working operations and man ufacturing equipment, and in building a data bank from which a data basis for the GT planning process can be evaluated. A second stage of implementation then considers the particular aspects of GT. These are, firstly, a concept for layout and investment planning based on a representative parts spectrum; secondly, for application of the GT-idea in the design process three similar types of parts are to be developed as a logical supplement to the standard and recurring parts practice; thirdly, a three stage process planning and work measurement system can be developed for the so defined spectrum of similar parts.
Librería: Mispah books, Redhill, SURRE, Reino Unido
EUR 111,11
Cantidad disponible: 1 disponibles
Añadir al carritoPaperback. Condición: Very Good. Dust Jacket may NOT BE INCLUDED.CDs may be missing. SHIPS FROM MULTIPLE LOCATIONS. book.