Monitoring Compliance with the Comprehensive Nuclear-Test-Ban Treaty (CTBT): Contributions by the German National Data Center (Geologisches Jahrbuch / Reihe B / Regionale Geologie Ausland und angewandte Geowissenschaften - Geological Yearbook / Series B / Regional Geology and Applied Geosciences)
Idioma: inglés
Editorial: Schweizerbart Sche Vlgsb., 2017
- Tapa dura
- Usado

Librería: killarneybooks, Inagh, Clare, Irlandakillarneybooks
Vendedor de IberLibro desde 20 de abril de 2017
Condición: Usado - Bueno
EUR 29,50
Cantidad disponible: 1 disponible
Añadir al carritoDescripción del artículo del vendedor
Heavy hardcover, 325 pages, NOT ex-library. VG, clean and bright throughout. Issued without a dust jacket. Contents: Overview & Role of Germany in the Verification Regime: - 1 CTBT Verification & its Implementation in Germany [Verification regime; Seismological monitoring of nuclear explosions in Germany before the CTBT; Implementation & Verification; Main CTBT actors of the German Federal Government; Others] 2 German Contributions to the International Monitoring System IMS [Station Operation & maintenance; Primary & Auxiliary seismic monitoring Station PS19 & AS035; Infrasound array IS26 & IS27; Radionuclide monitoring Station RN33]; - Verification Technologies of the IMS: - 3 Seismic Network of the IMS [IMS seismic network stations; Global seismicity & nuclear explosion tests; Event discrimination & magnitude-yield relationships; Detection capability of the seismic network: methodology & results; Comparison of the detection capability against REB events] 4 Infrasound Network of the IMS [Infrasound: an overview; Infrasound activity in Central/Northern Europe & from Mt Etna volcano; IMS global network performance] 5 Hydroacoustic Network of the IMS [Hydroacoustic stations & technology & propagation & monitoring: examples of natural & anthropogenic Signals; Worldwide location of hydroacoustic events] 6 IMS Radionuclide Network Supported by Atmospheric Transport Modelling ATM [Anthropogenic fission products in the atmosphere; ATM]; - Verification Test Cases for the IMS: - 7 Verification of the North Korean Nuclear Explosions 2006, 2009, 2013, 2016 [Seismic event localization; Source Identification; Yield estimation; Moment tensor Inversion; Radionuclide evidence; New & future System developments for CTBT] 8 National Data Center Preparedness Exercises NPE for an Independent Performance Assessment [First ideas realized in NPE2007 & NPE2008; NPE2009: introducing data fusion; Complex multi-technology scenario for NPE2010; Straight non-compliance in NPE2012; NPE2013; NPE2015] 9 Tohoku Earthquake with Tsunami and the Fukushima Releases as Performance Test for the IMS [Tohoku earthquake of March 11, 2011; ATM simulating the Fukushima radionuclide plume arrival at IMS stations across the globe; Backward modelling: finding Fukushima; Potential blinding of the IMS] 10 Chelyabinsk: Benchmark for Global Infrasound Detections [Chelyabinsk: event description and source characteristics; Detections and non-detections by the global IMS network; Infrasound propagation modelling; Discussion of Parameters influencing detection capability; Seismoacoustic fingerprint of the fireball across Central and Northern Europe]; - International Data Center IDC, National Technical Means and On-site Inspection: - 11 Some Considerations on the Quality of IDC Standard Waveform Products [Quality control work on the IDC Reviewed Event Bulletin; Impact of Interactive analysis on bulletin quality at the IDC in 2007] 12 Remote Sensing Data in Support of CTBT Monitoring: Case Studies of Underground Nuclear Explosions [DlnSAR Processing of ERS data over NTS; Co- & Post-seismic deformation; Wide-area change-detection: Case study of Nevada Test Site Underground nuclear explosions using conventional multispectral satellite data; Comparison of differential SAR interferometry and wide-area change-detection results; Study of the nuclear test in North Korea of October 9, 2006] 13 Role of On-Site Inspections OSI of the CTBT [Regulations & provisions from the Treaty; Decision about the conduct of an OSI; Possible scenarios for an OSI request; Role of NTM in case of an OSI; OSI technologies; OSI search logic & management Systems; Results of an OSI; Integrated Field Exercises 2008 and 2014; Training and nomination of inspectors] 14 Seismic Aftershock Monitoring System SAMS for OSI of the CTBT [Physical background; Role of SAMS in case of an OSI; Method of Nanoseismic Monitoring; SAMS at the IFE14; Detection threshold estimation of SAMS networks].…
N° de ref. del artículo 005309
Detalles bibliográficos
- Título
- Monitoring Compliance with the Comprehensive Nuclear-Test-Ban Treaty (CTBT): Contributions by the German National Data Center (Geologisches Jahrbuch / Reihe B / Regionale Geologie Ausland und angewandte Geowissenschaften - Geological Yearbook / Series B / Regional Geology and Applied Geosciences)
- Autor
- Christoph Pilger; Lars Ceranna; Christian Bönnemann
- Editorial
- Schweizerbart Sche Vlgsb.
- Año de publicación
- 2017
- Estado
- Very Good
- Encuadernación
- Hardcover
- Idioma
- inglés
- ISBN 10
- 3510968581
- ISBN 13
- 9783510968589
killarneybooks
Inagh, Clare, Irlanda
Vendedor de IberLibro desde 20 de abril de 2017
Tarifas de envío de Irlanda a Estados Unidos de America
| Artículo | De 5 a 7 días hábiles | De 2 a 4 días hábiles |
|---|---|---|
| Primer artículo | EUR 34,84 | EUR 38,00 |
Métodos de pago
- Giro bancario
- PayPal
Descripción de la tienda
All U.S.-bound orders are now shipped with UPS for reliable delivery. Additional customs or import fees are highly unlikely; however, please note buyers remain responsible for any duties or taxes that U.S. Customs may assess. -- Killarneybooks is a family-run bookshop based in the Republic of Ireland. We take pride in accurate listings, careful packaging, and prompt service - most orders ship within 24 hours. All books listed are in stock and ready for immediate dispatch - we are not dropshippers. Inquiries always welcome.…
Especialidad
professional, academic, non-fictionInformación empresarial del vendedor
killarneybooks
Irlanda
Business Name: killarneybooks
Business Type: Sole Trader
Trade Register Number: 1976607T (not VAT-registered)
Business Address: Ballynoe, Inagh, Co. Clare
Customer Service representative: Ada Boosey
Phone: 0353 857512674
Email: killarneybookseu@yahoo.com
Derecho al desistimiento
Si es un consumidor, puede rescindir el contrato de acuerdo con lo siguiente. Por consumidor se entiende cualquier persona física que actúe con fines ajenos a su actividad comercial, empresarial, oficio o profesión.
Información sobre el derecho de desistimiento
Derecho legal de desistimiento
Tiene derecho a rescindir este contrato en un plazo de 14 días sin dar ningún motivo.
El periodo de desistimiento vencerá a los 14 días desde que usted, o un tercero que no sea el transportista e indicado por usted, adquiera la posesión física del último bien o del último lote o pieza.
Para ejercer el derecho de desistimiento, complete de forma electrónica y envíe una declaración clara en nuestro sitio web, desde "Mis compras" en "Mi cuenta". Le enviaremos sin demora un acuse de recibo de dicho desistimiento a través de un soporte duradero (por ejemplo, por correo electrónico).
Para cumplir con el plazo de desistimiento, basta con que envíe su comunicación relativa al ejercicio del derecho de desistimiento antes de que venza el periodo de desistimiento.
Efectos del desistimiento
Si rescinde este contrato, le reembolsaremos todos los pagos que hayamos recibido de usted, incluidos los gastos de envío (excepto los gastos adicionales que surjan si elige un tipo de envío que no sea el tipo de envío estándar más económico que ofrecemos).
Podemos hacer una deducción del reembolso por la pérdida de valor de cualquier bien suministrado, si la pérdida es el resultado de una manipulación innecesaria por su parte.
Efectuaremos el reembolso sin demoras indebidas y, a más tardar, 14 días después de que se nos informe de su decisión de rescindir este contrato.
Efectuaremos el reembolso utilizando el mismo medio de pago que utilizó para la transacción inicial, a menos que haya acordado expresamente lo contrario; en cualquier caso, no incurrirá en ningún cargo como resultado de dicho reembolso.
Podremos retener el reembolso hasta que hayamos recibido los bienes o hasta que nos haya presentado una prueba de que los ha devuelto, lo que ocurra primero.
Deberá devolver los bienes o entregarlos a killarneybooks, Inagh, Clare, Ireland, sin demoras indebidas y, en cualquier caso, en un plazo máximo de 14 días a partir del día en que nos comunique su desistimiento del presente contrato. El plazo se cumple si devuelve la mercancía antes de que venza el periodo de 14 días. Tendrá que asumir los gastos directos de devolución de los bienes. Usted solo es responsable de la disminución del valor de los bienes como resultado de una manipulación distinta a la necesaria para establecer la naturaleza, las características y el funcionamiento de los bienes.
Excepciones al derecho de desistimiento
El derecho de desistimiento no se aplica a lo siguiente:
- La entrega de periódicos, diarios o revistas, con la excepción de los contratos de suscripción; y
- El suministro de contenido digital que no se proporcione en un soporte tangible (por ejemplo, en un CD o DVD) si, al hacer el pedido, aceptó que podíamos empezar a entregarlo y que no podría desistir una vez iniciada la entrega.
Condiciones de envío
TNT / FedEX express available on request. Please contact us for more details. Thank you.
Privacidad y seguridad
We value the privacy of your personal data, the protection of which is of the utmost importance to us. We comply with statutory provisions for data protection and treat all Customers-related information confidentially.