Idioma: Inglés
Publicado por LAP LAMBERT Academic Publishing, 2018
ISBN 10: 6139896835 ISBN 13: 9786139896837
Librería: preigu, Osnabrück, Alemania
EUR 60,95
Cantidad disponible: 5 disponibles
Añadir al carritoTaschenbuch. Condición: Neu. A Study on Impact of Critical Machine(s) in a Production Environment | R. Pugazhenthi (u. a.) | Taschenbuch | 192 S. | Englisch | 2018 | LAP LAMBERT Academic Publishing | EAN 9786139896837 | Verantwortliche Person für die EU: BoD - Books on Demand, In de Tarpen 42, 22848 Norderstedt, info[at]bod[dot]de | Anbieter: preigu.
Idioma: Inglés
Publicado por LAP LAMBERT Academic Publishing, 2018
ISBN 10: 6139896835 ISBN 13: 9786139896837
Librería: Revaluation Books, Exeter, Reino Unido
EUR 129,87
Cantidad disponible: 1 disponibles
Añadir al carritoPaperback. Condición: Brand New. 192 pages. 8.66x5.91x0.44 inches. In Stock.
Idioma: Inglés
Publicado por LAP LAMBERT Academic Publishing Aug 2018, 2018
ISBN 10: 6139896835 ISBN 13: 9786139896837
Librería: BuchWeltWeit Ludwig Meier e.K., Bergisch Gladbach, Alemania
EUR 71,90
Cantidad disponible: 2 disponibles
Añadir al carritoTaschenbuch. Condición: Neu. This item is printed on demand - it takes 3-4 days longer - Neuware -In the present global manufacturing scenario, the manufacturers are in a need to produce a variety of products in mass with limited resources and constraints. Many tasks like cost reduction, resource utilization, inventory control and human resource management are to be addressed in a typical production environment. Since the manufacturing methods remain fixed well, the production schedule is to be optimized for the effective utilization of machines with proper control. Scheduling and sequencing is the most successful tool to provide optimal solution in any production scenario. There are varieties of shop floor environments with many objectives based on the demand. These objectives are influenced by critical resources/machines in it. Since, the due date based scheduling is the primary objective of any shop floor environment, the influence of critical machine(s) on time is to be studied. Therefore, this research focuses towards the study on impact of critical resources/machines for due date based scheduling. In order to accomplish this, the due date is assumed as lower bound and three corollaries are developed based on the objective of minimizing makespan from/to the lower bound. 192 pp. Englisch.
Idioma: Inglés
Publicado por LAP LAMBERT Academic Publishing, 2018
ISBN 10: 6139896835 ISBN 13: 9786139896837
Librería: moluna, Greven, Alemania
EUR 58,12
Cantidad disponible: Más de 20 disponibles
Añadir al carritoCondición: New. Dieser Artikel ist ein Print on Demand Artikel und wird nach Ihrer Bestellung fuer Sie gedruckt. Autor/Autorin: Pugazhenthi R.Prof. Dr. R. Pugazhenthi is currently working as a Professor in Department of Mechanical Engineering, VITAS, Chennai, India. He was awarded doctorate in Mechanical Engineering at VIT University, Vellore in 2015. He has .
Idioma: Inglés
Publicado por LAP LAMBERT Academic Publishing Aug 2018, 2018
ISBN 10: 6139896835 ISBN 13: 9786139896837
Librería: buchversandmimpf2000, Emtmannsberg, BAYE, Alemania
EUR 71,90
Cantidad disponible: 1 disponibles
Añadir al carritoTaschenbuch. Condición: Neu. This item is printed on demand - Print on Demand Titel. Neuware -In the present global manufacturing scenario, the manufacturers are in a need to produce a variety of products in mass with limited resources and constraints. Many tasks like cost reduction, resource utilization, inventory control and human resource management are to be addressed in a typical production environment. Since the manufacturing methods remain fixed well, the production schedule is to be optimized for the effective utilization of machines with proper control. Scheduling and sequencing¿ is the most successful tool to provide optimal solution in any production scenario. ¿There are varieties of shop floor environments with many objectives based on the demand. These objectives are influenced by critical resources/machines in it. Since, the due date based scheduling is the primary objective of any shop floor environment, the influence of critical machine(s) on time is to be studied. Therefore, this research focuses towards the study on impact of critical resources/machines for due date based scheduling. In order to accomplish this, the due date is assumed as lower bound and three corollaries are developed based on the objective of minimizing makespan from/to the lower bound.VDM Verlag, Dudweiler Landstraße 99, 66123 Saarbrücken 192 pp. Englisch.
Idioma: Inglés
Publicado por LAP LAMBERT Academic Publishing, 2018
ISBN 10: 6139896835 ISBN 13: 9786139896837
Librería: AHA-BUCH GmbH, Einbeck, Alemania
EUR 72,76
Cantidad disponible: 1 disponibles
Añadir al carritoTaschenbuch. Condición: Neu. nach der Bestellung gedruckt Neuware - Printed after ordering - In the present global manufacturing scenario, the manufacturers are in a need to produce a variety of products in mass with limited resources and constraints. Many tasks like cost reduction, resource utilization, inventory control and human resource management are to be addressed in a typical production environment. Since the manufacturing methods remain fixed well, the production schedule is to be optimized for the effective utilization of machines with proper control. Scheduling and sequencing is the most successful tool to provide optimal solution in any production scenario. There are varieties of shop floor environments with many objectives based on the demand. These objectives are influenced by critical resources/machines in it. Since, the due date based scheduling is the primary objective of any shop floor environment, the influence of critical machine(s) on time is to be studied. Therefore, this research focuses towards the study on impact of critical resources/machines for due date based scheduling. In order to accomplish this, the due date is assumed as lower bound and three corollaries are developed based on the objective of minimizing makespan from/to the lower bound.