Resource-Constrained Project Scheduling: Models, Algorithms, Extensions and Applications

Artigues

ISBN 10: 1848210345 ISBN 13: 9781848210349
Editorial: ISTE Ltd and John Wiley & Sons Inc, 2008
Nuevos Encuadernación de tapa dura

Librería: Kennys Bookstore, Olney, MD, Estados Unidos de America Calificación del vendedor: 4 de 5 estrellas Valoración 4 estrellas, Más información sobre las valoraciones de los vendedores

Vendedor de AbeBooks desde 9 de octubre de 2009

Este artículo en concreto ya no está disponible.

Descripción

Descripción:

Resource-Constrained Project Scheduling presents a large variety of models and algorithms dedicated to the resource-constrained project scheduling problem (RCPSP), which aims at scheduling at minimal duration a set of activities subject to precedence constraints and limited resource availabilities. Editor(s): Artigues, Christian; Demassey, Sophie; Neron, Emmanuel. Series: ISTE. Num Pages: 288 pages, Illustrations. BIC Classification: KJMV5. Category: (UP) Postgraduate, Research & Scholarly. Dimension: 238 x 164 x 22. Weight in Grams: 612. . 2008. 1st Edition. Hardcover. . . . . Books ship from the US and Ireland. N° de ref. del artículo V9781848210349

Denunciar este artículo

Sinopsis:

This title presents a large variety of models and algorithms dedicated to the resource-constrained project scheduling problem (RCPSP), which aims at scheduling at minimal duration a set of activities subject to precedence constraints and limited resource availabilities.
In the first part, the standard variant of RCPSP is presented and analyzed as a combinatorial optimization problem. Constraint programming and integer linear programming formulations are given. Relaxations based on these formulations and also on related scheduling problems are presented. Exact methods and heuristics are surveyed. Computational experiments, aiming at providing an empirical insight on the difficulty of the problem, are provided.
The second part of the book focuses on several other variants of the RCPSP and on their solution methods. Each variant takes account of real-life characteristics which are not considered in the standard version, such as possible interruptions of activities, production and consumption of resources, cost-based approaches and uncertainty considerations.
The last part presents industrial case studies where the RCPSP plays a central part. Applications are presented in various domains such as assembly shop and rolling ingots production scheduling, project management in information technology companies and instruction scheduling for VLIW processor architectures.

Acerca del autor: Christian Artigues is a researcher at the Laboratory for Analysis and
Architecture of Systems (LAAS) of the French National Institute for
Scientific Research (CNRS).

Sophie Demassey is an Assistant Professor at the School of Mining Engineering (EMN), Nantes, France.

Emmanuel Néron is Assistant Professor at the Computer Science Department of Polytech'Tours, France, and is a member of the Computer Science Laboratory of the University of Tours, France.

"Sobre este título" puede pertenecer a otra edición de este libro.

Detalles bibliográficos

Título: Resource-Constrained Project Scheduling: ...
Editorial: ISTE Ltd and John Wiley & Sons Inc
Año de publicación: 2008
Encuadernación: Encuadernación de tapa dura
Condición: New

Los mejores resultados en AbeBooks

Imagen de archivo

Christian Artigues (Editor), Sophie Demassey (Editor), Emmanuel Néron (Editor)
Publicado por Wiley-Blackwell, 2008
ISBN 10: 1848210345 ISBN 13: 9781848210349
Nuevo Tapa dura

Librería: New Book Sale, London, Reino Unido

Calificación del vendedor: 5 de 5 estrellas Valoración 5 estrellas, Más información sobre las valoraciones de los vendedores

Hardcover. Condición: New. Usually Dispatched within 1-2 Business Days , Buy with confidence , excellent customer service. Nº de ref. del artículo: 1848210345--A29

Contactar al vendedor

Comprar nuevo

EUR 41,06
EUR 56,94 shipping
Se envía de Reino Unido a Estados Unidos de America

Cantidad disponible: 1 disponibles

Añadir al carrito

Imagen del vendedor

Artigues, Christian; Demassey, Sophie; Neron, Emmanuel
Publicado por Wiley-ISTE, 2008
ISBN 10: 1848210345 ISBN 13: 9781848210349
Nuevo Tapa dura

Librería: GreatBookPrices, Columbia, MD, Estados Unidos de America

Calificación del vendedor: 5 de 5 estrellas Valoración 5 estrellas, Más información sobre las valoraciones de los vendedores

Condición: New. Nº de ref. del artículo: 5510716-n

Contactar al vendedor

Comprar nuevo

EUR 141,81
EUR 2,25 shipping
Se envía dentro de Estados Unidos de America

Cantidad disponible: Más de 20 disponibles

Añadir al carrito

Imagen de archivo

Editor: Christian Artigues (French National Institute for Scientific Research (CNRS)); Editor: Sophie Demassey (School of Mining Engineering (EMN), Nantes, France); Editor: Emmanuel Néron (Computer Science Department of Polytech'Tours, France)
Publicado por John Wiley and Sons, 2008
ISBN 10: 1848210345 ISBN 13: 9781848210349
Nuevo Tapa dura

Librería: INDOO, Avenel, NJ, Estados Unidos de America

Calificación del vendedor: 5 de 5 estrellas Valoración 5 estrellas, Más información sobre las valoraciones de los vendedores

Condición: New. Brand New. Nº de ref. del artículo: 9781848210349

Contactar al vendedor

Comprar nuevo

EUR 144,14
Gastos de envío gratis
Se envía dentro de Estados Unidos de America

Cantidad disponible: Más de 20 disponibles

Añadir al carrito

Imagen del vendedor

Artigues, Christian; Demassey, Sophie; Neron, Emmanuel
Publicado por Wiley-ISTE, 2008
ISBN 10: 1848210345 ISBN 13: 9781848210349
Antiguo o usado Tapa dura

Librería: GreatBookPrices, Columbia, MD, Estados Unidos de America

Calificación del vendedor: 5 de 5 estrellas Valoración 5 estrellas, Más información sobre las valoraciones de los vendedores

Condición: As New. Unread book in perfect condition. Nº de ref. del artículo: 5510716

Contactar al vendedor

Comprar usado

EUR 163,17
EUR 2,25 shipping
Se envía dentro de Estados Unidos de America

Cantidad disponible: Más de 20 disponibles

Añadir al carrito

Imagen del vendedor

Artigues, Christian; Demassey, Sophie; Neron, Emmanuel
Publicado por Wiley-ISTE, 2008
ISBN 10: 1848210345 ISBN 13: 9781848210349
Antiguo o usado Tapa dura

Librería: GreatBookPricesUK, Woodford Green, Reino Unido

Calificación del vendedor: 5 de 5 estrellas Valoración 5 estrellas, Más información sobre las valoraciones de los vendedores

Condición: As New. Unread book in perfect condition. Nº de ref. del artículo: 5510716

Contactar al vendedor

Comprar usado

EUR 169,35
EUR 17,08 shipping
Se envía de Reino Unido a Estados Unidos de America

Cantidad disponible: Más de 20 disponibles

Añadir al carrito

Imagen de archivo

Christian Artigues
ISBN 10: 1848210345 ISBN 13: 9781848210349
Nuevo Tapa dura Original o primera edición

Librería: Grand Eagle Retail, Bensenville, IL, Estados Unidos de America

Calificación del vendedor: 5 de 5 estrellas Valoración 5 estrellas, Más información sobre las valoraciones de los vendedores

Hardcover. Condición: new. Hardcover. This title presents a large variety of models and algorithms dedicated to the resource-constrained project scheduling problem (RCPSP), which aims at scheduling at minimal duration a set of activities subject to precedence constraints and limited resource availabilities. In the first part, the standard variant of RCPSP is presented and analyzed as a combinatorial optimization problem. Constraint programming and integer linear programming formulations are given. Relaxations based on these formulations and also on related scheduling problems are presented. Exact methods and heuristics are surveyed. Computational experiments, aiming at providing an empirical insight on the difficulty of the problem, are provided. The second part of the book focuses on several other variants of the RCPSP and on their solution methods. Each variant takes account of real-life characteristics which are not considered in the standard version, such as possible interruptions of activities, production and consumption of resources, cost-based approaches and uncertainty considerations. The last part presents industrial case studies where the RCPSP plays a central part. Applications are presented in various domains such as assembly shop and rolling ingots production scheduling, project management in information technology companies and instruction scheduling for VLIW processor architectures. Resource-Constrained Project Scheduling presents a large variety of models and algorithms dedicated to the resource-constrained project scheduling problem (RCPSP), which aims at scheduling at minimal duration a set of activities subject to precedence constraints and limited resource availabilities. Shipping may be from multiple locations in the US or from the UK, depending on stock availability. Nº de ref. del artículo: 9781848210349

Contactar al vendedor

Comprar nuevo

EUR 184,28
Gastos de envío gratis
Se envía dentro de Estados Unidos de America

Cantidad disponible: 1 disponibles

Añadir al carrito

Imagen del vendedor

Artigues, Christian
Publicado por ISTE LTD, 2008
ISBN 10: 1848210345 ISBN 13: 9781848210349
Nuevo Tapa dura

Librería: moluna, Greven, Alemania

Calificación del vendedor: 4 de 5 estrellas Valoración 4 estrellas, Más información sobre las valoraciones de los vendedores

Gebunden. Condición: New. Resource-Constrained Project Scheduling presents a large variety of models and algorithms dedicated to the resource-constrained project scheduling problem (RCPSP), which aims at scheduling at minimal duration a set of activities subject to precedence const. Nº de ref. del artículo: 597090960

Contactar al vendedor

Comprar nuevo

EUR 191,11
EUR 48,99 shipping
Se envía de Alemania a Estados Unidos de America

Cantidad disponible: Más de 20 disponibles

Añadir al carrito

Imagen del vendedor

Artigues, Christian; Demassey, Sophie; Neron, Emmanuel
Publicado por Wiley-ISTE, 2008
ISBN 10: 1848210345 ISBN 13: 9781848210349
Nuevo Tapa dura

Librería: GreatBookPricesUK, Woodford Green, Reino Unido

Calificación del vendedor: 5 de 5 estrellas Valoración 5 estrellas, Más información sobre las valoraciones de los vendedores

Condición: New. Nº de ref. del artículo: 5510716-n

Contactar al vendedor

Comprar nuevo

EUR 201,00
EUR 17,08 shipping
Se envía de Reino Unido a Estados Unidos de America

Cantidad disponible: Más de 20 disponibles

Añadir al carrito

Imagen de archivo

Publicado por Wiley-ISTE, 2008
ISBN 10: 1848210345 ISBN 13: 9781848210349
Nuevo Tapa dura

Librería: Ubiquity Trade, Miami, FL, Estados Unidos de America

Calificación del vendedor: 4 de 5 estrellas Valoración 4 estrellas, Más información sobre las valoraciones de los vendedores

Condición: New. Brand new! Please provide a physical shipping address. Nº de ref. del artículo: 9781848210349

Contactar al vendedor

Comprar nuevo

EUR 208,06
EUR 2,56 shipping
Se envía dentro de Estados Unidos de America

Cantidad disponible: Más de 20 disponibles

Añadir al carrito

Imagen de archivo

Christian Artigues
ISBN 10: 1848210345 ISBN 13: 9781848210349
Nuevo Tapa dura Original o primera edición

Librería: AussieBookSeller, Truganina, VIC, Australia

Calificación del vendedor: 5 de 5 estrellas Valoración 5 estrellas, Más información sobre las valoraciones de los vendedores

Hardcover. Condición: new. Hardcover. This title presents a large variety of models and algorithms dedicated to the resource-constrained project scheduling problem (RCPSP), which aims at scheduling at minimal duration a set of activities subject to precedence constraints and limited resource availabilities. In the first part, the standard variant of RCPSP is presented and analyzed as a combinatorial optimization problem. Constraint programming and integer linear programming formulations are given. Relaxations based on these formulations and also on related scheduling problems are presented. Exact methods and heuristics are surveyed. Computational experiments, aiming at providing an empirical insight on the difficulty of the problem, are provided. The second part of the book focuses on several other variants of the RCPSP and on their solution methods. Each variant takes account of real-life characteristics which are not considered in the standard version, such as possible interruptions of activities, production and consumption of resources, cost-based approaches and uncertainty considerations. The last part presents industrial case studies where the RCPSP plays a central part. Applications are presented in various domains such as assembly shop and rolling ingots production scheduling, project management in information technology companies and instruction scheduling for VLIW processor architectures. Resource-Constrained Project Scheduling presents a large variety of models and algorithms dedicated to the resource-constrained project scheduling problem (RCPSP), which aims at scheduling at minimal duration a set of activities subject to precedence constraints and limited resource availabilities. Shipping may be from our Sydney, NSW warehouse or from our UK or US warehouse, depending on stock availability. Nº de ref. del artículo: 9781848210349

Contactar al vendedor

Comprar nuevo

EUR 293,35
EUR 31,52 shipping
Se envía de Australia a Estados Unidos de America

Cantidad disponible: 1 disponibles

Añadir al carrito