Schedule for Sale | WorkFace Planning for Construction Projects
Idioma: inglés
Editorial: AuthorHouse, 2009
- Tapa blanda
- Nuevo

Librería: preigu, Osnabrück, Alemaniapreigu
Vendedor de AbeBooks desde 5 de agosto de 2024
Condición: Nuevo
EUR 32,15
Cantidad disponible: 5 disponibles
Añadir al carritoDescripción del artículo del vendedor
Schedule for Sale | WorkFace Planning for Construction Projects | Geoff Ryan P. M. P. | Taschenbuch | Kartoniert / Broschiert | Englisch | 2009 | AuthorHouse | EAN 9781449041960 | Verantwortliche Person für die EU: Libri GmbH, Europaallee 1, 36244 Bad Hersfeld, gpsr[at]libri[dot]de | Anbieter: preigu Print on Demand.
N° de ref. del artículo 109209154
- Título
- Schedule for Sale | WorkFace Planning for Construction Projects
- Autor
- Geoff Ryan P. M. P.
- Editorial
- AuthorHouse
- Año de publicación
- 2009
- Estado
- Neu
- Encuadernación
- Taschenbuch
- Idioma
- inglés
- ISBN 10
- 1449041965
- ISBN 13
- 9781449041960
- Peso del artículo
- 298 gramos
- Dimensiones
- 229 x 152 x 11 mm
- Catálogos de vendedores
- Bücher
Schedule for Sale is a guidebook on how to apply WorkFace Planning, an industry best practice first identified by The Construction Owners Association of Alberta in 2005. The process organizes the elements necessary for productive construction, which then leads to improved quality and reduced schedule & costs from the absence of chaos. The reduction of energy consumption from the shortened schedule is also the foundation for Green Construction.
“Sinopsis” puede pertenecer a otra edición de este título.
Fragmento. © Reproducción autorizada. Todos los derechos reservados.
Schedule for Sale
WorkFace Planning for Construction ProjectsBy Geoff RyanAuthorHouse
Copyright © 2009 Geoff Ryan P.M.P.All right reserved.
ISBN: 978-1-4490-4196-0
Contents
Introduction:............................................................................xiiiChapter - 1 Field Installation Work Packages.............................................1Chapter - 2 Removal of Constraints.......................................................11Chapter - 3 The WorkFace Planners........................................................45Chapter - 4 Summary of Basic Principles..................................................57Chapter - 5 Resources....................................................................59Chapter - 6 Scaffold.....................................................................61Chapter - 7 Construction Equipment.......................................................75Chapter - 8 Material Management..........................................................89Chapter - 9 Information Streams..........................................................111Chapter - 10 WorkFace Planning by Design.................................................135Chapter - 11 Data -> Information -> Knowledge -> Understanding...........................163Chapter - 12 Beyond WorkFace Planning and WorkFace Planning Software.....................177
Chapter One
FIWPs: (Field Installation Work Packages)A sample FIWP is available under the sample documents folder of the website.
http://www.scheduleforsale.com
A FIWP is a detailed plan that contains 500 to 1000 hours of work that will be executed during one rotation, by one crew, from a single trade discipline. Based on 10 workers and a Foreman working 10-hour shifts for a rotation of either 5 days (500hours) or 10 days (1000 hours). The expectation is that the crew will start work on their 500-hour plan when their shift starts on Monday and the plan will be complete by the end of the shift on Friday. For the purpose of this book, we will use the 1000-hour packages. The "10 days on / 4 days off" schedule is emerging as the most common shift for our application of industrial construction.
The logic behind this scale is that most of the activities on any work site are based upon the rotation. We start activities with the intent of getting them finished by the end of the rotation or we envision a certain stage of progress before we go home for the weekend.
The Contents of each FIWP:
Each FIWP must have:-
A cover page: that shows a 3D picture of the scope, a one line definition of the scope, the FIWP number, and the Planned Value in work hours.
A table of Contents: This is a basic function of all good technical documents, provided so that the reader does not have to read the whole document to get the answer that they are looking for.
Constraint page: This page will list the constraints in order, showing the status of each one with a final sign off column for QC, Safety and the Superintendent. A note of warning: There is a temptation to get all of the stakeholders to sign off on a FIWP before the work is released. This will effectively choke the process and add weeks to the development cycle. The only signatures required are for Quality Control, Safety and the Superintendent.
A detailed scope of work: the level of detail here will change based upon the experience of your workforce. In Alberta we are privileged to work with a mature workforce that has at least 7 mega projects of experience over the last 10 years and tradesmen that have all graduated from government run apprenticeship programs. We don't need to tell this workforce the details of a simple rigging lift. At the other extreme if we were building a petrochemical plant in a third world country that has had very little economic activity, we should probably include a diagram that shows a clevis, sling and softeners for a steel rigging plan. Ultimately, the level of detail in a FIWP develops based on the feedback that a WorkFace Planner gets from the Foremen.
Safety Planning: The true value from this page comes when the Foreman utilizes it to create and maintain a culture of safety around the scope of work. There are standard safety documents that should be added to every scope of work, however the Safety representative that reviews this FIWP should also use it as a way to focus the Foreman's attention on specific dangers that are present in the work identified. This could be in the form of a toolbox talk that references the type of work being executed or a heads up statement about the latest injury statistics. Ultimately, the Foreman is responsible for the safe execution of work and this section should be used as a means to help them prepare for that. As a two-way communication tool, the FIWP is also alerting the Safety team to the imminent path of construction.
Quality Planning: The Quality Control team should use this interaction with the FIWP as a means to communicate directly with the Foreman on specific activities. The best way to do this is to extract the portion of the Inspection and Test Plan (ITP) that is relevant to the scope and highlights the places where the Foreman will need to get signatures, notify inspectors or implement holds. By adding the documents required for turnover, the QC team can effectively utilize the FIWPs to facilitate turnover from the first day of construction. As the FIWP is returned from the field, the QC team extracts the completed documents and replaces them with copies. The original documents are filed under their system number in the QC office. If there is a problem with the documents, it allows the QC inspectors to address the problem immediately with the Foreman who did the work. By reviewing all of the FIWPs the QC teams are also being kept in the loop for the execution of construction activities.
This section requires a sign off from the Quality Control Representative, to ensure that every package is reviewed.
Trade Coordination: In the world of fast track construction one of the biggest barriers to productive activity is the problem of trade congestion. It is the responsibility of the WorkFace Planner to be aware of the activities of other trades and to mitigate the risks of delays caused by conflicts of access. This page should be used by the WorkFace Planner to communicate the risks and the mitigation strategies with the Foreman. This could be as simple as the names of the other trade foremen in the area and their radio ID. It could be as complex as a schedule for access to an area to allow another crew some time for an overhead lift.
We can facilitate this interaction between the trades by ensuring that all of the WorkFace Planners are in the same location and have regular coordination meetings. Ultimately, the General Superintendent is responsible to resolve trade access conflicts that cannot be negotiated by the Lead WorkFace Planner.
Material Confirmation: This is a critical component of the FIWP and historically the single element that continually prevents productive activity. The WorkFace Planner must be absolutely confident that material is available and that it will be delivered to the site in the days prior to the first day of execution for this FIWP. This section of the FIWP must show:
A Bill of Materials (BOM) for the FIWP that shows a complete list of every component required to install this FIWP.
A copy of the confirmation from the WorkFace Planning Material Coordinator that the material is available and that bulk materials have been hard allocated against this FIWP.
A copy of the Request for Material with a Required On Site (ROS) date.
Radio or cell phone contact information for the driver that will deliver the material.
All of this information will be supplied to the WorkFace Planner by the WorkFace Planning Material Coordinator.
Scaffold Confirmation: This should be a one page document that shows the request for scaffolds, and the confirmation that they have been erected, complete with contact information for the Scaffold Foreman. Later in this book, we will explore the detail of how a scaffold management database can be utilized to manage all of this data and produce reports.
Construction Equipment Confirmation: Just like the scaffold request, this one page document (from an equipment management database) must show the list of equipment requested and have confirmation that the equipment will be ready for pick up or delivered to site prior to the commencement of work.
Timesheets and Cost codes: This section should contain all of the timesheets that the Foreman will require with predefined cost codes on each timesheet. One of the fringe benefits that we get from having a defined scope of work is that we can also identify exactly which cost codes the work should be charged to. This removes the guesswork that the Foremen typically struggle with and will give us a higher level of confidence in the costs charged against work. The extension of this logic takes us to the naming convention that we use for the FIWP. It should identify the work using the same naming convention as the Work Breakdown Structure (WBS) and then link the cost code structure to the FIWP, (more on this later). The net result is that the time sheets have the FIWP number as part of their cost coding. This gives us a Productivity Factor (PF) for each FIWP (Crew by rotation) with very little effort and a great deal of accuracy.
Drawings and Model shots: The drawings on any construction project are the ruling document, so the accuracy of this section is critical. Typically the model snap shots that should accompany each drawing are for reference only and should be labeled so. The WorkFace Planner has the sole responsibility to ensure that the FIWP has the latest revisions immediately prior to release. The QC team should also utilize this section to collect weld data (by weld stamping) or installation data for Electrical, Instrumentation and Steel.
Value to the Customer
We get good quality FIWPs when we think of the plan as a product that is developed by a supplier to address the needs of a customer. The planner is the supplier and the work crew is the customer. To satisfy the customer's expectations the scope needs to be achievable and supported by a current reality.
Achievable Scope:
The rule that we have used successfully when developing WorkFace Planners was to ask them to envision how much work that they could achieve with one crew, in one rotation, given the ideal set of circumstances. Imagine that nothing will go wrong and develop your scope based on that. Then add another 10% to make sure that you don't run out of work.
This is a very important basis for planning.
If we plan for things to go wrong they will,
if we plan for things to go right they will.
So make a conscious decision on which outcome that you want and don't worry too much about reality. (We will create our own reality)
The common model for this type of thought is:
Note: This model does not ask: How far can I get from here? OK that is what I want. This is the same basis that we use for the "zero safety incidents" mentality. It is not about what we expect to happen it is about what we want to happen. We want to have no safety incidents and we want to build plans that get stuff done.
Current Reality:
The WorkFace Planners create a current reality as they remove constraints. Immediately prior to the release of a FIWP, we would expect that the current reality would be that the material is available, the scaffold has been erected, the work is aligned with the schedule etc.
The presence of these two elements, achievable scope and current reality, is expected to lead to a situation where the General Foreman can hand a FIWP to their Foremen, look them in the eye and say "I expect that you will get this done in one rotation".
These two elements: Achievable Scope and Current Reality (the Removal of Constraints) are therefore critical to the successful execution of FIWPs.
WorkFace Planning Software: The market has several very good products that will load a 3D model with installation unit rates and allow a planner or a group of field experts to click on a component and have the model tell us how long it will take to install (amongst other things). So for WorkFace Planners who are trying to visualize work and estimate how much they can get done, this is like the invention of the wheel. My advice to you is to buy one of these products and use it lots, (much more to come).
Constructing your Field Installation Work Packages:
There are many different ways for WorkFace Planners to build FIWPs. The two ends of this scale might look something like this:
1. Lock yourself in a dark room with some rainforest music and invite your Maker to help you develop the perfect FIWPs.
Or at the other end of the scale;
2. Fill a meeting room with Superintendents, General Foremen, Foremen, Schedulers, and WorkFace Planners. Then project the 3D model onto one wall and pull out a single CWP (Single discipline and <40,000 hours). Now ask the room "which piece goes in first". Then use the WorkFace Planning software to build virtual FIWPs based upon the experience in the room and supported by the installation unit rates that are built into the model.
Your own application of WorkFace Planning will probably be somewhere between these points.
An important rule of the universe to inject here is that: Your results are directly related to your effort.
If you take the time to pull very valuable people out of the field, or bring them in on overtime, you will reap the benefits from a common vision and good quality plans, I've seen it.
Chapter Two
Removal of Constraints:(This is the creation of reality that I referred to earlier)
As each FIWP is created, it is assumed to have this list of constraints:
1. Construction Work Package - Must be Issued For Construction
2. Scheduled - The work must be aligned with the Path of Construction.
3. Engineering Data - Engineered drawings must be issued and available.
4. Prerequisite work - The work that has to happen before this FIWP can be executed must be complete.
5. Materials - Every component must be identified and confirmed onsite.
6. Scaffold - Must be identified, ordered and built fit for purpose.
7. Construction Equipment - Must be identified and confirmed fit for purpose.
8. Tools - There must be clear access to a reliable supply of the right tools.
9. Resources - Qualified trades people must be available with all of the appropriate site training requirements.
10. Quality documentation - The reference documents that will govern the scope (ITPs) must be identified and available.
11. Safety Planning - There must be a program that will support the Foreman's safe application of the work.
12. Access to the work face - The Permits required and congestion from other activities/trades must have been identified.
The work cannot be considered achievable until all of these constraints have been removed. Any exception to this is a deviation from WorkFace Planning that will cost you schedule (and money, reputation, sleep etc).
From birth, the FIWP travels through a series of developmental stages on the path to full maturity and successful execution. As each constraint is satisfied, the FIWP progresses to the next one and so on until we have created a current reality for that package, which allows the scope to be executed.
In the following example you can see 18 FIWPs maturing from left to right and from red to green towards the final column "Progress Recorded" This page represents one Construction Work Package (CWP) for Pipe and shows that we have three FIWPs in the danger zone (red) held up by material and prerequisite work (steel). We have eight FIWPs in the preparation phase, (yellow) and three FIWPs in the chute (green) ready for execution.
It is a very important project management function that this information be tracked and displayed. This single document is the pulse of the project.
A coloured sample of the Pack Track spreadsheet can be downloaded from the website.
Constraints in Detail:
In the following passages we will take a closer look at what it takes to satisfy each of the constraints. There is another level of detail behind each constraint that we will explore further, later in the book. For now this is a guide that the WorkFace Planners can use to understand how to shape their day to day activities for the removal of constraints.
These activities are based upon the assumption that you have a 3D model and that you have applied a version of WorkFace Planning software. If you do not have a 3D model or have not applied WorkFace Planning software your WorkFace Planners can still function, you will just need more of them.
(Continues...)
Excerpted from Schedule for Saleby Geoff Ryan Copyright © 2009 by Geoff Ryan P.M.P. . Excerpted by permission.
All rights reserved. No part of this excerpt may be reproduced or reprinted without permission in writing from the publisher.
Excerpts are provided by Dial-A-Book Inc. solely for the personal use of visitors to this web site.
“Acerca de” puede pertenecer a otra edición de este título.
preigu
Osnabrück, Alemania
Vendedor de AbeBooks desde 5 de agosto de 2024
Tarifas de envío de Alemania a Estados Unidos de America
| Artículo | De 60 a 60 días hábiles | De 60 a 60 días hábiles |
|---|---|---|
| Primer artículo | EUR 70,00 | EUR 70,00 |
Métodos de pago
- PayPal
Descripción de la tienda
preigu betreibt einen Onlineversandhandel mit über 1 Mio. Produkten in verschiedenen Sortimenten. Das Kernsortiment besteht aus Büchern, Medien und Spielwaren. Ein gelungenes Einkaufserlebnis ist das Ziel einer jeden Bestellung bei preigu, denn der Kunde und seine Zufriedenheit stehen an erster Stelle. preigu setzt daher auf einen kompetenten Kundenservice, funktionierende Prozesse und schnelle Reaktion.
Especialidad
Bücher, SpielwarenInformación empresarial del vendedor
preigu GmbH & Co. KG
Lengericher Landstraße 19
Osnabrück, Alemania 49078
Condiciones de venta
About Us
Legal website operator identification:
preigu GmbH & Co. KG
Lengericher Landstr. 19
49078 Osnabrück
Germany
Telephone: +49 (0) 541 / 580 72 84
Email: mail@preigu.de
VAT No: DE 455 380 498
AG Osnabrück - HRA 209647
PhG: preigu Verwaltung GmbH
AG Osnabrück - HRB 221793
CEO: Ansas Meyer
We are neither willing nor obliged to participate in dispute resolution proceedings before consumer arbitration boards.
We are a member of the initiative "FairCommerce" since 30.11.2016.
For more information, see: https://www.haendlerbund.de/de/haendlerbund/interessenvertretung/faircommerce
Derecho al desistimiento
Instructions for revocation
Right of withdrawal for the sale of goods
Revocation right for consumers
(A ‘consumer' is any natural person who concludes a legal transaction which, to an overwhelming extent, cannot be attributed to either his commercial or independent professional activities.)
Instructions for revocation
Revocation right
You have the right to revoke this contract within 14 days without specifying any reasons.
The revocation period is 14 days with effect from the day,
-
on which you or a third party nominated by you, which is not the carrier, had taken possession of the products, provided you had ordered one or more products within the scope of a standard order and this/these product/products is/are delivered uniformly;
-
on which you or a third party nominated by you, which is not the carrier, had taken possession of the last product, provided you had ordered several products within the scope of a standard order and these products are delivered separately;
-
on which you or a third party nominated by you, which is not the carrier, had taken possession of the last part delivery or the last unit, provided you had ordered a product, which is delivered in several part deliveries or units;
To exercise your right of withdrawal, you must inform us (preigu GmbH & Co. KG, Lengericher Landstr. 19, 49078 Osnabrück, Telephone number: +49 (0) 541 / 580 72 84, E-Mail address: mail@preigu.de) by means of a clear declaration (e.g. a letter sent by post, or an e-mail) of your decision to withdraw from this contract. You can use the attached model withdrawal form for this purpose, which is, however, not mandatory.
You can also exercise your right of withdrawal online by clicking on a button labelled accordingly (such as ‘Withdraw from contract' or similar) on the AbeBooks/ZVAB website. If you use this online function, you will immediately receive a confirmation of receipt on a durable medium (e.g. via email) containing information on the content of the withdrawal notice, as well as the date and time of its receipt.
In order to safeguard the revocation period, it is sufficient that you send the notification about the exercise of the revocation right before the expiry of the revocation period.
Consequences of the revocation
If you revoke this contract, we shall repay all the payments, which we received from you, including the delivery costs (with the exception of additional costs, which arise from that fact that you selected a form of delivery other than the most reasonable standard delivery offered by us), immediately and at the latest within 14 days from the day on which we received the notification about the revocation of this contract from you. We use the same means of payment, which you had originally used during the original transaction, for this repayment unless expressly agreed otherwise with you; you will not be charged any fees owing to this repayment.
We can refuse the repayment until the products are returned to us or until you have furnished evidence that you have sent the products back to us, depending on whichever is earlier.
You must return or transfer the products to us immediately and, in any case, at the latest within 14 days with effect from the day on which you inform us of the revocation of this contract. The deadline is maintained if you send the products before the expiry of the 14 day deadline.
You bear the direct costs for returning the products.
You must pay for any depreciation of the products only if this depreciation can be attributed to any handling with you that was not necessary for checking the condition, features and functionality of the products.
Criteria for exclusion or expiry
The revocation right is not available for contracts
-
for delivery of products, which are not prefabricated and for whose manufacturing an individual selection or stipulation by the consumer is important or which are clearly tailored to the personal requirements of the consumer;
-
for delivery of products, which can spoil quickly or whose use-by date would be exceeded quickly;
-
for delivery of alcoholic drinks, whose price was agreed at the time of concluding the contract, which however can be delivered 30 days after the conclusion of the contract at the earliest and whose current value depends on the fluctuations in the market, on which the entrepreneur has no influence;
-
for delivery of newspapers, periodicals or magazines with the exception of subscription contracts. The revocation right expires prematurely in case of contracts
-
for delivery of sealed products, which are not suitable for return for reasons of health protection or hygiene if their seal has been removed after the delivery;
-
for delivery of products if they have been mixed inseparably with other goods after the delivery, owing to their condition;
-
for delivery of sound or video recording or computer software in a sealed package if the seal has been removed after the delivery.
Specimen - revocation form
(If you wish to revoke the contract, please fill up this form and send it back to us.)
-
To preigu GmbH & Co. KG, Lengericher Landstr. 19, 49078 Osnabrück, Email address: mail@preigu.de :
-
I/we () herewith revoke the contract concluded by me/ us () regarding the purchase of the following products ()/
the provision of the following service () -
Ordered on ()/ received on ()
-
Name of the consumer(s)
-
Address of the consumer(s)
-
Signature of the consumer(s) (only in case of a notification on paper)
-
Date
(*) Cross out the incorrect option.