The Subcontractor Management Playbook (Paperback)
Idioma: inglés
Editorial: Independently Published, 2026
- Tapa blanda
- Nuevo

Librería: CitiRetail, Stevenage, Reino UnidoCitiRetail
Vendedor de IberLibro desde 29 de junio de 2022
Condición: Nuevo
EUR 23,75
Cantidad disponible: 1 disponible
Añadir al carritoDescripción del artículo del vendedor
Paperback. Are you managing your subcontractors, or are they managing you? It is Friday at 3:30 PM. You are standing in the site trailer, staring at a slipping schedule, holding your breath as you dial your key subcontractor. You need progress, and you need it now. "I need six more guys on site Monday morning," you press. "We are falling behind." The voice on the other end offers a smooth, reassuring promise: "Six guys, Monday morning, seven a.m. You have my word." You hang up, feeling a brief wave of relief. But on Monday morning at 7:15 AM, the site is quiet. Only the original, under-resourced crew has shown up, and your site foreman gives you the weary, knowing look that tells you everything you need to know: you have been lied to again. This is the soul-crushing reality of site-trailer management-the exhausting cycle of chasing empty promises, mediating screaming matches between finger-pointing trades, and carrying the crushing weight of project delays on your own shoulders. In The Subcontractor Management Playbook, seasoned construction veteran Daniel R. Whitmore delivers a brutal but liberating truth: subcontractors do not fail because they want to. They fail because your system lets them. This is not an academic textbook on contract law or a generic guide telling you to be tougher, louder, or more aggressive. It is a highly practical, step-by-step masterclass in building a repeatable operating system that turns vague verbal promises into visible, checkable, and measurable commitments. Stop Chasing Promises. Start Enforcing Systems. The core philosophy of this playbook is simple: clarity before accountability. You cannot fairly hold a trade responsible for a missed deadline when they mobilized to an unready workfront, faced unresolved trade interfaces, or worked under an ambiguous scope. Through a gritty, field-tested narrative, you will follow project manager Alex Morgan as he battles to coordinate the critical drywall package managed by subcontractor Marcus Reed. Alongside Alex, you will learn how to transition from managing "names on a contract" to operating a tight, highly disciplined workflow: Scope, Ready, Commit, Execute, Measure, Correct and Close. Build a Culture of Reliability on Your Site This book gives you the exact blueprint to: Define the Package, Not the Company: Strip away scope ambiguity before mobilization so there is zero room for "that's not my job" disputes.Enforce the "Ready-to-Start" Gate: Protect subcontractor productivity by ensuring their work areas are 100% ready before they set foot on site.Measure Output, Not Presence: Ditch useless headcount tracking and focus strictly on the physical quantities installed.Command the Space Between Trades: Seamlessly coordinate overlapping trades to eliminate sequence clashes and finger-pointing.Deploy the Escalation Ladder: Implement a structured, objective framework to handle underperforming trades without immediately resorting to legal standoffs.The Subcontractor Management Toolkit Included Each of the 15 chapters ends with a field-tested, ready-to-use template designed to be printed out and brought straight to your Monday morning site meetings, including: Subcontractor Package Control SheetReady-to-Start GateWeekly Subcontractor Commitment PlanCommitment Reliability Log & Performance ScorecardThe Subcontractor Escalation LadderFormal Subcontractor Recovery PlanAnd 11 other high-impact site templates.Stop being held hostage by subcontractor excuses. Scroll up, grab your copy of Book Three today, an Shipping may be from our UK warehouse or from our Australian or US warehouses, depending on stock availability.…
N° de ref. del artículo 9798171308469
- Título
- The Subcontractor Management Playbook (Paperback)
- Autor
- Daniel R. Whitmore
- Editorial
- Independently Published
- Año de publicación
- 2026
- Estado
- new
- Encuadernación
- Paperback
- Idioma
- inglés
- ISBN 13
- 9798171308469
It is Friday at 3:30 PM. You are standing in the site trailer, staring at a slipping schedule, holding your breath as you dial your key subcontractor. You need progress, and you need it now. "I need six more guys on site Monday morning," you press. "We are falling behind." The voice on the other end offers a smooth, reassuring promise: "Six guys, Monday morning, seven a.m. You have my word." You hang up, feeling a brief wave of relief. But on Monday morning at 7:15 AM, the site is quiet. Only the original, under-resourced crew has shown up, and your site foreman gives you the weary, knowing look that tells you everything you need to know: you have been lied to again. This is the soul-crushing reality of site-trailer management—the exhausting cycle of chasing empty promises, mediating screaming matches between finger-pointing trades, and carrying the crushing weight of project delays on your own shoulders.
In The Subcontractor Management Playbook, seasoned construction veteran Daniel R. Whitmore delivers a brutal but liberating truth: subcontractors do not fail because they want to. They fail because your system lets them. This is not an academic textbook on contract law or a generic guide telling you to be tougher, louder, or more aggressive. It is a highly practical, step-by-step masterclass in building a repeatable operating system that turns vague verbal promises into visible, checkable, and measurable commitments. Stop Chasing Promises. Start Enforcing Systems. The core philosophy of this playbook is simple: clarity before accountability. You cannot fairly hold a trade responsible for a missed deadline when they mobilized to an unready workfront, faced unresolved trade interfaces, or worked under an ambiguous scope. Through a gritty, field-tested narrative, you will follow project manager Alex Morgan as he battles to coordinate the critical drywall package managed by subcontractor Marcus Reed. Alongside Alex, you will learn how to transition from managing "names on a contract" to operating a tight, highly disciplined workflow: Scope, Ready, Commit, Execute, Measure, Correct and Close.
Build a Culture of Reliability on Your Site This book gives you the exact blueprint to:
- Define the Package, Not the Company: Strip away scope ambiguity before mobilization so there is zero room for "that's not my job" disputes.
- Enforce the "Ready-to-Start" Gate: Protect subcontractor productivity by ensuring their work areas are 100% ready before they set foot on site.
- Measure Output, Not Presence: Ditch useless headcount tracking and focus strictly on the physical quantities installed.
- Command the Space Between Trades: Seamlessly coordinate overlapping trades to eliminate sequence clashes and finger-pointing.
- Deploy the Escalation Ladder: Implement a structured, objective framework to handle underperforming trades without immediately resorting to legal standoffs.
- Subcontractor Package Control Sheet
- Ready-to-Start Gate
- Weekly Subcontractor Commitment Plan
- Commitment Reliability Log & Performance Scorecard
- The Subcontractor Escalation Ladder
- Formal Subcontractor Recovery Plan
- And 11 other high-impact site templates.
“Sinopsis” puede pertenecer a otra edición de este título.
CitiRetail
Stevenage, Reino Unido
Vendedor de IberLibro desde 29 de junio de 2022
Tarifas de envío de Reino Unido a Estados Unidos de America
| Artículo | De 7 a 14 días hábiles | De 7 a 60 días hábiles |
|---|---|---|
| Primer artículo | EUR 43,79 | EUR 43,79 |
Métodos de pago
Descripción de la tienda
Online business
Información empresarial del vendedor
ABC BOOKS LIMITED
10 John Street
London, Reino Unido WC1N 2EB
Condiciones de venta
Orders can be returned within 30 days of receipt.
Derecho al desistimiento
Si es un consumidor, puede rescindir el contrato de acuerdo con lo siguiente. Por consumidor se entiende cualquier persona física que actúe con fines ajenos a su actividad comercial, empresarial, oficio o profesión.
Información sobre el derecho de desistimiento
Derecho legal de desistimiento
Tiene derecho a rescindir este contrato en un plazo de 14 días sin dar ningún motivo.
El periodo de desistimiento vencerá a los 14 días desde que usted, o un tercero que no sea el transportista e indicado por usted, adquiera la posesión física del último bien o del último lote o pieza.
Para ejercer el derecho de desistimiento, complete de forma electrónica y envíe una declaración clara en nuestro sitio web, desde "Mis compras" en "Mi cuenta". Le enviaremos sin demora un acuse de recibo de dicho desistimiento a través de un soporte duradero (por ejemplo, por correo electrónico).
Para cumplir con el plazo de desistimiento, basta con que envíe su comunicación relativa al ejercicio del derecho de desistimiento antes de que venza el periodo de desistimiento.
Efectos del desistimiento
Si rescinde este contrato, le reembolsaremos todos los pagos que hayamos recibido de usted, incluidos los gastos de envío (excepto los gastos adicionales que surjan si elige un tipo de envío que no sea el tipo de envío estándar más económico que ofrecemos).
Podemos hacer una deducción del reembolso por la pérdida de valor de cualquier bien suministrado, si la pérdida es el resultado de una manipulación innecesaria por su parte.
Efectuaremos el reembolso sin demoras indebidas y, a más tardar, 14 días después de que se nos informe de su decisión de rescindir este contrato.
Efectuaremos el reembolso utilizando el mismo medio de pago que utilizó para la transacción inicial, a menos que haya acordado expresamente lo contrario; en cualquier caso, no incurrirá en ningún cargo como resultado de dicho reembolso.
Podremos retener el reembolso hasta que hayamos recibido los bienes o hasta que nos haya presentado una prueba de que los ha devuelto, lo que ocurra primero.
Deberá devolver los bienes o entregarlos a CitiRetail, Stevenage, United Kingdom, sin demoras indebidas y, en cualquier caso, en un plazo máximo de 14 días a partir del día en que nos comunique su desistimiento del presente contrato. El plazo se cumple si devuelve la mercancía antes de que venza el periodo de 14 días. Tendrá que asumir los gastos directos de devolución de los bienes. Usted solo es responsable de la disminución del valor de los bienes como resultado de una manipulación distinta a la necesaria para establecer la naturaleza, las características y el funcionamiento de los bienes.
Excepciones al derecho de desistimiento
El derecho de desistimiento no se aplica a lo siguiente:
- La entrega de periódicos, diarios o revistas, con la excepción de los contratos de suscripción; y
- El suministro de contenido digital que no se proporcione en un soporte tangible (por ejemplo, en un CD o DVD) si, al hacer el pedido, aceptó que podíamos empezar a entregarlo y que no podría desistir una vez iniciada la entrega.
Condiciones de envío
Please note that titles are dispatched from our US, Canadian or Australian warehouses. Delivery times specified in shipping terms. Orders ship within 2 business days. Delivery to your door then takes 7-14 days.