Isbn: 9783659114366 - productivity improvement measures and performance of smes: role of quality & productivity improvement measures in performance of small and medium enterprises (smes) (6 resultados)

ISBN: 
Refinar con la Búsqueda avanzada

Filtrar la búsqueda

  • Libros (6)

a

Intervalo de precios personalizado (EUR)

a

  • Idioma: Inglés

    Editorial: LAP LAMBERT Academic Publishing, 2012

    3659114367 / 9783659114366

    • Tapa blanda

    Librería: Mispah books, Redhill, SURRE, Reino UnidoMispah books

    Vendedor de 4 estrellas
    Contactar con el vendedor

    Condición: Usado - Como Nuevo

    EUR 122,41

    Envío por EUR 29,42 
    Se envía de Reino Unido a Estados Unidos de America

    Cantidad disponible: 1 disponible

    Paperback. Condición: Like New. LIKE NEW. SHIPS FROM MULTIPLE LOCATIONS. book.

  • Idioma: Inglés

    Editorial: LAP LAMBERT Academic Publishing, 2013

    3659114367 / 9783659114366

    • Tapa blanda

    Librería: preigu, Osnabrück, Alemaniapreigu

    Vendedor de 5 estrellas
    Contactar con el vendedor

    Condición: Nuevo

    EUR 196,00

    Envío por EUR 70,00 
    Se envía de Alemania a Estados Unidos de America

    Cantidad disponible: 5 disponibles

    Taschenbuch. Condición: Neu. Productivity Improvement Measures and Performance of SMEs | Role of Quality & Productivity Improvement Measures in performance of Small and Medium Enterprises (SMEs) | Lakhwinder Pal Singh (u. a.) | Taschenbuch | 100 S. | Englisch | 2013 | LAP LAMBERT Academic Publishing | EAN 9783659114366 | Verantwortliche Person für die EU: preigu GmbH & Co. KG, Lengericher Landstr. 19, 49078 Osnabrück, mail[at]preigu[dot]de | Anbieter: preigu.…

  • Idioma: Inglés

    Editorial: LAP LAMBERT Academic Publishing Mai 2012, 2012

    3659114367 / 9783659114366

    • Tapa blanda
    • Impresión bajo demanda

    Librería: BuchWeltWeit Ludwig Meier e.K., Bergisch Gladbach, AlemaniaBuchWeltWeit Ludwig Meier e.K.

    Vendedor de 5 estrellas
    Contactar con el vendedor

    Condición: Nuevo

    EUR 49,00

    Envío por EUR 23,00 
    Se envía de Alemania a Estados Unidos de America

    Cantidad disponible: 2 disponibles

    Taschenbuch. Condición: Neu. This item is printed on demand - it takes 3-4 days longer - Neuware -ISO was found most significant measure as it had appreciably affected all the parameters except inventory level of finished goods, R&D activity, lead time of R&D, total production cost, cost due to customer complaints and cost due to rework. Quality Circles was found the second most important measure as it had significant impact on inventory levels of raw materials, R&D activity, lead time of R&D, total production cost, cost due to customer complaints, cost due to rework/re-inspection, and performance of the suppliers. 5S, suggestion schemes and workers participation were found least significant measures as these measures had affected only a few parameters. JIT was found the most insignificant measures. This is because of unstable demand, lack of proper training of employees to implement JIT. Moreover the small firms are owner managed and they try to implement the measures within their own constraints and not according to the requirement of the measures The firms, which have implemented multiple productivity improvement measures, had performed better than those having single measure. These firms had better understanding of the importance of management 100 pp. Englisch.…

  • Idioma: Inglés

    Editorial: LAP LAMBERT Academic Publishing, 2012

    3659114367 / 9783659114366

    • Tapa blanda
    • Impresión bajo demanda

    Librería: AHA-BUCH GmbH, Einbeck, AlemaniaAHA-BUCH GmbH

    Vendedor de 5 estrellas
    Contactar con el vendedor

    Condición: Nuevo

    EUR 49,00

    Envío por EUR 35,00 
    Se envía de Alemania a Estados Unidos de America

    Cantidad disponible: 1 disponible

    Taschenbuch. Condición: Neu. nach der Bestellung gedruckt Neuware - Printed after ordering - ISO was found most significant measure as it had appreciably affected all the parameters except inventory level of finished goods, R&D activity, lead time of R&D, total production cost, cost due to customer complaints and cost due to rework. Quality Circles was found the second most important measure as it had significant impact on inventory levels of raw materials, R&D activity, lead time of R&D, total production cost, cost due to customer complaints, cost due to rework/re-inspection, and performance of the suppliers. 5S, suggestion schemes and workers participation were found least significant measures as these measures had affected only a few parameters. JIT was found the most insignificant measures. This is because of unstable demand, lack of proper training of employees to implement JIT. Moreover the small firms are owner managed and they try to implement the measures within their own constraints and not according to the requirement of the measures The firms, which have implemented multiple productivity improvement measures, had performed better than those having single measure. These firms had better understanding of the importance of management.…

  • Idioma: Inglés

    Editorial: LAP LAMBERT Academic Publishing, 2012

    3659114367 / 9783659114366

    • Tapa blanda
    • Impresión bajo demanda

    Librería: moluna, Greven, Alemaniamoluna

    Vendedor de 5 estrellas
    Contactar con el vendedor

    Condición: Nuevo

    EUR 41,67

    Envío por EUR 48,99 
    Se envía de Alemania a Estados Unidos de America

    Cantidad disponible: Más de 20 disponibles

    Condición: New. Dieser Artikel ist ein Print on Demand Artikel und wird nach Ihrer Bestellung fuer Sie gedruckt. Autor/Autorin: Singh Lakhwinder PalDr Lakhwinder Pal Singh is a faculty in Department of Industrial and Production Engineering, Dr B R Ambedkar National Institute of Technology Jalandhar-144011(Punjab). His area of research is occupational Health &.…

  • Idioma: Inglés

    Editorial: LAP LAMBERT Academic Publishing Mai 2012, 2012

    3659114367 / 9783659114366

    • Tapa blanda
    • Impresión bajo demanda

    Librería: buchversandmimpf2000, Emtmannsberg, BAYE, Alemaniabuchversandmimpf2000

    Vendedor de 5 estrellas
    Contactar con el vendedor

    Condición: Nuevo

    EUR 196,00

    Envío por EUR 60,00 
    Se envía de Alemania a Estados Unidos de America

    Cantidad disponible: 1 disponible

    Taschenbuch. Condición: Neu. This item is printed on demand - Print on Demand Titel. Neuware -ISO was found most significant measure as it had appreciably affected all the parameters except inventory level of finished goods, R&D activity, lead time of R&D, total production cost, cost due to customer complaints and cost due to rework. Quality Circles was found the second most important measure as it had significant impact on inventory levels of raw materials, R&D activity, lead time of R&D, total production cost, cost due to customer complaints, cost due to rework/re-inspection, and performance of the suppliers. 5S, suggestion schemes and workers participation were found least significant measures as these measures had affected only a few parameters. JIT was found the most insignificant measures. This is because of unstable demand, lack of proper training of employees to implement JIT. Moreover the small firms are owner managed and they try to implement the measures within their own constraints and not according to the requirement of the measures The firms, which have implemented multiple productivity improvement measures, had performed better than those having single measure. These firms had better understanding of the importance of managementOmniScriptum SRL, Str. Armeneasca 28/1, office 1, 2012 Chisinau 100 pp. Englisch.…