Isbn: 9781528019668 - report of the board of experts to the terminal committee of the board of trustees as to enlargement of traffic facilities of the brooklyn bridge: with ... plan submitted to the board of experts (3 resultados)

ISBN: 
Refinar con la Búsqueda avanzada

Filtrar la búsqueda

  • Libros (3)

  • Nuevo (3)

a

Intervalo de precios personalizado (EUR)

a

  • Idioma: Inglés

    Editorial: Forgotten Books, 2018

    1528019660 / 9781528019668

    • Tapa blanda

    Librería: PBShop.store US, Wood Dale, IL, Estados Unidos de AmericaPBShop.store US

    Vendedor de 5 estrellas
    Contactar con el vendedor

    Condición: Nuevo

    EUR 25,80

     Gastos de envío gratis 
    Se envía dentro de Estados Unidos de America

    Cantidad disponible: 15 disponibles

    PAP. Condición: New. New Book. Shipped from UK. Established seller since 2000.

  • Idioma: Inglés

    Editorial: Forgotten Books, 2018

    1528019660 / 9781528019668

    • Tapa blanda

    Librería: PBShop.store UK, Fairford, GLOS, Reino UnidoPBShop.store UK

    Vendedor de 5 estrellas
    Contactar con el vendedor

    Condición: Nuevo

    EUR 25,19

    Envío por EUR 3,89 
    Se envía de Reino Unido a Estados Unidos de America

    Cantidad disponible: 15 disponibles

    PAP. Condición: New. New Book. Shipped from UK. Established seller since 2000.

  • Idioma: Inglés

    Editorial: Forgotten Books, 2018

    1528019660 / 9781528019668

    • Tapa blanda
    • Impresión bajo demanda

    Librería: Forgotten Books, London, Reino UnidoForgotten Books

    Vendedor de 5 estrellas
    Contactar con el vendedor

    Condición: Nuevo

    EUR 16,44

     Gastos de envío gratis 
    Se envía de Reino Unido a Estados Unidos de America

    Cantidad disponible: Más de 20 disponibles

    Paperback. Condición: New. Print on Demand. This book is a late-19th century report on suggested improvements to the Brooklyn Bridge in New York City. The author, an engineer, lays out the results of a study commissioned by the bridge's trustees. The author argues that the existing cable railway system is inadequate for the bridge's needs and proposes a new circulating system of trains that can be operated more safely and efficiently. He envisions trains with increased seating capacity, and improved station layouts to facilitate passenger flow and reduce congestion. The report also includes an analysis of bridge traffic patterns to support the proposed changes. The author's insights on safety, capacity, and efficiency remain relevant to infrastructure projects today, making this a valuable historical document for engineers and urban planners. This book is a reproduction of an important historical work, digitally reconstructed using state-of-the-art technology to preserve the original format. In rare cases, an imperfection in the original, such as a blemish or missing page, may be replicated in the book. print-on-demand item.…