Practice and Innovation of the Ling Ao Nuclear Power Engineering: civil construction volume device installation volume(Chinese Edition)
Idioma: chino
Editorial: Atomic energy, 2000
- Tapa dura
- Nuevo

Librería: liu xing, Nanjing, JS, Chinaliu xing
Vendedor de AbeBooks desde 7 de abril de 2009
Condición: Nuevo
EUR 173,10
- Giro bancario
- PayPal
Cantidad disponible: 1 disponibles
Añadir al carritoDescripción del artículo del vendedor
Ship out in 2 business day, And Fast shipping, Free Tracking number will be provided after the shipment.HardCover Pub Date: 2003 07 Pages: 654 Language: Chinese in Publisher: Atomic Energy Press Ling Ao Nuclear Power Engineering Practice and Innovation: civil construction volume equipment installation volume is divided into six parts: the nuclear island and civil construction of power plant ancillary facilities Conventional Island civil construction and power station auxiliary facilities. marine civil works construction. equipment installation of the nuclear island. conventional island equipment installation. power plants and supporting facilities and equipment installation. Contents: civil construction volume Preface 1 nuclear island and civil construction of power plant ancillary facilities look through the comparison and analysis of the civil construction of the Ling Ao Nuclear Power independent of management practice civil construction of the Ling Ao Nuclear Power management autonomy in decision-making processes in civil engineering program management civil engineering quality management nuclear Island and supporting facilities of the nuclear island late civil works construction and installation coordination and management of civil construction non-conformities statistical analysis of the nuclear island stainless steel lining external quality control engineering quality common problem of civil faced concrete nuclear island raft foundation concrete crack control nuclear island reinforced concrete analysis Lining civil engineering materials of carbon steel part of the end of the analysis of the construction of the nuclear island construction ride hanging group layout selection and safety management the ring hanging the corbel welding and heat treatment after the nuclear island plant caulking protection frustum fillet weld ultrasound localization explore the shielding concrete conventional island and civil construction of the power plant ancillary facilities of the conventional island of the technical management of the civil works nonconformance management and corrective (preventive) measures Conventional Island civil engineering planning and duration control items procurement control and localization work 950MW steam the 1st turbine generator turbine generator base construction base does not meet the entry processing and No.2 Generator base construction turbine generator bolt casing pressure grouting reinforced concrete frame structure of the main plant construction on the 2nd main plant main steel erection of artificial digging pile construction circulating water culverts template design and construction of the main plant main plant anti whip girder lifting the the conventional island ventilation and air conditioning engineering construction rock foundation excavation of controlled blasting of the younger age of concrete without destroying the circulating water culvert concrete cracks control pumping station (PX) flared. template installation and dismantling pump volute influent channel the preparation of three-dimensional reinforced concrete crack control technology engineering civil construction in marine projects aqueduct structure breakwater twist 3 sea king word block prefabricated and placed in septal embankment Ground Wall construction experience installation Preface 1 nuclear island equipment installation conventional island equipment installation 3 power plant ancillary facilities and equipment installedFour Satisfaction guaranteed,or money back.…
N° de ref. del artículo NE001778
Detalles bibliográficos
- Título
- Practice and Innovation of the Ling Ao Nuclear Power Engineering: civil construction volume device installation volume(Chinese Edition)
- Autor
- CONG SHU MING : CHU BAN SHE : YUAN ZI NENG CHU BAN SHE : 9787502227227 CHU BAN SHI JIAN : 20030701 BAN CI : 1 YE SHU : 654 ZHUANG ZHEN : JING ZHUANG KAI BEN : 16 KAI SUO S
- Editorial
- Atomic energy
- Año de publicación
- 2000
- Estado
- New
- Encuadernación
- Hardcover
- Idioma
- chino
- ISBN 10
- 7502227229
- ISBN 13
- 9787502227227
liu xing
Nanjing, JS, China
Vendedor de AbeBooks desde 7 de abril de 2009
Tarifas de envío de China a Estados Unidos de America
| Artículo | De 16 a 30 días hábiles | De 8 a 16 días hábiles |
|---|---|---|
| Primer artículo | EUR 15,48 | EUR 25,80 |
Descripción de la tienda
Thank you for visiting My bookstore! We are an online bookstore, and Is the China's largest online book sales. Generally our books are from China, with reasonable price and decent printing quality. We are always trying our best to satisfy customer's needs!
Especialidad
Chemistry, Mathematics, Computer, Physics, Environment, Social SciencesInformación empresarial del vendedor
NAN JING SHI JIANG NING QU NING YUAN DIAN ZI SHANG WU ZHONG XIN
Room 264, Oujiang Shopping Center, No. 1 Dongxin South Road, Dongshan Street, Jiangning District, NanJing
Nanjing, JS China 211100
Condiciones de venta
We guarantee the condition of every book as it's described on the Abebooks web sites. If you're dissatisfied with your purchase (Incorrect Book/Not as Described/Damaged) or if the order hasn't arrived, you're eligible for a refund within 30 days of the estimated delivery date. If you've changed your mind about a book that you've ordered, please use the Ask bookseller a question link to contact us and we'll respond within 2 business days. Please Note:We don't sell any international Edition to you. Don't send any question about international Edition to us.
Derecho al desistimiento
Si es un consumidor, puede rescindir el contrato de acuerdo con lo siguiente. Por consumidor se entiende cualquier persona física que actúe con fines ajenos a su actividad comercial, empresarial, oficio o profesión.
Información sobre el derecho de desistimiento
Derecho legal de desistimiento
Tiene derecho a rescindir este contrato en un plazo de 14 días sin dar ningún motivo.
El periodo de desistimiento vencerá a los 14 días desde que usted, o un tercero que no sea el transportista e indicado por usted, adquiera la posesión física del último bien o del último lote o pieza.
Para ejercer el derecho de desistimiento, complete de forma electrónica y envíe una declaración clara en nuestro sitio web, desde "Mis compras" en "Mi cuenta". Le enviaremos sin demora un acuse de recibo de dicho desistimiento a través de un soporte duradero (por ejemplo, por correo electrónico).
Para cumplir con el plazo de desistimiento, basta con que envíe su comunicación relativa al ejercicio del derecho de desistimiento antes de que venza el periodo de desistimiento.
Efectos del desistimiento
Si rescinde este contrato, le reembolsaremos todos los pagos que hayamos recibido de usted, incluidos los gastos de envío (excepto los gastos adicionales que surjan si elige un tipo de envío que no sea el tipo de envío estándar más económico que ofrecemos).
Podemos hacer una deducción del reembolso por la pérdida de valor de cualquier bien suministrado, si la pérdida es el resultado de una manipulación innecesaria por su parte.
Efectuaremos el reembolso sin demoras indebidas y, a más tardar, 14 días después de que se nos informe de su decisión de rescindir este contrato.
Efectuaremos el reembolso utilizando el mismo medio de pago que utilizó para la transacción inicial, a menos que haya acordado expresamente lo contrario; en cualquier caso, no incurrirá en ningún cargo como resultado de dicho reembolso.
Podremos retener el reembolso hasta que hayamos recibido los bienes o hasta que nos haya presentado una prueba de que los ha devuelto, lo que ocurra primero.
Deberá devolver los bienes o entregarlos a liu xing, Nanjing, JS, China, sin demoras indebidas y, en cualquier caso, en un plazo máximo de 14 días a partir del día en que nos comunique su desistimiento del presente contrato. El plazo se cumple si devuelve la mercancía antes de que venza el periodo de 14 días. Tendrá que asumir los gastos directos de devolución de los bienes. Usted solo es responsable de la disminución del valor de los bienes como resultado de una manipulación distinta a la necesaria para establecer la naturaleza, las características y el funcionamiento de los bienes.
Excepciones al derecho de desistimiento
El derecho de desistimiento no se aplica a lo siguiente:
- La entrega de periódicos, diarios o revistas, con la excepción de los contratos de suscripción; y
- El suministro de contenido digital que no se proporcione en un soporte tangible (por ejemplo, en un CD o DVD) si, al hacer el pedido, aceptó que podíamos empezar a entregarlo y que no podría desistir una vez iniciada la entrega.
Condiciones de envío
Most orders are shipped within 24 hours. We will delivery these items to you by SAL, EUB, EMS, FEDEX etc.