Transformer and Reactor Procurement
Idioma: inglés
Editorial: Springer International Publishing, Springer Nature Switzerland Sep 2022, 2022
- Tapa dura
- Nuevo

Librería: buchversandmimpf2000, Emtmannsberg, BAYE, Alemaniabuchversandmimpf2000
Vendedor de IberLibro desde 23 de enero de 2017
Condición: Nuevo
EUR 235,39
Cantidad disponible: 1 disponible
Añadir al carritoDescripción del artículo del vendedor
This item is printed on demand - Print on Demand Titel. Neuware Springer-Verlag GmbH, Tiergartenstr. 17, 69121 Heidelberg 556 pp. Englisch.
N° de ref. del artículo 9783030804688
- Título
- Transformer and Reactor Procurement
- Autor
- Gilson M. Bastos
- Editorial
- Springer International Publishing, Springer Nature Switzerland Sep 2022
- Año de publicación
- 2022
- Estado
- Neu
- Encuadernación
- Buch
- Idioma
- inglés
- ISBN 10
- 3030804682
- ISBN 13
- 9783030804688
- Peso del artículo
- 1093 gramos
- Dimensiones
- 241x160x34 mm
- Serie
- Libro 8 de 10: CIGRE Green Books
This Green Book provides those involved in transformer procurement with comprehensive guidance on industry best practice to avoid wrong decisions. Transformers are one of the expensive components in the power system, and also contribute a large proportion of the losses. Transformers also have long lives - more than 40 years in many cases. Making the wrong decisions during the procurement process can have serious and long-lasting consequences.
“Sinopsis” puede pertenecer a otra edición de este título.
Acerca del autor
Gilson M Bastos was born in Brazil in 1954 and graduated in Electrcial Engineering from the Catholic University of Rio de Janeiro in 1979. He joined Furnas Centrais Eletricas, one of the largest utilities in Brazil, and working as transformer engineer and electrical equipment engineer up to 2007. From 2007 to 2013 he worked in the renewable energy area as manager of the planning department. From 2014 until his retirement from Furnas in 2017, he was in charge of all transmission projects. Following his retirement from Furnas, he has joined MSG Transmission, where he is responsible for new 500kV transmission projects.
He has been an active member of CIGRE for many years. He was a member of working groups A2.27 on condition monitoring facilities, A2/B4.28 on HVDC transformers, and A2.37 on transformer reliability. He was also regular member for Brazil on SC A2 between 2014 and 2020.
Tom Breckenridge was born in Greenock, Scotland, in 1955. He studied electrical and electronic engineering at the University of Glasgow between 1973 and 1977. He joined the South of Scotland Electricity Board in 1978, initially as an operational engineer within the distribution field. A move to transmission substation design followed in 1996, where he also assumed the role as principal transformer expert for Scottish Power responsible for specification purchasing and approval of all transformers. Leaving Scottish Power in 2006, he founded TB TCS Ltd through which he provides specialist services in the field of large power transformers on a global basis, primarily operating in the procurement area.
He is a registered European engineer, a fellow of the IET, a UK chartered engineer, and a distinguished member of CIGRE. He was convenor of CIGRE working group A2-36 on transformer procurement. Tom is chairman designate of British Standards PEL/14 committee for power transformers and a member of several IEC maintenance teams under IEC TC14 where he was also IEC convener for the latest version of IEC/IEEE standard 60076-16 for wind turbine transformers.Mike Lamb was born in the USA in 1966. He is currently manager of electric transmission operations engineering in the power delivery group at Dominion Energy in Richmond Virginia, USA. He joined Dominion Energy in 1988 and has held several engineering positions during his career with experience in electric substation and transmission line design and maintenance, distribution system planning and operations, and system operations contingency analysis and transmission open access. Prior to his current position, he was principal engineer in electric transmission operations engineering responsible for the technical oversight of the power transformer procurement process in support of all Dominion Energy’s business units. Mike now leads a team of specialized engineers responsible for major electric transmission equipment specifications; system analysis, technical investigations and root cause analyses, and providing analysis and guidance for emerging technological challenges.
He became a member of CIGRE in 2007. Mike was a member of CIGRE working group A2.36 on transformer procurement andsecretary of CIGRE working group A2.48 on shunt reactors, and he is secretary of CIGRE working group A2.58 on installation and pre-commissioning. He has been an active member of CIGRE USNC and was a recipient in 2018 of the Attwood Associate Award.
Tara-Lee MacArthur studied electrical engineering at Queensland University of Technology from 2008 to 2011, graduating with a BEng. She works for an Australian energy utility as a substation design standards engineer and is noted for her work on power transformer specification and design and transformer life management. She is a member of the CIGRE Australia A2 mirror panel (since 2015) and director of the CIGRE Australia Board (since 2020). She has been an active member within CIGRE internationally as secretary of CIGRE Working Group A2.49 between 2016 and 2019 and has been chair of A2 AG.2 on tutorials since 2020. She is a registered professional engineer in Queensland, Australia.
Simon Ryder was born in Englandin 1973. He studied engineering science at St John’s College, Oxford University, between 1992 and 1996. He worked for GEC Alsthom and later Alstom, between 1997 and 2003, in transformer design, development, and eventually research. He is known for his work on thermal characteristics of transformers and frequency response analysis (FRA). He joined Doble in 2003, initially working mainly on transformer life management. Since 2009, he has worked mainly on transformer procurement, especially supplier qualification and development.
He is a senior member of IEEE-PES, a fellow of IET, and a chartered engineer. He was a member of CIGRE working groups A2.36 on transformer procurement, D1/A2.47 on advances in DGA interpretation, and A2.58 on transformer installation, pre-commissioning, and trial operation, and was convenor of CIGRE working group A2.48 on shunt reactors. He was chairman of CIGRE Committee A2 on power transformers and reactors between 2016 and 2020. He is editor-in-chief ofthis Green Book.
“Acerca de” puede pertenecer a otra edición de este título.
buchversandmimpf2000
Emtmannsberg, BAYE, Alemania
Vendedor de IberLibro desde 23 de enero de 2017
Tarifas de envío de Alemania a Estados Unidos de America
| Artículo | De 60 a 60 días hábiles | De 60 a 60 días hábiles |
|---|---|---|
| Primer artículo | EUR 60,00 | EUR 75,00 |
Métodos de pago
- Cheque
- PayPal
Descripción de la tienda
Impressum Thorsten Retsch Buchversand Mimpf2000 Oberölschnitz 16 95517 Emtmannsberg Deutschland Telefon: 09209-2023188 Email: mimpf2000@online.de USt-ID-Nr.: DE 235096871 Wir führen gebrauchte Bücher aus allen Sparten der Literatur
Especialidad
Modernes Antiquariat - Bücher von 1960 bis heuteInformación empresarial del vendedor
buchversandmimpf2000
Alemania
Condiciones de venta
Impressum
Gesetzliche Anbieterkennung:
Thorsten Retsch
Buchversand Mimpf2000
Oberölschnitz 16
95517 Emtmannsberg
Deutschland
Telefon: 092092023188
E-Mail: order@buchversandmimpf2000.de
USt-IdNr.: DE 235096871
Alternative Streitbeilegung:
Die Europäische Kommission stellt eine Plattform für die außergerichtliche Online-Streitbeilegung (OS-Plattform) bereit, aufrufbar unter http://ec.europa.eu/odr.
Derecho al desistimiento
Si es un consumidor, puede rescindir el contrato de acuerdo con lo siguiente. Por consumidor se entiende cualquier persona física que actúe con fines ajenos a su actividad comercial, empresarial, oficio o profesión.
Información sobre el derecho de desistimiento
Derecho legal de desistimiento
Tiene derecho a rescindir este contrato en un plazo de 14 días sin dar ningún motivo.
El periodo de desistimiento vencerá a los 14 días desde que usted, o un tercero que no sea el transportista e indicado por usted, adquiera la posesión física del último bien o del último lote o pieza.
Para ejercer el derecho de desistimiento, complete de forma electrónica y envíe una declaración clara en nuestro sitio web, desde "Mis compras" en "Mi cuenta". Le enviaremos sin demora un acuse de recibo de dicho desistimiento a través de un soporte duradero (por ejemplo, por correo electrónico).
Para cumplir con el plazo de desistimiento, basta con que envíe su comunicación relativa al ejercicio del derecho de desistimiento antes de que venza el periodo de desistimiento.
Efectos del desistimiento
Si rescinde este contrato, le reembolsaremos todos los pagos que hayamos recibido de usted, incluidos los gastos de envío (excepto los gastos adicionales que surjan si elige un tipo de envío que no sea el tipo de envío estándar más económico que ofrecemos).
Podemos hacer una deducción del reembolso por la pérdida de valor de cualquier bien suministrado, si la pérdida es el resultado de una manipulación innecesaria por su parte.
Efectuaremos el reembolso sin demoras indebidas y, a más tardar, 14 días después de que se nos informe de su decisión de rescindir este contrato.
Efectuaremos el reembolso utilizando el mismo medio de pago que utilizó para la transacción inicial, a menos que haya acordado expresamente lo contrario; en cualquier caso, no incurrirá en ningún cargo como resultado de dicho reembolso.
Podremos retener el reembolso hasta que hayamos recibido los bienes o hasta que nos haya presentado una prueba de que los ha devuelto, lo que ocurra primero.
Deberá devolver los bienes o entregarlos a buchversandmimpf2000, Emtmannsberg, BAYE, Germany, +49 09209-2023188, sin demoras indebidas y, en cualquier caso, en un plazo máximo de 14 días a partir del día en que nos comunique su desistimiento del presente contrato. El plazo se cumple si devuelve la mercancía antes de que venza el periodo de 14 días. Tendrá que asumir los gastos directos de devolución de los bienes. Usted solo es responsable de la disminución del valor de los bienes como resultado de una manipulación distinta a la necesaria para establecer la naturaleza, las características y el funcionamiento de los bienes.
Excepciones al derecho de desistimiento
El derecho de desistimiento no se aplica a lo siguiente:
- La entrega de periódicos, diarios o revistas, con la excepción de los contratos de suscripción; y
- El suministro de contenido digital que no se proporcione en un soporte tangible (por ejemplo, en un CD o DVD) si, al hacer el pedido, aceptó que podíamos empezar a entregarlo y que no podría desistir una vez iniciada la entrega.
Condiciones de envío
Soweit in der Artikelbeschreibung keine andere Frist angegeben ist, erfolgt die Lieferung der Ware innerhalb von 3-5 Werktagen nach Vertragsschluss, bei Vorauszahlung erst nach Eingang des vollständigen Kaufpreises und der Versandkosten. Alle Preise inkl. MwSt.