9786203462067 - a hybrid risk management and value management model: a hybrid risk management and value management modelbased on mcdm in contractor selection de aghajanzadeh hooshyar, mehrnaz (5 resultados)
- Más imágenes
- Tapa blanda
Librería: preigu, Osnabrück, Alemaniapreigu
Contactar con el vendedorVendedor de 5 estrellasCondición: Nuevo
EUR 47,90
Envío por EUR 70,00Se envía de Alemania a Estados Unidos de AmericaCantidad disponible: 5 disponibles
Taschenbuch. Condición: Neu. A hybrid risk management and value management model | A hybrid risk management and value management modelbased on MCDM in contractor selection | Mehrnaz Aghajanzadeh Hooshyar | Taschenbuch | Englisch | 2021 | LAP LAMBERT Academic Publishing | EAN 9786203462067 | Verantwortliche Person für die EU: pre…igu GmbH & Co. KG, Lengericher Landstr. 19, 49078 Osnabrück, mail[at]preigu[dot]de | Anbieter: preigu.
- Más imágenes
- Tapa blanda
- Impresión bajo demanda
Librería: BuchWeltWeit Ludwig Meier e.K., Bergisch Gladbach, AlemaniaBuchWeltWeit Ludwig Meier e.K.
Contactar con el vendedorVendedor de 5 estrellasCondición: Nuevo
EUR 54,90
Envío por EUR 23,00Se envía de Alemania a Estados Unidos de AmericaCantidad disponible: 2 disponibles
Taschenbuch. Condición: Neu. This item is printed on demand - it takes 3-4 days longer - Neuware -In this research, an hybrid approach based on risk management and value engineering has been developed to select contractors in construction projects. This model is designed based on some criteria and sub-criteria derived from the l…iterature whose importance is evaluated by the best worst method. The contractors were then prioritized using VIKOR methods and GrayRelationship Analysis. According to the computational results, it can be observed that the local risk strategic (0.348) has the highest score among the criteria and the other risk weighted local scale (0.080) has the lowest score among the criteria. In terms of operational risk, the technical error sub-criterion had the highest local weight (0.477) and the cheaper sub-criterion the lowestlocal weight (0.165). In the strategic risk dimension, the social dissatisfaction sub-criterion reported the highest local weight (0.380) and the environmental dissatisfaction sub-criterion the lowest local weight (0.136). 116 pp. Englisch.
- Más imágenes
- Tapa blanda
- Impresión bajo demanda
Librería: moluna, Greven, Alemaniamoluna
Contactar con el vendedorVendedor de 5 estrellasCondición: Nuevo
EUR 45,45
Envío por EUR 48,99Se envía de Alemania a Estados Unidos de AmericaCantidad disponible: Más de 20 disponibles
Kartoniert / Broschiert. Condición: New. Dieser Artikel ist ein Print on Demand Artikel und wird nach Ihrer Bestellung fuer Sie gedruckt. Autor/Autorin: Aghajanzadeh Hooshyar MehrnazMaster of Civil Engineering in Construction Management and Engineering.In this research, an hybrid approach based on risk management and value engin…eering has been developed to select contractors in c.
- Más imágenes
- Tapa blanda
- Impresión bajo demanda
Librería: buchversandmimpf2000, Emtmannsberg, BAYE, Alemaniabuchversandmimpf2000
Contactar con el vendedorVendedor de 5 estrellasCondición: Nuevo
EUR 54,90
Envío por EUR 60,00Se envía de Alemania a Estados Unidos de AmericaCantidad disponible: 1 disponibles
Taschenbuch. Condición: Neu. This item is printed on demand - Print on Demand Titel. Neuware -In this research, an hybrid approach based on risk management and value engineering has been developed to select contractors in construction projects. This model is designed based on some criteria and sub-criteria derived from the liter…ature whose importance is evaluated by the best worst method. The contractors were then prioritized using VIKOR methods and GrayRelationship Analysis. According to the computational results, it can be observed that the local risk strategic (0.348) has the highest score among the criteria and the other risk weighted local scale (0.080) has the lowest score among the criteria. In terms of operational risk, the technical error sub-criterion had the highest local weight (0.477) and the cheaper sub-criterion the lowestlocal weight (0.165). In the strategic risk dimension, the social dissatisfaction sub-criterion reported the highest local weight (0.380) and the environmental dissatisfaction sub-criterion the lowest local weight (0.136).VDM Verlag, Dudweiler Landstraße 99, 66123 Saarbrücken 116 pp. Englisch.
- Más imágenes
- Tapa blanda
- Impresión bajo demanda
Librería: AHA-BUCH GmbH, Einbeck, AlemaniaAHA-BUCH GmbH
Contactar con el vendedorVendedor de 5 estrellasCondición: Nuevo
EUR 55,56
Envío por EUR 60,96Se envía de Alemania a Estados Unidos de AmericaCantidad disponible: 1 disponibles
Taschenbuch. Condición: Neu. nach der Bestellung gedruckt Neuware - Printed after ordering - In this research, an hybrid approach based on risk management and value engineering has been developed to select contractors in construction projects. This model is designed based on some criteria and sub-criteria derived from the litera…ture whose importance is evaluated by the best worst method. The contractors were then prioritized using VIKOR methods and GrayRelationship Analysis. According to the computational results, it can be observed that the local risk strategic (0.348) has the highest score among the criteria and the other risk weighted local scale (0.080) has the lowest score among the criteria. In terms of operational risk, the technical error sub-criterion had the highest local weight (0.477) and the cheaper sub-criterion the lowestlocal weight (0.165). In the strategic risk dimension, the social dissatisfaction sub-criterion reported the highest local weight (0.380) and the environmental dissatisfaction sub-criterion the lowest local weight (0.136).




