ISBN: 9783639766905 - building information modeling application in design_bid_build projects: a case study (5 resultados)

ISBN: 
Refinar con la Búsqueda avanzada

Filtrar la búsqueda

  • Libros (5)

  • Nuevo (5)

a

Intervalo de precios personalizado (EUR)

a

  • Idioma: Inglés

    Editorial: Scholars' Press, 2015

    3639766903 / 9783639766905

    • Tapa blanda

    Librería: preigu, Osnabrück, Alemaniapreigu

    Vendedor de 5 estrellas
    Contactar con el vendedor

    Condición: Nuevo

    EUR 155,60

    Envío por EUR 70,00 
    Se envía de Alemania a Estados Unidos de America

    Cantidad disponible: 5 disponibles

    Taschenbuch. Condición: Neu. Building Information Modeling Application in Design_Bid_Build Projects | A Case Study | Navid Sanei Sistani | Taschenbuch | 104 S. | Englisch | 2015 | Scholars' Press | EAN 9783639766905 | Verantwortliche Person für die EU: preigu GmbH & Co. KG, Lengericher Landstr. 19, 49078 Osnabrück, mail[at]preigu[dot]de | Anbieter: preigu. …

  • Idioma: Inglés

    Editorial: SPS Jul 2015, 2015

    3639766903 / 9783639766905

    • Tapa blanda
    • Impresión bajo demanda

    Librería: BuchWeltWeit Ludwig Meier e.K., Bergisch Gladbach, AlemaniaBuchWeltWeit Ludwig Meier e.K.

    Vendedor de 5 estrellas
    Contactar con el vendedor

    Condición: Nuevo

    EUR 38,90

    Envío por EUR 23,00 
    Se envía de Alemania a Estados Unidos de America

    Cantidad disponible: 2 disponibles

    Taschenbuch. Condición: Neu. This item is printed on demand - it takes 3-4 days longer - Neuware -Since, Design-Bid-Build (DBB) was the most popular project delivery method at the beginning of previous decade regardless of all its shortcomings, applying new advanced tools can compensate disadvantages of this method. Recently, advanced technology in construction management called Building Information Modeling (BIM) became popular among construction industry. Although, effects of BIM on different aspects of alternative project delivery methods were considered in literature, but adequate efforts on evaluating BIM application in DBB projects have not performed yet. This research aims to investigate effects of using BIM in DBB projects. For this reason, a questionnaire survey was conducted among construction industry practitioners in Iran to evaluate their opinions about using BIM in DBB projects. To assess reliability of questionnaire survey results, a single case was studied to compare cost and time of DBB projects in case of using BIM with real project which was executed without using BIM. 104 pp. Englisch.…

  • Idioma: Inglés

    Editorial: Scholars' Press, 2015

    3639766903 / 9783639766905

    • Tapa blanda
    • Impresión bajo demanda

    Librería: AHA-BUCH GmbH, Einbeck, AlemaniaAHA-BUCH GmbH

    Vendedor de 5 estrellas
    Contactar con el vendedor

    Condición: Nuevo

    EUR 38,90

    Envío por EUR 35,00 
    Se envía de Alemania a Estados Unidos de America

    Cantidad disponible: 1 disponible

    Taschenbuch. Condición: Neu. nach der Bestellung gedruckt Neuware - Printed after ordering - Since, Design-Bid-Build (DBB) was the most popular project delivery method at the beginning of previous decade regardless of all its shortcomings, applying new advanced tools can compensate disadvantages of this method. Recently, advanced technology in construction management called Building Information Modeling (BIM) became popular among construction industry. Although, effects of BIM on different aspects of alternative project delivery methods were considered in literature, but adequate efforts on evaluating BIM application in DBB projects have not performed yet. This research aims to investigate effects of using BIM in DBB projects. For this reason, a questionnaire survey was conducted among construction industry practitioners in Iran to evaluate their opinions about using BIM in DBB projects. To assess reliability of questionnaire survey results, a single case was studied to compare cost and time of DBB projects in case of using BIM with real project which was executed without using BIM.…

  • Idioma: Inglés

    Editorial: Scholars\' Press, 2015

    3639766903 / 9783639766905

    • Tapa blanda
    • Impresión bajo demanda

    Librería: moluna, Greven, Alemaniamoluna

    Vendedor de 5 estrellas
    Contactar con el vendedor

    Condición: Nuevo

    EUR 34,01

    Envío por EUR 48,99 
    Se envía de Alemania a Estados Unidos de America

    Cantidad disponible: Más de 20 disponibles

    Condición: New. Dieser Artikel ist ein Print on Demand Artikel und wird nach Ihrer Bestellung fuer Sie gedruckt. Autor/Autorin: Sanei Sistani NavidNavid Sanei Sistani graduated in Civil Engineering in 2009. During 2008 to 2011 he had experienced working in construction industry in different positions. By starting Master Degree in Construction Management in 20.…

  • Idioma: Inglés

    Editorial: Scholars' Press Jul 2015, 2015

    3639766903 / 9783639766905

    • Tapa blanda
    • Impresión bajo demanda

    Librería: buchversandmimpf2000, Emtmannsberg, BAYE, Alemaniabuchversandmimpf2000

    Vendedor de 5 estrellas
    Contactar con el vendedor

    Condición: Nuevo

    EUR 155,60

    Envío por EUR 60,00 
    Se envía de Alemania a Estados Unidos de America

    Cantidad disponible: 1 disponible

    Taschenbuch. Condición: Neu. This item is printed on demand - Print on Demand Titel. Neuware -Since, Design-Bid-Build (DBB) was the most popular project delivery method at the beginning of previous decade regardless of all its shortcomings, applying new advanced tools can compensate disadvantages of this method. Recently, advanced technology in construction management called Building Information Modeling (BIM) became popular among construction industry. Although, effects of BIM on different aspects of alternative project delivery methods were considered in literature, but adequate efforts on evaluating BIM application in DBB projects have not performed yet. This research aims to investigate effects of using BIM in DBB projects. For this reason, a questionnaire survey was conducted among construction industry practitioners in Iran to evaluate their opinions about using BIM in DBB projects. To assess reliability of questionnaire survey results, a single case was studied to compare cost and time of DBB projects in case of using BIM with real project which was executed without using BIM.OmniScriptum SRL, Str. Armeneasca 28/1, office 1, 2012 Chisinau 104 pp. Englisch.…