Isbn: 9786206843573 - designing the splitting of a road section (cw46) over 5km (4 resultados)

ISBN
Refinar con la Búsqueda avanzada

Filtrar la búsqueda

  • Libros (4)

  • Nuevo (4)

a

Intervalo de precios personalizado (EUR)

a

  • Idioma: Inglés

    Editorial: LAP LAMBERT Academic Publishing, 2024

    6206843572 / 9786206843573

    • Tapa blanda

    Librería: preigu, Osnabrück, Alemaniapreigu

    Vendedor de 5 estrellas
    Contactar con el vendedor

    Condición: Nuevo

    EUR 71,05

    Envío por EUR 70,00 
    Se envía de Alemania a Estados Unidos de America

    Cantidad disponible: 5 disponibles

    Taschenbuch. Condición: Neu. Designing the splitting of a road section (CW46) over 5km | Haroune Benmalek (u. a.) | Taschenbuch | Englisch | 2024 | LAP LAMBERT Academic Publishing | EAN 9786206843573 | Verantwortliche Person für die EU: preigu GmbH & Co. KG, Lengericher Landstr. 19, 49078 Osnabrück, mail[at]preigu[dot]de | Anbieter: preigu.

  • Idioma: Inglés

    Editorial: LAP LAMBERT Academic Publishing Feb 2024, 2024

    6206843572 / 9786206843573

    • Tapa blanda
    • Impresión bajo demanda

    Librería: BuchWeltWeit Ludwig Meier e.K., Bergisch Gladbach, AlemaniaBuchWeltWeit Ludwig Meier e.K.

    Vendedor de 5 estrellas
    Contactar con el vendedor

    Condición: Nuevo

    EUR 84,90

    Envío por EUR 23,00 
    Se envía de Alemania a Estados Unidos de America

    Cantidad disponible: 2 disponibles

    Taschenbuch. Condición: Neu. This item is printed on demand - it takes 3-4 days longer - Neuware 208 pp. Englisch.

  • Idioma: Inglés

    Editorial: LAP LAMBERT Academic Publishing Feb 2024, 2024

    6206843572 / 9786206843573

    • Tapa blanda
    • Impresión bajo demanda

    Librería: buchversandmimpf2000, Emtmannsberg, BAYE, Alemaniabuchversandmimpf2000

    Vendedor de 5 estrellas
    Contactar con el vendedor

    Condición: Nuevo

    EUR 84,90

    Envío por EUR 60,00 
    Se envía de Alemania a Estados Unidos de America

    Cantidad disponible: 1 disponibles

    Taschenbuch. Condición: Neu. This item is printed on demand - Print on Demand Titel. Neuware -Our project concerns the splitting of the CW46 between Sidi Maarouf and Hassi Bounif in the wilaya of Oran, it begins at pk 00+0000m and ends at pk 05+356 m, this section to be studied extends over a length of 5,356 km and vehicle a significant average daily traffic estimated at around 9000v/d.The route consists of maintaining the existing roadway as much as possible and doubling it:¿ The percentage of heavy goods vehicles is 25%, according to a last count carried out in 2014.¿ The project route is located in a flat terrain, and is characterized by medium windings (E2), and medium gradients. It is classified in category (C2) and the base speed of the project is estimated at 80 km/h.The road runs parallel to the railway, buildings, agricultural land as well as crossing with ring road 2 from PK 4+221.645 m to PK 4+267.207 m. They are considered as constraints which pose a difficulty.It is connected to several towns and villages such as Sidi Chahmi and Sidi Okba Zaouïa Bel Kaidia. also it is used as a link between these towns and villages with the city center of Oran.VDM Verlag, Dudweiler Landstraße 99, 66123 Saarbrücken 208 pp. Englisch.

  • Idioma: Inglés

    Editorial: LAP LAMBERT Academic Publishing, 2024

    6206843572 / 9786206843573

    • Tapa blanda
    • Impresión bajo demanda

    Librería: AHA-BUCH GmbH, Einbeck, AlemaniaAHA-BUCH GmbH

    Vendedor de 5 estrellas
    Contactar con el vendedor

    Condición: Nuevo

    EUR 119,97

    Envío por EUR 30,50 
    Se envía de Alemania a Estados Unidos de America

    Cantidad disponible: 1 disponibles

    Taschenbuch. Condición: Neu. nach der Bestellung gedruckt Neuware - Printed after ordering - Our project concerns the splitting of the CW46 between Sidi Maarouf and Hassi Bounif in the wilaya of Oran, it begins at pk 00+0000m and ends at pk 05+356 m, this section to be studied extends over a length of 5,356 km and vehicle a significant average daily traffic estimated at around 9000v/d.The route consists of maintaining the existing roadway as much as possible and doubling it:- The percentage of heavy goods vehicles is 25%, according to a last count carried out in 2014.- The project route is located in a flat terrain, and is characterized by medium windings (E2), and medium gradients. It is classified in category (C2) and the base speed of the project is estimated at 80 km/h.The road runs parallel to the railway, buildings, agricultural land as well as crossing with ring road 2 from PK 4+221.645 m to PK 4+267.207 m. They are considered as constraints which pose a difficulty.It is connected to several towns and villages such as Sidi Chahmi and Sidi Okba Zaouïa Bel Kaidia. also it is used as a link between these towns and villages with the city center of Oran.