The Problem of Induced "Block Motion" Related to Deep Underground Strategic Facilities--A Summary; DNA 4078T Topical Report for Period June 1975--October 1976
Editorial: R & D Associates, Marina del Rey, CA, 1977
- Primera edición
- Tapa blanda
- Usado
Librería: Ground Zero Books, Ltd., Silver Spring, MD, Estados Unidos de AmericaGround Zero Books, Ltd.
Vendedor de IberLibro desde 14 de agosto de 1998
Condición: Usado - Aceptable
EUR 229,57
Cantidad disponible: 1 disponible
Añadir al carritoDescripción del artículo del vendedor
The format is approximately 8 inches by 10.5 inches. 60 pages (per DD Form 1473). Figures/Maps. Footnotes. Tables. References. Bibliography. Ex-library with usual library markings. This report was prepared for the Director, Defense Nuclear Agency. Abstract: The block motion problem of explosion-induced differential displacement along geologic discontinuities must be better understood to adequately design and site underground strategic facilities that would survive wartime threats. The purpose of this investigation is to review pertinent literature, develop concepts addressing current understanding of explosion-induced block motions, and identify research that could quantify risks for particular sites. The block motion problem is concerned both with those motions driven or dominated by the explosion-induced stress transients and with those motions triggered by the explosions but dominated by the partial relief of pre-stress conditions. Emphasis is given to the problem of triggered motions because this is the aspect of greatest uncertainty and because the limited evidence is suggestive that differential slip can be triggered at considerable distance from the explosion, depending greatly upon in-situ stress conditions. Methods for avoiding, relieving, absorbing, and resisting explosion-induced block motions are addressed and it is concluded that quantifying the block motion problem appears difficult but not hopeless. The threat of block motion , defined to encompass all explosion induced differential displacement along geologic discontinuities , is an important consideration in siting and designing underground strategic facilities for maximum system survival. A Predictive capability does not presently exist that can satisfactorily assure avoidance of the block motion problem by site selection , relief from the problem by insitu stress alteration , or assure that the design of an underground facility can absorb a block motion of uncertain magnitude. The principal reason for this situation is that there is insufficient knowledge of insitu stress field conditions and failure criteria associated with faults and other possible weakness discontinuities that are the likely locations of block motion responses to explosively induced stress transients. It is clear that the focus of developing a predictive capability should be to set lower and upper bounds on the credible block motion displacements . The motions of concern are those directly induced by explosions interacting with 'imbalanced or excessive prestress conditions within the earth. The block motion problem also includes differential displacements induced by explosions in the rupture and spall regions of surface and near-surface bursts where induced stresses overwhelm either balanced or irnbalanced prestress conditions. Emphasis in this review has been directed at identifying the risk of explosions triggering block motions in prestressed media and examining ways of minimizing the problem. The triggering problem is of special interest because there is greater uncertainty of the risk and more distant displacements are credible for a given explosion threat than would be the case for conditions where stored tectonic stress is small. The major deficiency in assessing the risk of explosion triggered block motion is that the threats are surface or near-surface bursts , and all known triggered block motions are associated with contained explosions.…
N° de ref. del artículo 87712
Detalles bibliográficos
- Título
- The Problem of Induced "Block Motion" Related to Deep Underground Strategic Facilities--A Summary; DNA 4078T Topical Report for Period June 1975--October 1976
- Autor
- Rawson, D. E.
- Editorial
- R & D Associates, Marina del Rey, CA
- Año de publicación
- 1977
- Estado
- Good
- Encuadernación
- Wraps
- Edición
- Presumed First Edition, First printing.
- Catálogos de vendedores
- Nuclear Weapons
Ground Zero Books, Ltd.
Silver Spring, MD, Estados Unidos de America
Vendedor de IberLibro desde 14 de agosto de 1998
Tarifas de envío en Estados Unidos de America
| Artículo | De 5 a 20 días hábiles | De 3 a 6 días hábiles |
|---|---|---|
| Primer artículo | EUR 4,46 | EUR 6,69 |
Métodos de pago
- Cheque
- Factura
- Giro postal
- PayPal
Descripción de la tienda
Founded and operated by trained historians, Ground Zero Books, Ltd., serves the book collector, the scholar, and institutions. We focus on the individual, and pride ourselves on our personal service. Please contact us with your wants, as we have many books not yet listed in our database.
Especialidad
Military History, Nuclear, American Revolution, Military Medicine, Vietnam, World War II, British Empire, World War I, Unit Histories, Civil WarInformación empresarial del vendedor
Ground Zero Books, Ltd.
9033 Georgia Avenue
Silver Spring, MD Estados Unidos de America 20910-2254
Condiciones de venta
Books are subject to prior sale. Please ask us to hold a book for you before you
mail your check. Books are returnable within 7 days, if not satisfactory. MD
residents add 6% state sales tax.
The mailing address for Ground Zero Books, Ltd. (a subchapter-S corporation) is
P.O. Box 8369, Silver Spring, MD 20907-8369. You can reach us by phone at 301-
585-1471, by fax at 301-920-0253, or by e-mail at gzbooksltd@aol.com. Ground Zero
Books, Ltd., is owned & operated by R. Alan Lewis & Lynne Haims.
Derecho al desistimiento
Si es un consumidor, puede rescindir el contrato de acuerdo con lo siguiente. Por consumidor se entiende cualquier persona física que actúe con fines ajenos a su actividad comercial, empresarial, oficio o profesión.
Información sobre el derecho de desistimiento
Derecho legal de desistimiento
Tiene derecho a rescindir este contrato en un plazo de 14 días sin dar ningún motivo.
El periodo de desistimiento vencerá a los 14 días desde que usted, o un tercero que no sea el transportista e indicado por usted, adquiera la posesión física del último bien o del último lote o pieza.
Para ejercer el derecho de desistimiento, complete de forma electrónica y envíe una declaración clara en nuestro sitio web, desde "Mis compras" en "Mi cuenta". Le enviaremos sin demora un acuse de recibo de dicho desistimiento a través de un soporte duradero (por ejemplo, por correo electrónico).
Para cumplir con el plazo de desistimiento, basta con que envíe su comunicación relativa al ejercicio del derecho de desistimiento antes de que venza el periodo de desistimiento.
Efectos del desistimiento
Si rescinde este contrato, le reembolsaremos todos los pagos que hayamos recibido de usted, incluidos los gastos de envío (excepto los gastos adicionales que surjan si elige un tipo de envío que no sea el tipo de envío estándar más económico que ofrecemos).
Podemos hacer una deducción del reembolso por la pérdida de valor de cualquier bien suministrado, si la pérdida es el resultado de una manipulación innecesaria por su parte.
Efectuaremos el reembolso sin demoras indebidas y, a más tardar, 14 días después de que se nos informe de su decisión de rescindir este contrato.
Efectuaremos el reembolso utilizando el mismo medio de pago que utilizó para la transacción inicial, a menos que haya acordado expresamente lo contrario; en cualquier caso, no incurrirá en ningún cargo como resultado de dicho reembolso.
Podremos retener el reembolso hasta que hayamos recibido los bienes o hasta que nos haya presentado una prueba de que los ha devuelto, lo que ocurra primero.
Deberá devolver los bienes o entregarlos a Ground Zero Books, Ltd., Silver Spring, Maryland, U.S.A., +1 240-316-0119, sin demoras indebidas y, en cualquier caso, en un plazo máximo de 14 días a partir del día en que nos comunique su desistimiento del presente contrato. El plazo se cumple si devuelve la mercancía antes de que venza el periodo de 14 días. Tendrá que asumir los gastos directos de devolución de los bienes. Usted solo es responsable de la disminución del valor de los bienes como resultado de una manipulación distinta a la necesaria para establecer la naturaleza, las características y el funcionamiento de los bienes.
Excepciones al derecho de desistimiento
El derecho de desistimiento no se aplica a lo siguiente:
- La entrega de periódicos, diarios o revistas, con la excepción de los contratos de suscripción; y
- El suministro de contenido digital que no se proporcione en un soporte tangible (por ejemplo, en un CD o DVD) si, al hacer el pedido, aceptó que podíamos empezar a entregarlo y que no podría desistir una vez iniciada la entrega.
Condiciones de envío
Orders usually ship within 2 business days. Shipping costs are based on books
weighing 2.2 LB, or 1 KG. If your book order is heavy or oversized, we may contact
you to let you know extra shipping is required.