Towards the end of the fifties methods for planning, scheduling,and control of proj ects were developed on the basis that the evolution of a project can be associated with a special weighted directed graph, called activity network. In this association, the individual activities of the project correspond to the arcs, the so-called proj ect events (beginning or termination of activities) correspond to the nodes, and the durations of the activities correspond to the weights of the respective arcs of the directed graph. 1) Contiguous arcs are assigned to activities which succeed one another immediately. The event corresponding to a node occurs exactly at the time at which all activities which are associated with the arcs leading into the node are terminated. After the occurrence of an event all those activities are be gun which correspond to the arcs emanating from the respective node. This implies especially that the evolution of the project has to be uniquely determined before hand, that every activity and every event are realized exactly once during the exe cution of the project, and that "feedback" (corresponding to cycles in the asso ciated network) is not permitted. Many projects, for example most R&D projects and projects in the area of production p 1 anni ng, do not sa ti sfy the foregoi ng res tri cti ons.
"Sinopsis" puede pertenecer a otra edición de este libro.
Towards the end of the fifties methods for planning, scheduling,and control of proj ects were developed on the basis that the evolution of a project can be associated with a special weighted directed graph, called activity network. In this association, the individual activities of the project correspond to the arcs, the so-called proj ect events (beginning or termination of activities) correspond to the nodes, and the durations of the activities correspond to the weights of the respective arcs of the directed graph. 1) Contiguous arcs are assigned to activities which succeed one another immediately. The event corresponding to a node occurs exactly at the time at which all activities which are associated with the arcs leading into the node are terminated. After the occurrence of an event all those activities are be gun which correspond to the arcs emanating from the respective node. This implies especially that the evolution of the project has to be uniquely determined before hand, that every activity and every event are realized exactly once during the exe cution of the project, and that "feedback" (corresponding to cycles in the asso ciated network) is not permitted. Many projects, for example most R&D projects and projects in the area of production p 1 anni ng, do not sa ti sfy the foregoi ng res tri cti ons.
"Sobre este título" puede pertenecer a otra edición de este libro.
EUR 7,00 gastos de envío desde Alemania a España
Destinos, gastos y plazos de envíoEUR 11,99 gastos de envío desde Alemania a España
Destinos, gastos y plazos de envíoLibrería: Antiquariat Bookfarm, Löbnitz, Alemania
Ehem. Bibliotheksexemplar mit Signatur und Stempel. GUTER Zustand, ein paar Gebrauchsspuren. Ex-library with stamp and library-signature. GOOD condition, some traces of use. Sq 709 3540097058 Sprache: Englisch Gewicht in Gramm: 550. Nº de ref. del artículo: 2096387
Cantidad disponible: 1 disponibles
Librería: Kloof Booksellers & Scientia Verlag, Amsterdam, Holanda
Condición: good. Berlin : Springer, 1979. Paperback. 268 pp. (Lecture notes in economics and mathematical systems, 172). Ticket on cover. Library stamps. Condition : good copy. ISBN 9783540097051. Keywords : , Nº de ref. del artículo: 255514
Cantidad disponible: 1 disponibles
Librería: NEPO UG, Rüsselsheim am Main, Alemania
kart. Condición: Sehr gut. 268 S. : graph. Darst. , 25 cm Sofort verfügbar / Versand am folgenden Arbeitstag / mit Rechnung / daily shipping wordwide with invoice / ex library / Sprache: Deutsch Gewicht in Gramm: 550. Nº de ref. del artículo: 99773
Cantidad disponible: 1 disponibles
Librería: AHA-BUCH GmbH, Einbeck, Alemania
Taschenbuch. Condición: Neu. Druck auf Anfrage Neuware - Printed after ordering - Towards the end of the fifties methods for planning, scheduling,and control of proj ects were developed on the basis that the evolution of a project can be associated with a special weighted directed graph, called activity network. In this association, the individual activities of the project correspond to the arcs, the so-called proj ect events (beginning or termination of activities) correspond to the nodes, and the durations of the activities correspond to the weights of the respective arcs of the directed graph. 1) Contiguous arcs are assigned to activities which succeed one another immediately. The event corresponding to a node occurs exactly at the time at which all activities which are associated with the arcs leading into the node are terminated. After the occurrence of an event all those activities are be gun which correspond to the arcs emanating from the respective node. This implies especially that the evolution of the project has to be uniquely determined before hand, that every activity and every event are realized exactly once during the exe cution of the project, and that 'feedback' (corresponding to cycles in the asso ciated network) is not permitted. Many projects, for example most R&D projects and projects in the area of production p 1 anni ng, do not sa ti sfy the foregoi ng res tri cti ons. Nº de ref. del artículo: 9783540097051
Cantidad disponible: 1 disponibles
Librería: Ria Christie Collections, Uxbridge, Reino Unido
Condición: New. In. Nº de ref. del artículo: ria9783540097051_new
Cantidad disponible: Más de 20 disponibles
Librería: moluna, Greven, Alemania
Condición: New. Nº de ref. del artículo: 4880580
Cantidad disponible: Más de 20 disponibles
Librería: Books Puddle, New York, NY, Estados Unidos de America
Condición: New. pp. 276. Nº de ref. del artículo: 2658571008
Cantidad disponible: 4 disponibles
Librería: Majestic Books, Hounslow, Reino Unido
Condición: New. Print on Demand pp. 276 135 Figures, 67:B&W 6.69 x 9.61 in or 244 x 170 mm (Pinched Crown) Perfect Bound on White w/Gloss Lam. Nº de ref. del artículo: 50988767
Cantidad disponible: 4 disponibles
Librería: buchversandmimpf2000, Emtmannsberg, BAYE, Alemania
Taschenbuch. Condición: Neu. This item is printed on demand - Print on Demand Titel. Neuware -Towards the end of the fifties methods for planning, scheduling,and control of proj ects were developed on the basis that the evolution of a project can be associated with a special weighted directed graph, called activity network. In this association, the individual activities of the project correspond to the arcs, the so-called proj ect events (beginning or termination of activities) correspond to the nodes, and the durations of the activities correspond to the weights of the respective arcs of the directed graph. 1) Contiguous arcs are assigned to activities which succeed one another immediately. The event corresponding to a node occurs exactly at the time at which all activities which are associated with the arcs leading into the node are terminated. After the occurrence of an event all those activities are be gun which correspond to the arcs emanating from the respective node. This implies especially that the evolution of the project has to be uniquely determined before hand, that every activity and every event are realized exactly once during the exe cution of the project, and that 'feedback' (corresponding to cycles in the asso ciated network) is not permitted. Many projects, for example most R&D projects and projects in the area of production p 1 anni ng, do not sa ti sfy the foregoi ng res tri cti ons.Springer Verlag GmbH, Tiergartenstr. 17, 69121 Heidelberg 276 pp. Englisch. Nº de ref. del artículo: 9783540097051
Cantidad disponible: 1 disponibles
Librería: Revaluation Books, Exeter, Reino Unido
Paperback. Condición: Brand New. 1st edition. 276 pages. 9.61x6.69x0.63 inches. In Stock. Nº de ref. del artículo: x-3540097058
Cantidad disponible: 2 disponibles