Nuclear power plant steam power conversion systems (PWR nuclear power plant operators staff training series teaching basic theory)
Idioma: inglés
Editorial: Atomic Energy Pub. Date :2010-12-01 version 1, 2000
- Tapa blanda
- Nuevo

Librería: liu xing, Nanjing, JS, Chinaliu xing
Vendedor de IberLibro desde 7 de abril de 2009
Condición: Nuevo
EUR 261,49
Cantidad disponible: 10 disponibles
Añadir al carritoDescripción del artículo del vendedor
Ship out in 2 business day, And Fast shipping, Free Tracking number will be provided after the shipment.Pages Number: 248 Publisher: Atomic Energy Pub. Date :2010-12-01 version 1. ZANG years edited the nuclear power plant steam power conversion system. explained pressurized water reactor nuclear power plant steam power conversion system works. the basic composition and design features. The book is divided into six chapters. covering the basics of engineering thermodynamics. nuclear power plant steam cycle thermal power plant. steam turbine working principle. the basic structure and characteristics of the nuclear steam turbine. two important power plant auxiliary equipment - condenser and deaerator devices. two-loop pressurized water reactor nuclear power plant thermal system. the basic concepts turbine operation. This book is also proposed and under construction on the second generation of domestic nuclear power plants plus secondary loop technology improvements are introduced. Nuclear power plant steam power conversion system is a pressurized water reactor nuclear power plant operators based theoretical training staff is one series of textbooks. but also for nuclear power engineering in the relevant technical staff and higher education nuclear power engineering and energy professionals and students for reference. Contents: Chapter 1. the basics of Engineering Thermodynamics 1.1 Basic Concepts 1.1.1 working fluid and thermodynamic parameters of the system 1.1.2 1.1.3 thermodynamic equilibrium state. equation of state parameter plot 1.1.4 The quasi-static process. reversible process 1.1.5 1.1.6 power heat. entropy thermodynamic cycle 1.2 1.1.7 1.2.1 Thermodynamic first law of thermodynamics the total stored energy to 1.2.2 1.2.3 1.2.4 closed system to promote the power and the energy equation enthalpy 1.2 1.2.5 steady flow energy equation steady flow energy equation .6 1.3 applications and ideal gas thermodynamic properties of the nature of the process 1.3.1 1.3.2 ideal gas ideal gas heat capacity ideal gas than 1.3.3 with the thermodynamic calculation than the enthalpy of an ideal gas than 1.3.4 1.3.5 Analysis of entropy calculation thermodynamic process and the general method 1.3.6 The purpose of the four typical ideal gas thermodynamic process analysis of the changing process of ideal gas 1.3.7 1.4 1.4.1 The second law of thermodynamics the irreversibility of natural processes 1.4 .2 second law of thermodynamics in real terms 1.4.3 Carnot cycle. Carnot Theorem 1.4.4 Clausius inequality and entropy of an isolated system. entropy principle 1.4.5 1.4.6 Thermal energy availability and the depreciation of 1.5 saturated steam 1.5.1 1.5.2 Water temperature and saturation pressure of the constant pressure heat of vaporization of water and steam process 1.5.3 1.5.4 state parameters skeleton thermodynamic properties of water and steam tables. steam tables and Figure 1.5.5 1.6 steam heat process gas and steam 1.6.1 One-dimensional steady flow of basic equations of flow velocity changes in the conditions of 1.6.2 for 1.6.3 1.6.4 isentropic stagnation parameters of the adiabatic flow with friction adiabatic throttling 1.6.5 Review Questions Chapter 2 of the steam power plant ideal cycle thermal cycle 2.1 2.1.1 2.1.2 Carnot cycle Rankine cycle 2.2 of the actual cycle of the actual cycle analysis 2.2.1 2.2.2 actual loop 2.2.3 irreversible process of economic indicators of nuclear power plant heat 2.2.4 steam parameters on the cycle thermal efficiency of heat recovery cycle 2.3 2.3.1 Overview 2.3.2 back to thermal cycling of thermal economy back to 2.3.3 the best the best water temperature thermal distribution 2.3.4 2.4 2.4.1 reheat cycle nuclear steam reheat turbine reheat cycle 2.4.2 The purpose of the thermal efficiency of steam consumption rate and heat rate and its impact on Review Questions Chapter 3 turbine and steam turbine auxiliary systems 3.1 Overview 3.1.1 The role and composition of the turbine-generator unit 3.1.2 Classificati.…
N° de ref. del artículo LJ1927
Detalles bibliográficos
- Título
- Nuclear power plant steam power conversion systems (PWR nuclear power plant operators staff training series teaching basic theory)
- Autor
- ZANG XI NIAN
- Editorial
- Atomic Energy Pub. Date :2010-12-01 version 1
- Año de publicación
- 2000
- Estado
- New
- Encuadernación
- paperback
- Idioma
- inglés
- ISBN 10
- 7502247645
- ISBN 13
- 9787502247645
liu xing
Nanjing, JS, China
Vendedor de IberLibro desde 7 de abril de 2009
Tarifas de envío de China a Estados Unidos de America
| Artículo | De 16 a 30 días hábiles | De 8 a 16 días hábiles |
|---|---|---|
| Primer artículo | EUR 16,15 | EUR 26,91 |
Métodos de pago
- Giro bancario
- PayPal
Descripción de la tienda
Thank you for visiting My bookstore! We are an online bookstore, and Is the China's largest online book sales. Generally our books are from China, with reasonable price and decent printing quality. We are always trying our best to satisfy customer's needs!
Especialidad
Chemistry, Mathematics, Computer, Physics, Environment, Social SciencesInformación empresarial del vendedor
ANJINGYU LIMITED
No.99 King Fuk ST, RM D07, 8/F KAI TAK FTY BLDG
San Po Kong, Hong Kong
Condiciones de venta
We guarantee the condition of every book as it's described on the Abebooks web sites. If you're dissatisfied with your purchase (Incorrect Book/Not as Described/Damaged) or if the order hasn't arrived, you're eligible for a refund within 30 days of the estimated delivery date. If you've changed your mind about a book that you've ordered, please use the Ask bookseller a question link to contact us and we'll respond within 2 business days. Please Note:We don't sell any international Edition to you. Don't send any question about international Edition to us.
Derecho al desistimiento
Si es un consumidor, puede rescindir el contrato de acuerdo con lo siguiente. Por consumidor se entiende cualquier persona física que actúe con fines ajenos a su actividad comercial, empresarial, oficio o profesión.
Información sobre el derecho de desistimiento
Derecho legal de desistimiento
Tiene derecho a rescindir este contrato en un plazo de 14 días sin dar ningún motivo.
El periodo de desistimiento vencerá a los 14 días desde que usted, o un tercero que no sea el transportista e indicado por usted, adquiera la posesión física del último bien o del último lote o pieza.
Para ejercer el derecho de desistimiento, complete de forma electrónica y envíe una declaración clara en nuestro sitio web, desde "Mis compras" en "Mi cuenta". Le enviaremos sin demora un acuse de recibo de dicho desistimiento a través de un soporte duradero (por ejemplo, por correo electrónico).
Para cumplir con el plazo de desistimiento, basta con que envíe su comunicación relativa al ejercicio del derecho de desistimiento antes de que venza el periodo de desistimiento.
Efectos del desistimiento
Si rescinde este contrato, le reembolsaremos todos los pagos que hayamos recibido de usted, incluidos los gastos de envío (excepto los gastos adicionales que surjan si elige un tipo de envío que no sea el tipo de envío estándar más económico que ofrecemos).
Podemos hacer una deducción del reembolso por la pérdida de valor de cualquier bien suministrado, si la pérdida es el resultado de una manipulación innecesaria por su parte.
Efectuaremos el reembolso sin demoras indebidas y, a más tardar, 14 días después de que se nos informe de su decisión de rescindir este contrato.
Efectuaremos el reembolso utilizando el mismo medio de pago que utilizó para la transacción inicial, a menos que haya acordado expresamente lo contrario; en cualquier caso, no incurrirá en ningún cargo como resultado de dicho reembolso.
Podremos retener el reembolso hasta que hayamos recibido los bienes o hasta que nos haya presentado una prueba de que los ha devuelto, lo que ocurra primero.
Deberá devolver los bienes o entregarlos a liu xing, Nanjing, JS, China, sin demoras indebidas y, en cualquier caso, en un plazo máximo de 14 días a partir del día en que nos comunique su desistimiento del presente contrato. El plazo se cumple si devuelve la mercancía antes de que venza el periodo de 14 días. Tendrá que asumir los gastos directos de devolución de los bienes. Usted solo es responsable de la disminución del valor de los bienes como resultado de una manipulación distinta a la necesaria para establecer la naturaleza, las características y el funcionamiento de los bienes.
Excepciones al derecho de desistimiento
El derecho de desistimiento no se aplica a lo siguiente:
- La entrega de periódicos, diarios o revistas, con la excepción de los contratos de suscripción; y
- El suministro de contenido digital que no se proporcione en un soporte tangible (por ejemplo, en un CD o DVD) si, al hacer el pedido, aceptó que podíamos empezar a entregarlo y que no podría desistir una vez iniciada la entrega.
Condiciones de envío
Most orders are shipped within 24 hours. We will delivery these items to you by SAL, EUB, EMS, FEDEX etc.