Real-Time Simulation and Production Scheduling Systems (Classic Reprint)
Idioma: inglés
Editorial: Forgotten Books, 2024
- Tapa blanda
- Nuevo

Librería: Forgotten Books, London, Reino UnidoForgotten Books
Vendedor de IberLibro desde 2 de junio de 2021
Condición: Nuevo
EUR 15,71
Cantidad disponible: Más de 20 disponibles
Añadir al carritoDescripción del artículo del vendedor
Print on Demand. This book explores the use of real-time simulations for more effective production scheduling in flexible manufacturing systems (FMS). The author, a leading expert in this field, argues that traditional scheduling techniques are inadequate for dealing with the unexpected delays and dynamic nature of FMS. The book presents a novel approach that utilizes concurrent simulations initialized to the current system state, allowing for real-time scheduling decisions. Detailed discussions on data requirements, statistical analysis, and optimization methods provide a comprehensive guide for implementing this approach in practice. The book's insights offer a significant contribution to the field of FMS scheduling, empowering manufacturers to optimize their production processes, reduce costs, and enhance overall efficiency. This book is a reproduction of an important historical work, digitally reconstructed using state-of-the-art technology to preserve the original format. In rare cases, an imperfection in the original, such as a blemish or missing page, may be replicated in the book.…
N° de ref. del artículo 9781527913783_0
- Título
- Real-Time Simulation and Production Scheduling Systems (Classic Reprint)
- Autor
- Wayne J. Davis, Albert T. Junes
- Editorial
- Forgotten Books
- Año de publicación
- 2024
- Estado
- New
- Tipo de libro
- print-on-demand item
- Encuadernación
- Paperback
- Idioma
- inglés
- ISBN 10
- 1527913783
- ISBN 13
- 9781527913783
- Catálogos de vendedores
- Statistics
Flexible Manufacturing Systems (fms) have been installed in numerous factories around the world. Production scheduling is the function responsible for assigning fms resources to various manufacturing tasks. Efficient use of these resources is critical to a company's goal of increased profits. In fact, poor scheduling decisions tend to reduce profits because they increase idle time on machines, cause bottlenecks on the shop floor, and push customer orders past their due date.
Mathematical programming approaches to solving the scheduling problem have received considerable attention in the literature. Graves [gra81] and Raman [ram85] have provided excellent surveys on these techniques. However, these techniques tend to have prohibitive computational requirements and restrictive assumptions. Another major drawback to these approaches is that they typically do not include material handling constraints. Discrete event simulation, expert systems, and other heuristics [mil86, nor86, jac86] are other methods used to generate schedules. While simulation and expert systems packages allow the manufacturing system to be modelled to any level of detail, they still have unacceptable computational requirements. In addition, all of these methods generate feasible solutions with no measure of optimality. These undesirable properties tend to limit the applicability of all these approaches in a real fms environment.
There are two other major drawbacks to all of the aforementioned approaches. First, they are all run off-line usually once or twice a day. Consequently, they are not able to respond quickly to unexpected events in the fms. These events are usually handled on an ad hoc basis by the fms supervisor with little understanding of the impact of his decisions on the overall schedule. Second, they do not take advantage of the vast amount of real-time shop floor data provided by fms computer systems.
Davis and Jones [dav88] have proposed an algorithm for real time production scheduling (see Figure l). The algorithm first selects R candidate scheduling alternatives and L performance indices to be used in evaluating those alternatives. Both selections based on actual shop floor data and are subject to continuous modification as the system evolves over time. Oh-line, concurrent, Monte Carlo simulations are run, in real - time, to evaluate the performance of these rules. This type of simulation analysis introduces four problems which typically are not addressed in the simulation literature.
About the Publisher
Forgotten Books publishes hundreds of thousands of rare and classic books. Find more at www.forgottenbooks.com
This book is a reproduction of an important historical work. Forgotten Books uses state-of-the-art technology to digitally reconstruct the work, preserving the original format whilst repairing imperfections present in the aged copy. In rare cases, an imperfection in the original, such as a blemish or missing page, may be replicated in our edition. We do, however, repair the vast majority of imperfections successfully; any imperfections that remain are intentionally left to preserve the state of such historical works.
“Sinopsis” puede pertenecer a otra edición de este título.
Reseña del editor
Flexible Manufacturing Systems (fms) have been installed in numerous factories around the world. Production scheduling is the function responsible for assigning fms resources to various manufacturing tasks. Efficient use of these resources is critical to a company's goal of increased profits. In fact, poor scheduling decisions tend to reduce profits because they increase idle time on machines, cause bottlenecks on the shop floor, and push customer orders past their due date.
Mathematical programming approaches to solving the scheduling problem have received considerable attention in the literature. Graves [gra81] and Raman [ram85] have provided excellent surveys on these techniques. However, these techniques tend to have prohibitive computational requirements and restrictive assumptions. Another major drawback to these approaches is that they typically do not include material handling constraints. Discrete event simulation, expert systems, and other heuristics [mil86, nor86, jac86] are other methods used to generate schedules. While simulation and expert systems packages allow the manufacturing system to be modelled to any level of detail, they still have unacceptable computational requirements. In addition, all of these methods generate feasible solutions with no measure of optimality. These undesirable properties tend to limit the applicability of all these approaches in a real fms environment.
There are two other major drawbacks to all of the aforementioned approaches. First, they are all run off-line usually once or twice a day. Consequently, they are not able to respond quickly to unexpected events in the fms. These events are usually handled on an ad hoc basis by the fms supervisor with little understanding of the impact of his decisions on the overall schedule. Second, they do not take advantage of the vast amount of real-time shop floor data provided by fms computer systems.
Davis and Jones [dav88] have proposed an algorithm for real time production scheduling (see Figure l). The algorithm first selects R candidate scheduling alternatives and L performance indices to be used in evaluating those alternatives. Both selections based on actual shop floor data and are subject to continuous modification as the system evolves over time. Oh-line, concurrent, Monte Carlo simulations are run, in real - time, to evaluate the performance of these rules. This type of simulation analysis introduces four problems which typically are not addressed in the simulation literature.
About the Publisher
Forgotten Books publishes hundreds of thousands of rare and classic books. Find more at www.forgottenbooks.com
This book is a reproduction of an important historical work. Forgotten Books uses state-of-the-art technology to digitally reconstruct the work, preserving the original format whilst repairing imperfections present in the aged copy. In rare cases, an imperfection in the original, such as a blemish or missing page, may be replicated in our edition. We do, however, repair the vast majority of imperfections successfully; any imperfections that remain are intentionally left to preserve the state of such historical works.
“Acerca de” puede pertenecer a otra edición de este título.
Forgotten Books
London, Reino Unido
Vendedor de IberLibro desde 2 de junio de 2021
Tarifas de envío de Reino Unido a Estados Unidos de America
| Artículo | De 5 a 10 días hábiles | De 5 a 10 días hábiles |
|---|---|---|
| Primer artículo | EUR 0,00 | EUR 0,00 |
Métodos de pago
Descripción de la tienda
Forgotten Books’ Classic Reprint Series utilizes the latest technology to regenerate facsimiles of historically important writings. Careful attention has been made to accurately preserve the original format of each page whilst digitally enhancing the quality of the aged text.
Especialidad
TradeInformación empresarial del vendedor
FB &c Ltd
Dalton House, 60 Windsor Avenue
London, Reino Unido SW19 2RR
Condiciones de venta
Forgotten Books publica cientos de miles de libros raros y clásicos.
Este libro es una reproducción de una importante obra histórica. Forgotten Books utiliza tecnología de punta para reconstruir digitalmente la obra, preservando el formato original mientras repara las imperfecciones presentes en la copia envejecida. En casos raros, una imperfección en el original, como una imperfección o una página faltante, puede replicarse en nuestra edición. Sin embargo, reparamos con éxito la gran mayoría de las imperfecciones; cualquier imperfección que permanezca se deja intencionalmente para preservar el estado de tales obras históricas.
Este texto se ha restaurado digitalmente a partir de una edición histórica. Algunos errores pueden persistir, sin embargo, consideramos que vale la pena publicarlo debido al valor histórico de la obra.
La edición digital de todos los libros se puede ver en nuestro sitio web antes de la compra.
Derecho al desistimiento
Si es un consumidor, puede rescindir el contrato de acuerdo con lo siguiente. Por consumidor se entiende cualquier persona física que actúe con fines ajenos a su actividad comercial, empresarial, oficio o profesión.
Información sobre el derecho de desistimiento
Derecho legal de desistimiento
Tiene derecho a rescindir este contrato en un plazo de 14 días sin dar ningún motivo.
El periodo de desistimiento vencerá a los 14 días desde que usted, o un tercero que no sea el transportista e indicado por usted, adquiera la posesión física del último bien o del último lote o pieza.
Para ejercer el derecho de desistimiento, complete de forma electrónica y envíe una declaración clara en nuestro sitio web, desde "Mis compras" en "Mi cuenta". Le enviaremos sin demora un acuse de recibo de dicho desistimiento a través de un soporte duradero (por ejemplo, por correo electrónico).
Para cumplir con el plazo de desistimiento, basta con que envíe su comunicación relativa al ejercicio del derecho de desistimiento antes de que venza el periodo de desistimiento.
Efectos del desistimiento
Si rescinde este contrato, le reembolsaremos todos los pagos que hayamos recibido de usted, incluidos los gastos de envío (excepto los gastos adicionales que surjan si elige un tipo de envío que no sea el tipo de envío estándar más económico que ofrecemos).
Podemos hacer una deducción del reembolso por la pérdida de valor de cualquier bien suministrado, si la pérdida es el resultado de una manipulación innecesaria por su parte.
Efectuaremos el reembolso sin demoras indebidas y, a más tardar, 14 días después de que se nos informe de su decisión de rescindir este contrato.
Efectuaremos el reembolso utilizando el mismo medio de pago que utilizó para la transacción inicial, a menos que haya acordado expresamente lo contrario; en cualquier caso, no incurrirá en ningún cargo como resultado de dicho reembolso.
Podremos retener el reembolso hasta que hayamos recibido los bienes o hasta que nos haya presentado una prueba de que los ha devuelto, lo que ocurra primero.
Deberá devolver los bienes o entregarlos a Forgotten Books, London, United Kingdom, sin demoras indebidas y, en cualquier caso, en un plazo máximo de 14 días a partir del día en que nos comunique su desistimiento del presente contrato. El plazo se cumple si devuelve la mercancía antes de que venza el periodo de 14 días. Tendrá que asumir los gastos directos de devolución de los bienes. Usted solo es responsable de la disminución del valor de los bienes como resultado de una manipulación distinta a la necesaria para establecer la naturaleza, las características y el funcionamiento de los bienes.
Excepciones al derecho de desistimiento
El derecho de desistimiento no se aplica a lo siguiente:
- La entrega de periódicos, diarios o revistas, con la excepción de los contratos de suscripción; y
- El suministro de contenido digital que no se proporcione en un soporte tangible (por ejemplo, en un CD o DVD) si, al hacer el pedido, aceptó que podíamos empezar a entregarlo y que no podría desistir una vez iniciada la entrega.
Condiciones de envío
Ci impegniamo a ridurre al minimo il nostro impatto ambientale e a diminuire i costi di spedizione producendo e spedendo i nostri prodotti il più vicino possibile ai nostri clienti. Per gli ordini negli Stati Uniti, gli articoli vengono spediti dagli USA. Gli ordini per il Regno Unito e l’Europa vengono evasi dal Regno Unito. Gli ordini canadesi possono essere spediti dal Canada o dagli Stati Uniti, a seconda delle dimensioni dell’ordine.
Per i nostri clienti in altre regioni del mondo, ci assicuriamo che gli ordini vengano spediti dalla località più vicina disponibile per ridurre i tempi di consegna e l’impronta di carbonio. Il nostro obiettivo è consegnare i tuoi prodotti in modo efficiente, ovunque tu sia.
Ti preghiamo di notare che, in base alla dimensione dell’ordine e alla legislazione locale del tuo paese, potrebbero essere applicate tasse, dazi doganali e spese aggiuntive dal paese di destinazione. Questi costi non sono inclusi nel prezzo dell’articolo o nelle spese di spedizione. Sono a carico del cliente e devono essere pagati alla consegna.
Ti consigliamo di verificare con il tuo ufficio doganale locale per maggiori informazioni su eventuali costi prima di effettuare l’ordine. Forgotten Books non è responsabile per eventuali dazi doganali, tasse o spese sostenute.