Isbn: 9798183929010 - an introduction to environmental technical requirements for professional engineers: 41 (civil engineering) (6 resultados)

Idioma: Inglés
Editorial: Independently published, 2026
- Tapa blanda
Librería: PBShop.store US, Wood Dale, IL, Estados Unidos de AmericaPBShop.store US
Contactar con el vendedorVendedor de 5 estrellasCondición: Nuevo
EUR 47,12
Gastos de envío gratisSe envía dentro de Estados Unidos de AmericaCantidad disponible: Más de 20 disponibles
PAP. Condición: New. New Book. Shipped from UK. Established seller since 2000.

Idioma: Inglés
Editorial: Independently published, 2026
- Tapa blanda
Librería: PBShop.store UK, Fairford, GLOS, Reino UnidoPBShop.store UK
Contactar con el vendedorVendedor de 5 estrellasCondición: Nuevo
EUR 44,98
Envío por EUR 3,83Se envía de Reino Unido a Estados Unidos de AmericaCantidad disponible: Más de 20 disponibles
PAP. Condición: New. New Book. Shipped from UK. Established seller since 2000.

Idioma: Inglés
Editorial: Independently Published Jun 2026, 2026
- Tapa blanda
Librería: AHA-BUCH GmbH, Einbeck, AlemaniaAHA-BUCH GmbH
Contactar con el vendedorVendedor de 5 estrellasCondición: Nuevo
EUR 83,27
Envío por EUR 35,00Se envía de Alemania a Estados Unidos de AmericaCantidad disponible: 2 disponibles
Taschenbuch. Condición: Neu. Neuware - Identify, assist, or provide, as applicable, all permits, approvals and fees required for the design, construction and operation of the proposed project from Federal, state and local regulatory authorities or overseas equivalent. Licensure in the state where the project is located may be required to obtain permits and approvals. Coordinate with the Installation Environmental (EV) staff or the Environmental Planning Function (EPF) to obtain the project NEPA documentation, as applicable, for project specific requirements. For areas outside of the United States and its territories and possessions with host nation agreements, follow design approval procedure as directed in project scope and by the Government Project Manager. For areas outside of the United States and its territories and possessions without Host nation agreements, the Government will review and approve environmental plans. Identify all regulatory notification requirements in accordance with Federal, state, and local regulations. Where the Government needs to provide public notification, coordinate with the Government Project Manager and the Installation EV staff. Require the Contractor to provide copies of all regulatory notifications to the Government Project Manager and the Installation EV staff. Typically, regulatory notifications are provided for the following (this listing is not all inclusive): demolition, renovation, national pollutant discharge elimination system defined site work, or remediation of hazardous materials (such as asbestos, hazardous waste, and lead-based paint).…

Idioma: Inglés
Editorial: Independently Published, 2026
- Tapa blanda
- Impresión bajo demanda
Librería: Grand Eagle Retail, Bensenville, IL, Estados Unidos de AmericaGrand Eagle Retail
Contactar con el vendedorVendedor de 5 estrellasCondición: Nuevo
EUR 44,98
Gastos de envío gratisSe envía dentro de Estados Unidos de AmericaCantidad disponible: 1 disponibles
Paperback. Condición: new. Paperback. Identify, assist, or provide, as applicable, all permits, approvals and fees required for the design, construction and operation of the proposed project from Federal, state and local regulatory authorities or overseas equivalent. Licensure in the state where the project is located may be required to obtain permits and approvals. Coordinate with the Installation Environmental (EV) staff or the Environmental Planning Function (EPF) to obtain the project NEPA documentation, as applicable, for project specific requirements. For areas outside of the United States and its territories and possessions with host nation agreements, follow design approval procedure as directed in project scope and by the Government Project Manager. For areas outside of the United States and its territories and possessions without Host nation agreements, the Government will review and approve environmental plans. Identify all regulatory notification requirements in accordance with Federal, state, and local regulations. Where the Government needs to provide public notification, coordinate with the Government Project Manager and the Installation EV staff. Require the Contractor to provide copies of all regulatory notifications to the Government Project Manager and the Installation EV staff. Typically, regulatory notifications are provided for the following (this listing is not all inclusive): demolition, renovation, national pollutant discharge elimination system defined site work, or remediation of hazardous materials (such as asbestos, hazardous waste, and lead-based paint). This item is printed on demand. Shipping may be from multiple locations in the US or from the UK, depending on stock availability.…

Idioma: Inglés
Editorial: Independently published, 2026
- Tapa blanda
- Impresión bajo demanda
Librería: California Books, Miami, FL, Estados Unidos de AmericaCalifornia Books
Contactar con el vendedorVendedor de 4 estrellasCondición: Nuevo
EUR 44,99
Gastos de envío gratisSe envía dentro de Estados Unidos de AmericaCantidad disponible: Más de 20 disponibles
Condición: New. Print on Demand.

Idioma: Inglés
Editorial: Independently Published, 2026
- Tapa blanda
- Impresión bajo demanda
Librería: CitiRetail, Stevenage, Reino UnidoCitiRetail
Contactar con el vendedorVendedor de 5 estrellasCondición: Nuevo
EUR 49,81
Envío por EUR 43,13Se envía de Reino Unido a Estados Unidos de AmericaCantidad disponible: 1 disponibles
Paperback. Condición: new. Paperback. Identify, assist, or provide, as applicable, all permits, approvals and fees required for the design, construction and operation of the proposed project from Federal, state and local regulatory authorities or overseas equivalent. Licensure in the state where the project is located may be required to obtain permits and approvals. Coordinate with the Installation Environmental (EV) staff or the Environmental Planning Function (EPF) to obtain the project NEPA documentation, as applicable, for project specific requirements. For areas outside of the United States and its territories and possessions with host nation agreements, follow design approval procedure as directed in project scope and by the Government Project Manager. For areas outside of the United States and its territories and possessions without Host nation agreements, the Government will review and approve environmental plans. Identify all regulatory notification requirements in accordance with Federal, state, and local regulations. Where the Government needs to provide public notification, coordinate with the Government Project Manager and the Installation EV staff. Require the Contractor to provide copies of all regulatory notifications to the Government Project Manager and the Installation EV staff. Typically, regulatory notifications are provided for the following (this listing is not all inclusive): demolition, renovation, national pollutant discharge elimination system defined site work, or remediation of hazardous materials (such as asbestos, hazardous waste, and lead-based paint). This item is printed on demand. Shipping may be from our UK warehouse or from our Australian or US warehouses, depending on stock availability.…