Post-Project Monitoring of BMP's/SUDS to Determine Performance and Whole-Life Costs

Idioma: inglés

Editorial: IWA Publishing, GB, 2004

1843397161 / 9781843397168

  • Tapa blanda
  • Nuevo
Ver todos los detalles

Librería: Rarewaves.com UK, London, Reino UnidoRarewaves.com UK

Vendedor de 5 estrellas

Vendedor de AbeBooks desde 11 de junio de 2025

Ver los artículos de este vendedor
Tapa blanda

Condición: Nuevo

EUR 188,95

Envío por EUR 75,80 
Se envía de Reino Unido a Estados Unidos de America

Cantidad disponible: 5 disponibles

Añadir al carrito

Descripción del artículo del vendedor

Over the past 20 years, the use of Best Management Practices (BMPs) in the United States has been instrumental in reducing both the detrimental impacts to receiving water quality and the exacerbated flooding caused by urbanization and storm water drainage. More recently, Sustainable Urban Drainage Systems (SUDS) have started to be used in the United Kingdom. Both SUDS and BMPs attempt to mimic the drainage patterns of the natural watershed, and can also provide a degree of treatment needed to improve the quality of the water discharged to an acceptable level. The costs of conventional stormwater collection systems are determined primarily in terms of initial capital expenditure. Long-term maintenance costs are absorbed by stormwater authorities that are responsible for maintaining their infrastructure as part of their "asset base". Currently, only a few of these responsibilities exist for BMPs and SUDS, which generally incorporate surface components and are often dependent on landscaping rather than on traditional construction techniques, but may require significant regular maintenance. Any potential adopting organization will require guidance on the maintenance regimes of different types of systems and how such regimes translate into long-term adoption costs. The project is being conducted in two phases. Phase 1, which is the subject of this report, includes a literature review and a survey of stormwater authorities and organizations in the US and UK to identify the most commonly used BMPs and SUDS and to determine the availability of data on their cost and performance. As part of Phase 2, the operation of selected BMPs and SUDS will be monitored over a one-year period in terms of pollutant removal and hydrologic/hydraulic efficiency, and applicability of their design criteria and maintenance regime. The protocols developed in Phase 1 will be used to assess BMPs/SUDS performance and whole-life costs.

N° de ref. del artículo LU-9781843397168

Título
Post-Project Monitoring of BMP's/SUDS to Determine Performance and Whole-Life Costs
Autor
L. K. Lampe
Editorial
IWA Publishing, GB
Año de publicación
2004
Estado
New
Encuadernación
Paperback
Idioma
inglés
ISBN 10
1843397161
ISBN 13
9781843397168

Rarewaves.com UK

London, Reino Unido

Vendedor de 5 estrellas

Vendedor de AbeBooks desde 11 de junio de 2025

Tarifas de envío de Reino Unido a Estados Unidos de America

ArtículoDe 60 a 60 días hábilesDe 60 a 60 días hábiles
Primer artículoEUR 75,80EUR 116,61
Los plazos de entrega los establecen los vendedores y varían según el transportista y la ubicación. Los pedidos que pasan por la aduana pueden sufrir retrasos y los compradores son responsables de los aranceles o tarifas asociadas. Los vendedores pueden ponerse en contacto con usted en relación con cargos adicionales para cubrir cualquier aumento en los costes de envío de los artículos.

Métodos de pago

  • Visa
  • Mastercard
  • American Express
  • Carte Bleue
  • Apple Pay
  • Google Pay

Información empresarial del vendedor

RAREWAVES.COM LIMITED

Elsley Court, 20-22 Great Titchfield Street
London, Reino Unido W1W 8BE