Isbn: 9786202667852 - the best process map for cost estimating: obtaining the optimum value for a future investment (5 resultados)

ISBN: 
Refinar con la Búsqueda avanzada

Filtrar la búsqueda

  • Libros (5)

  • Nuevo (5)

a

Intervalo de precios personalizado (EUR)

a

  • Idioma: Inglés

    Editorial: LAP LAMBERT Academic Publishing, 2020

    6202667850 / 9786202667852

    • Tapa blanda

    Librería: preigu, Osnabrück, Alemaniapreigu

    Vendedor de 5 estrellas
    Contactar con el vendedor

    Condición: Nuevo

    EUR 23,30

    Envío por EUR 70,00 
    Se envía de Alemania a Estados Unidos de America

    Cantidad disponible: 5 disponibles

    Taschenbuch. Condición: Neu. The Best Process Map for Cost Estimating | Obtaining the Optimum Value for a Future Investment | Piero Anticona Tello | Taschenbuch | 68 S. | Englisch | 2020 | LAP LAMBERT Academic Publishing | EAN 9786202667852 | Verantwortliche Person für die EU: preigu GmbH & Co. KG, Lengericher Landstr. 19, 49078 Osnabrück, mail[at]preigu[dot]de | Anbieter: preigu. …

  • Idioma: Inglés

    Editorial: LAP LAMBERT Academic Publishing Jul 2020, 2020

    6202667850 / 9786202667852

    • Tapa blanda
    • Impresión bajo demanda

    Librería: BuchWeltWeit Ludwig Meier e.K., Bergisch Gladbach, AlemaniaBuchWeltWeit Ludwig Meier e.K.

    Vendedor de 5 estrellas
    Contactar con el vendedor

    Condición: Nuevo

    EUR 24,90

    Envío por EUR 23,00 
    Se envía de Alemania a Estados Unidos de America

    Cantidad disponible: 2 disponibles

    Taschenbuch. Condición: Neu. This item is printed on demand - it takes 3-4 days longer - Neuware -Investors always look for the optimum return of the capital invested. They still run feasibility studies to determine which is the best alternative among different projects that offer the best IRR, VPN, ROI, ROCE, or other financial scoring models. Some projects or programs get rejected because of the value of the alternative chosen is high, and sometimes the process for estimating and budgeting does not obtain the optimum result.The following research suggests the best process for estimating and budgeting that could help owners to get the optimum value for acquiring, constructing, updating, expanding upon, maintaining, repairing, and eventually disposing of organizational assets.Besides, Building Information Modeling (BIM) uses on Integrated Project Delivery (IPD) approach, a collaborative and participatory method. Stakeholders participate in the early stages of the project; this should be a significant differentiator comparing with a traditional cost estimating approach. Has BIM a better process to define the scope and produce a better cost estimate than a traditional method for estimating and budgeting 68 pp. Englisch. …

  • Idioma: Inglés

    Editorial: LAP LAMBERT Academic Publishing, 2020

    6202667850 / 9786202667852

    • Tapa blanda
    • Impresión bajo demanda

    Librería: AHA-BUCH GmbH, Einbeck, AlemaniaAHA-BUCH GmbH

    Vendedor de 5 estrellas
    Contactar con el vendedor

    Condición: Nuevo

    EUR 30,77

    Envío por EUR 35,00 
    Se envía de Alemania a Estados Unidos de America

    Cantidad disponible: 1 disponible

    Taschenbuch. Condición: Neu. nach der Bestellung gedruckt Neuware - Printed after ordering - Investors always look for the optimum return of the capital invested. They still run feasibility studies to determine which is the best alternative among different projects that offer the best IRR, VPN, ROI, ROCE, or other financial scoring models. Some projects or programs get rejected because of the value of the alternative chosen is high, and sometimes the process for estimating and budgeting does not obtain the optimum result.The following research suggests the best process for estimating and budgeting that could help owners to get the optimum value for acquiring, constructing, updating, expanding upon, maintaining, repairing, and eventually disposing of organizational assets.Besides, Building Information Modeling (BIM) uses on Integrated Project Delivery (IPD) approach, a collaborative and participatory method. Stakeholders participate in the early stages of the project; this should be a significant differentiator comparing with a traditional cost estimating approach. Has BIM a better process to define the scope and produce a better cost estimate than a traditional method for estimating and budgeting. …

  • Idioma: Inglés

    Editorial: LAP LAMBERT Academic Publishing, 2020

    6202667850 / 9786202667852

    • Tapa blanda
    • Impresión bajo demanda

    Librería: moluna, Greven, Alemaniamoluna

    Vendedor de 5 estrellas
    Contactar con el vendedor

    Condición: Nuevo

    EUR 23,07

    Envío por EUR 48,99 
    Se envía de Alemania a Estados Unidos de America

    Cantidad disponible: Más de 20 disponibles

    Condición: New. Dieser Artikel ist ein Print on Demand Artikel und wird nach Ihrer Bestellung fuer Sie gedruckt. Autor/Autorin: Anticona Tello PieroPiero Anticona is a project controller with 15 years of experience in the sectors of Mining, Energy, and Oil & Gas. He has experience as Owner, Owner Agent, and Contractor. Piero is GPC Fellow from Guild of Projec.…

  • Idioma: Inglés

    Editorial: LAP LAMBERT Academic Publishing Jul 2020, 2020

    6202667850 / 9786202667852

    • Tapa blanda
    • Impresión bajo demanda

    Librería: buchversandmimpf2000, Emtmannsberg, BAYE, Alemaniabuchversandmimpf2000

    Vendedor de 5 estrellas
    Contactar con el vendedor

    Condición: Nuevo

    EUR 24,90

    Envío por EUR 60,00 
    Se envía de Alemania a Estados Unidos de America

    Cantidad disponible: 1 disponible

    Taschenbuch. Condición: Neu. This item is printed on demand - Print on Demand Titel. Neuware -Investors always look for the optimum return of the capital invested. They still run feasibility studies to determine which is the best alternative among different projects that offer the best IRR, VPN, ROI, ROCE, or other financial scoring models. Some projects or programs get rejected because of the value of the alternative chosen is high, and sometimes the process for estimating and budgeting does not obtain the optimum result.The following research suggests the best process for estimating and budgeting that could help owners to get the optimum value for acquiring, constructing, updating, expanding upon, maintaining, repairing, and eventually disposing of organizational assets.Besides, Building Information Modeling (BIM) uses on Integrated Project Delivery (IPD) approach, a collaborative and participatory method. Stakeholders participate in the early stages of the project; this should be a significant differentiator comparing with a traditional cost estimating approach. Has BIM a better process to define the scope and produce a better cost estimate than a traditional method for estimating and budgeting VDM Verlag, Dudweiler Landstraße 99, 66123 Saarbrücken 68 pp. Englisch. …