Isbn: 9783659853296 - impact of smed on manufacturing unit- a case study: assessment of implementation of smed in manufacturing industry (6 resultados)

ISBN: 
Refinar con la Búsqueda avanzada

Filtrar la búsqueda

  • Libros (6)

  • Nuevo (6)

a

Intervalo de precios personalizado (EUR)

a

  • Idioma: Inglés

    Editorial: LAP LAMBERT Academic Publishing, 2016

    3659853291 / 9783659853296

    • Tapa blanda

    Librería: Revaluation Books, Exeter, Reino UnidoRevaluation Books

    Vendedor de 5 estrellas
    Contactar con el vendedor

    Condición: Nuevo

    EUR 66,33

    Envío por EUR 11,63 
    Se envía de Reino Unido a Estados Unidos de America

    Cantidad disponible: 1 disponibles

    Paperback. Condición: Brand New. 64 pages. 8.66x5.91x0.15 inches. In Stock.

  • Idioma: Inglés

    Editorial: LAP LAMBERT Academic Publishing, 2016

    3659853291 / 9783659853296

    • Tapa blanda

    Librería: preigu, Osnabrück, Alemaniapreigu

    Vendedor de 5 estrellas
    Contactar con el vendedor

    Condición: Nuevo

    EUR 36,35

    Envío por EUR 70,00 
    Se envía de Alemania a Estados Unidos de America

    Cantidad disponible: 5 disponibles

    Taschenbuch. Condición: Neu. Impact of SMED on manufacturing Unit- A case study | Assessment of implementation of SMED in manufacturing Industry | Jagdeep Singh (u. a.) | Taschenbuch | 64 S. | Englisch | 2016 | LAP LAMBERT Academic Publishing | EAN 9783659853296 | Verantwortliche Person für die EU: preigu GmbH & Co. KG, Lengericher Landstr. 19, 49078 Osnabrück, mail[at]preigu[dot]de | Anbieter: preigu. …

  • Idioma: Inglés

    Editorial: LAP LAMBERT Academic Publishing Mrz 2016, 2016

    3659853291 / 9783659853296

    • Tapa blanda
    • Impresión bajo demanda

    Librería: BuchWeltWeit Ludwig Meier e.K., Bergisch Gladbach, AlemaniaBuchWeltWeit Ludwig Meier e.K.

    Vendedor de 5 estrellas
    Contactar con el vendedor

    Condición: Nuevo

    EUR 39,90

    Envío por EUR 23,00 
    Se envía de Alemania a Estados Unidos de America

    Cantidad disponible: 2 disponibles

    Taschenbuch. Condición: Neu. This item is printed on demand - it takes 3-4 days longer - Neuware -This book is an attempt to access the performance of SMED technique in small manufacturing unit of northern India. Manufacturing Industry under study was suffering from high set up time, low production and low overall equipment effectiveness. Various steps in implementing SMED technique has been followed in systematic manner. The important financial benefits have identified. Using SMED techniques, two activities such as heating and measurement of packing shifted from internal to external. Introduce new tools such as hot gauges, sample die used for hot inspection of forged crank and pneumatic spanner used for loosening or tighten the bolts of bottom dies. After using SMED, time associated with setup of dies are 167.09 min/day and saved time up to 42.27 min. Before SMED, activities associated with setup of dies (forging press) took 209.36 min/ day. After study the activities associated with setup of dies (forging press), then it was observed that there were chances to reduce setup time by SMED techniques. 64 pp. Englisch.…

  • Idioma: Inglés

    Editorial: LAP LAMBERT Academic Publishing, 2016

    3659853291 / 9783659853296

    • Tapa blanda
    • Impresión bajo demanda

    Librería: AHA-BUCH GmbH, Einbeck, AlemaniaAHA-BUCH GmbH

    Vendedor de 5 estrellas
    Contactar con el vendedor

    Condición: Nuevo

    EUR 43,00

    Envío por EUR 35,00 
    Se envía de Alemania a Estados Unidos de America

    Cantidad disponible: 1 disponibles

    Taschenbuch. Condición: Neu. nach der Bestellung gedruckt Neuware - Printed after ordering - This book is an attempt to access the performance of SMED technique in small manufacturing unit of northern India. Manufacturing Industry under study was suffering from high set up time, low production and low overall equipment effectiveness. Various steps in implementing SMED technique has been followed in systematic manner. The important financial benefits have identified. Using SMED techniques, two activities such as heating and measurement of packing shifted from internal to external. Introduce new tools such as hot gauges, sample die used for hot inspection of forged crank and pneumatic spanner used for loosening or tighten the bolts of bottom dies. After using SMED, time associated with setup of dies are 167.09 min/day and saved time up to 42.27 min. Before SMED, activities associated with setup of dies (forging press) took 209.36 min/ day. After study the activities associated with setup of dies (forging press), then it was observed that there were chances to reduce setup time by SMED techniques.…

  • Idioma: Inglés

    Editorial: LAP LAMBERT Academic Publishing, 2016

    3659853291 / 9783659853296

    • Tapa blanda
    • Impresión bajo demanda

    Librería: moluna, Greven, Alemaniamoluna

    Vendedor de 5 estrellas
    Contactar con el vendedor

    Condición: Nuevo

    EUR 34,25

    Envío por EUR 48,99 
    Se envía de Alemania a Estados Unidos de America

    Cantidad disponible: Más de 20 disponibles

    Condición: New. Dieser Artikel ist ein Print on Demand Artikel und wird nach Ihrer Bestellung fuer Sie gedruckt. Autor/Autorin: Singh JagdeepJagdeep Singh holds PhD degree in Mechanical Engineering. Inderdeep Singh holds Masters degree in Industrial Engineering and has keen interest in operations management.This book is an attempt to access the performanc.…

  • Idioma: Inglés

    Editorial: LAP LAMBERT Academic Publishing Mär 2016, 2016

    3659853291 / 9783659853296

    • Tapa blanda
    • Impresión bajo demanda

    Librería: buchversandmimpf2000, Emtmannsberg, BAYE, Alemaniabuchversandmimpf2000

    Vendedor de 5 estrellas
    Contactar con el vendedor

    Condición: Nuevo

    EUR 39,90

    Envío por EUR 60,00 
    Se envía de Alemania a Estados Unidos de America

    Cantidad disponible: 1 disponibles

    Taschenbuch. Condición: Neu. This item is printed on demand - Print on Demand Titel. Neuware -This book is an attempt to access the performance of SMED technique in small manufacturing unit of northern India. Manufacturing Industry under study was suffering from high set up time, low production and low overall equipment effectiveness. Various steps in implementing SMED technique has been followed in systematic manner. The important financial benefits have identified. Using SMED techniques, two activities such as heating and measurement of packing shifted from internal to external. Introduce new tools such as hot gauges, sample die used for hot inspection of forged crank and pneumatic spanner used for loosening or tighten the bolts of bottom dies. After using SMED, time associated with setup of dies are 167.09 min/day and saved time up to 42.27 min. Before SMED, activities associated with setup of dies (forging press) took 209.36 min/ day. After study the activities associated with setup of dies (forging press), then it was observed that there were chances to reduce setup time by SMED techniques.VDM Verlag, Dudweiler Landstraße 99, 66123 Saarbrücken 64 pp. Englisch.…