Idioma: Alemán
Publicado por Steinbach Sprechende Bücher (Edel Musica Austria)
ISBN 10: 3836805251 ISBN 13: 9783836805254
Librería: medimops, Berlin, Alemania
EUR 11,69
Cantidad disponible: 2 disponibles
Añadir al carritoCondición: very good. Gut/Very good: Buch bzw. Schutzumschlag mit wenigen Gebrauchsspuren an Einband, Schutzumschlag oder Seiten. / Describes a book or dust jacket that does show some signs of wear on either the binding, dust jacket or pages.
Idioma: Alemán
Publicado por Steinbach Sprechende Bücher (Edel Musica Austria)
ISBN 10: 3836805251 ISBN 13: 9783836805254
Librería: medimops, Berlin, Alemania
EUR 11,69
Cantidad disponible: 1 disponibles
Añadir al carritoCondición: good. Befriedigend/Good: Durchschnittlich erhaltenes Buch bzw. Schutzumschlag mit Gebrauchsspuren, aber vollständigen Seiten. / Describes the average WORN book or dust jacket that has all the pages present.
Librería: NEPO UG, Rüsselsheim am Main, Alemania
EUR 44,34
Cantidad disponible: 1 disponibles
Añadir al carritoTaschenbuch. Condición: Gut. 154 Seiten ex Library Book aus einer wissenschafltichen Bibliothek Altersfreigabe FSK ab 0 Jahre Sprache: Englisch Gewicht in Gramm: 227.
Librería: Ria Christie Collections, Uxbridge, Reino Unido
EUR 106,08
Cantidad disponible: Más de 20 disponibles
Añadir al carritoCondición: New. In.
Librería: ralfs-buecherkiste, Herzfelde, MOL, Alemania
EUR 13,00
Cantidad disponible: 1 disponibles
Añadir al carritoPaperback/ broschiert. Condición: Wie neu. 142 S. Mathematics Mathematik Wirtschaftsmathematik Economy Guter Zustand/ Good Ex-Library, vereinzelt Bleistiftanstreichungen ha1081829 Sprache: Englisch Gewicht in Gramm: 250.
Librería: Chiron Media, Wallingford, Reino Unido
EUR 106,08
Cantidad disponible: 10 disponibles
Añadir al carritoPF. Condición: New.
Librería: California Books, Miami, FL, Estados Unidos de America
EUR 128,29
Cantidad disponible: Más de 20 disponibles
Añadir al carritoCondición: New.
Idioma: Inglés
Publicado por Springer Berlin Heidelberg, 1994
ISBN 10: 354057834X ISBN 13: 9783540578345
Librería: moluna, Greven, Alemania
EUR 92,27
Cantidad disponible: Más de 20 disponibles
Añadir al carritoCondición: New.
Idioma: Alemán
Publicado por Christoph Merian Verlag, 2015
ISBN 10: 3856167080 ISBN 13: 9783856167080
Librería: Antiquariat UEBUE, Zürich, Suiza
Original o primera edición
EUR 28,27
Cantidad disponible: 1 disponibles
Añadir al carritoHörbuch (CD). Condición: Sehr gut. 1. Auflage. Z : HörbuchAudio CD (CD/SACD) 55 Min. Deutsch - Sprache, Stimmung und mysteriöse Figuren: Die Geschichten von Arno Camenisch sind nahe am Leben, denn, so sagt der Autor, er fände sie auf der Strasse. Dabei sind die Figuren immer in Bewegung wie er selbst, sie spazieren in und aus seinen Geschichten. In nimmt uns Camenisch mit auf seine vielen Lesetouren. Dabei begegnen wir unter anderem schönen Polizistinnen, einem dicken Zöllner, einem fussballbegeisterten Taxifahrer, Kellnern wie Kühlschränke und gefährlichen Frauen. Camenisch führt uns in seinen Geschichten, die als Kolumnen in der und als Buch im Engeler Verlag erschienen sind, nach Bogotá, Lemberg, Lissabon, Hongkong, zurück nach Tavanasa in die Bündner Berge und in seine Lieblingsstadt Paris. Ob die Geschichten wahr sind oder nicht - wer will das schon so genau wissen! Arno Camenisch liest voller Hingabe, mit Rhythmik und Melodie, dabei wird er von Julian Sartorius' imposanter Trommelmusik begleitet.
Librería: Revaluation Books, Exeter, Reino Unido
EUR 151,36
Cantidad disponible: 2 disponibles
Añadir al carritoPaperback. Condición: Brand New. reprint edition. 154 pages. 9.20x6.10x0.37 inches. In Stock.
Idioma: Inglés
Publicado por Springer, Springer Vieweg, 1994
ISBN 10: 354057834X ISBN 13: 9783540578345
Librería: AHA-BUCH GmbH, Einbeck, Alemania
EUR 106,99
Cantidad disponible: 1 disponibles
Añadir al carritoTaschenbuch. Condición: Neu. Druck auf Anfrage Neuware - Printed after ordering - Within a project human and non-human resources are pulled together in a tempo raray organization in order to achieve a predefined goal (d. [20], p. 187). That is, in contrast to manufacturing management, project management is directed to an end. One major function of project management is the scheduling of the project. Project scheduling is the time-based arrangement of the activities comprising the project subject to precedence-, time-and resource-constraints (d. [4], p. 170). In the 1950's the standard methods MPM (Metra Potential Method) and CPM (Cri tical Path Method) were developed. Given deterministic durations and precedence constraints the minimum project length, time windows for the start times and critical paths can be calculated. At the same time another group of researchers developed the Program Evaluation and Review Technique (PERT) (d. [19], [73] and [90]). In contrast to MPM and CPM, random variables describe the activity durations. Based on the optimistic, most likely and pessimistic estimations of the activity durations an assumed Beta distribution is derived in order to calculate the distribution of the project duration, the critical events, the distribution of earliest and latest occurence of an event, the distribution of the slack of the events and the probability of exceeding a date. By the time the estimates of the distributions have been improved (d. e.g. [52] and [56]). Nevertheless, there are some points of critique concerning the estimation of the resulting distributions and probabilities (d. e.g. [48], [49] and [50]).
Librería: preigu, Osnabrück, Alemania
EUR 95,70
Cantidad disponible: 5 disponibles
Añadir al carritoTaschenbuch. Condición: Neu. Resource-Constrained Project Scheduling | Exact Methods for the Multi-Mode Case | Arno Sprecher | Taschenbuch | xii | Englisch | 1994 | Springer | EAN 9783540578345 | Verantwortliche Person für die EU: Springer Verlag GmbH, Tiergartenstr. 17, 69121 Heidelberg, juergen[dot]hartmann[at]springer[dot]com | Anbieter: preigu.
Librería: Buchpark, Trebbin, Alemania
EUR 75,10
Cantidad disponible: 4 disponibles
Añadir al carritoCondición: Gut. Zustand: Gut | Sprache: Englisch | Produktart: Bücher | Within a project human and non-human resources are pulled together in a tempo raray organization in order to achieve a predefined goal (d. [20], p. 187). That is, in contrast to manufacturing management, project management is directed to an end. One major function of project management is the scheduling of the project. Project scheduling is the time-based arrangement of the activities comprising the project subject to precedence-, time-and resource-constraints (d. [4], p. 170). In the 1950's the standard methods MPM (Metra Potential Method) and CPM (Cri tical Path Method) were developed. Given deterministic durations and precedence constraints the minimum project length, time windows for the start times and critical paths can be calculated. At the same time another group of researchers developed the Program Evaluation and Review Technique (PERT) (d. [19], [73] and [90]). In contrast to MPM and CPM, random variables describe the activity durations. Based on the optimistic, most likely and pessimistic estimations of the activity durations an assumed Beta distribution is derived in order to calculate the distribution of the project duration, the critical events, the distribution of earliest and latest occurence of an event, the distribution of the slack of the events and the probability of exceeding a date. By the time the estimates of the distributions have been improved (d. e.g. [52] and [56]). Nevertheless, there are some points of critique concerning the estimation of the resulting distributions and probabilities (d. e.g. [48], [49] and [50]).
Librería: Buchpark, Trebbin, Alemania
EUR 75,10
Cantidad disponible: 1 disponibles
Añadir al carritoCondición: Sehr gut. Zustand: Sehr gut | Sprache: Englisch | Produktart: Bücher | Within a project human and non-human resources are pulled together in a tempo raray organization in order to achieve a predefined goal (d. [20], p. 187). That is, in contrast to manufacturing management, project management is directed to an end. One major function of project management is the scheduling of the project. Project scheduling is the time-based arrangement of the activities comprising the project subject to precedence-, time-and resource-constraints (d. [4], p. 170). In the 1950's the standard methods MPM (Metra Potential Method) and CPM (Cri tical Path Method) were developed. Given deterministic durations and precedence constraints the minimum project length, time windows for the start times and critical paths can be calculated. At the same time another group of researchers developed the Program Evaluation and Review Technique (PERT) (d. [19], [73] and [90]). In contrast to MPM and CPM, random variables describe the activity durations. Based on the optimistic, most likely and pessimistic estimations of the activity durations an assumed Beta distribution is derived in order to calculate the distribution of the project duration, the critical events, the distribution of earliest and latest occurence of an event, the distribution of the slack of the events and the probability of exceeding a date. By the time the estimates of the distributions have been improved (d. e.g. [52] and [56]). Nevertheless, there are some points of critique concerning the estimation of the resulting distributions and probabilities (d. e.g. [48], [49] and [50]).
Librería: Mispah books, Redhill, SURRE, Reino Unido
EUR 155,61
Cantidad disponible: 1 disponibles
Añadir al carritoPaperback. Condición: Like New. LIKE NEW. SHIPS FROM MULTIPLE LOCATIONS. book.
Librería: Mispah books, Redhill, SURRE, Reino Unido
EUR 162,73
Cantidad disponible: 1 disponibles
Añadir al carritoPaperback. Condición: Like New. Like New. book.
Idioma: Alemán
Publicado por Steinbach Sprechende Bücher / Bernstein Voices, 2002
ISBN 10: 3886988015 ISBN 13: 9783886988013
Librería: Druckwaren Antiquariat, Salzwedel, Alemania
Miembro de asociación: GIAQ
EUR 30,00
Cantidad disponible: 1 disponibles
Añadir al carritoAudio CDs in Pappbox. Condición: Sehr gut. Ungekürzte Lesung. Ings. ca. 275 min Spieldauer. Box etw. berieben, CDs sehr gut erh.! ISBN: 9783886988013 Sprache: Deutsch Gewicht in Gramm: 550.
Librería: DER COMICWURM - Ralf Heinig, Hohnhorst, DE, Alemania
EUR 9,99
Cantidad disponible: 1 disponibles
Añadir al carritoHardcover. Condición: Wie neu. 2. Aufl. 2014. ---. nein.
EUR 9,99
Cantidad disponible: 1 disponibles
Añadir al carritoHardcover. Condición: Wie neu. gekürzte Lesung. ---. nein.
EUR 10,00
Cantidad disponible: 1 disponibles
Añadir al carritoHardcover. Condición: Wie neu. 1. Auflage, Ungekürz. ---. nein.
Librería: DER COMICWURM - Ralf Heinig, Hohnhorst, DE, Alemania
EUR 13,99
Cantidad disponible: 1 disponibles
Añadir al carritoHardcover. Condición: Wie neu. 3. Auflage, Gekürzte. ---. nein.
Idioma: Inglés
Publicado por Springer, Springer Spektrum Mai 1994, 1994
ISBN 10: 354057834X ISBN 13: 9783540578345
Librería: BuchWeltWeit Ludwig Meier e.K., Bergisch Gladbach, Alemania
EUR 106,99
Cantidad disponible: 2 disponibles
Añadir al carritoTaschenbuch. Condición: Neu. This item is printed on demand - it takes 3-4 days longer - Neuware -Within a project human and non-human resources are pulled together in a tempo raray organization in order to achieve a predefined goal (d. [20], p. 187). That is, in contrast to manufacturing management, project management is directed to an end. One major function of project management is the scheduling of the project. Project scheduling is the time-based arrangement of the activities comprising the project subject to precedence-, time-and resource-constraints (d. [4], p. 170). In the 1950's the standard methods MPM (Metra Potential Method) and CPM (Cri tical Path Method) were developed. Given deterministic durations and precedence constraints the minimum project length, time windows for the start times and critical paths can be calculated. At the same time another group of researchers developed the Program Evaluation and Review Technique (PERT) (d. [19], [73] and [90]). In contrast to MPM and CPM, random variables describe the activity durations. Based on the optimistic, most likely and pessimistic estimations of the activity durations an assumed Beta distribution is derived in order to calculate the distribution of the project duration, the critical events, the distribution of earliest and latest occurence of an event, the distribution of the slack of the events and the probability of exceeding a date. By the time the estimates of the distributions have been improved (d. e.g. [52] and [56]). Nevertheless, there are some points of critique concerning the estimation of the resulting distributions and probabilities (d. e.g. [48], [49] and [50]). 164 pp. Englisch.
Idioma: Inglés
Publicado por Springer Berlin Heidelberg, Springer Berlin Heidelberg Mai 1994, 1994
ISBN 10: 354057834X ISBN 13: 9783540578345
Librería: buchversandmimpf2000, Emtmannsberg, BAYE, Alemania
EUR 106,99
Cantidad disponible: 1 disponibles
Añadir al carritoTaschenbuch. Condición: Neu. This item is printed on demand - Print on Demand Titel. Neuware -Within a project human and non-human resources are pulled together in a tempo raray organization in order to achieve a predefined goal (d. [20], p. 187). That is, in contrast to manufacturing management, project management is directed to an end. One major function of project management is the scheduling of the project. Project scheduling is the time-based arrangement of the activities comprising the project subject to precedence-, time-and resource-constraints (d. [4], p. 170). In the 1950's the standard methods MPM (Metra Potential Method) and CPM (Cri tical Path Method) were developed. Given deterministic durations and precedence constraints the minimum project length, time windows for the start times and critical paths can be calculated. At the same time another group of researchers developed the Program Evaluation and Review Technique (PERT) (d. [19], [73] and [90]). In contrast to MPM and CPM, random variables describe the activity durations. Based on the optimistic, most likely and pessimistic estimations of the activity durations an assumed Beta distribution is derived in order to calculate the distribution of the project duration, the critical events, the distribution of earliest and latest occurence of an event, the distribution of the slack of the events and the probability of exceeding a date. By the time the estimates of the distributions have been improved (d. e.g. [52] and [56]). Nevertheless, there are some points of critique concerning the estimation of the resulting distributions and probabilities (d. e.g. [48], [49] and [50]).Springer Verlag GmbH, Tiergartenstr. 17, 69121 Heidelberg 164 pp. Englisch.