Learning from the textbook: large boiler operation(Chinese Edition)

Idioma: chino

Editorial: China Electric Power Press, 2000

780125497X / 9787801254979

  • Tapa blanda
  • Nuevo
Ver todos los detalles

Librería: liu xing, Nanjing, JS, Chinaliu xing

Vendedor de 5 estrellas

Vendedor de AbeBooks desde 7 de abril de 2009

Ver los artículos de este vendedor
Tapa blanda

Condición: Nuevo

EUR 42,64

Envío por EUR 15,52 
Se envía de China a Estados Unidos de America
Métodos de pago aceptados por el vendedor
  • Giro bancario
  • PayPal

Cantidad disponible: 1 disponibles

Añadir al carrito
Devoluciones gratuitas de 30 días
¿Quiere pagar con su tarjeta de crédito?
  • Visa
  • Mastercard
  • American Express
  • Apple Pay
  • Google Pay
Comprar en AbeBooks.com

Descripción del artículo del vendedor

Ship out in 2 business day, And Fast shipping, Free Tracking number will be provided after the shipment.Paperback. Pub Date: 1998 05 of Pages: 235 Publisher: China Electric Power Press Learning from the textbook: large boiler running focuses on the basic principle and practicality. not only about the large-scale natural circulation boiler. controlled circulation boilers. once-through boiler burning coal run the basic principle of the powder boiler startup. shutdown. normal operation. but also on the characteristics of large boilers. coordination control and safety protection of new technology to do a proper introduction. Learning from the textbook: large boiler operation colleges heat power engineering undergraduate textbooks. but also can be used as the Workers' University. of correspondence teaching materials. also available to run in thermal power plants. design and engineering and technical personnel start debugging reference. Contents: Section II of the large power plant boilers Overview Preface Chapter Section I boiler capacity parameters and cycle ways typical boiler section III automatic control of boiler startup and shutdown Section I Overview Chapter II boiler startup and outage safety economy start with the outage of the third quarter of Section 2 Power Unit heating surface during startup security System Section II drum boiler start the fourth quarter to start the process of combustion conditions Chapter drum boiler start first section starts with stopping Section III of the shipping process steam drum the start stress the fourth quarter pot water circulation pump automatically run Section V Embarkation process steam temperature and water level in Section VI shipment of the condition and wash silicon process sodas Chapter DC boiler start the first section once-through boiler start characteristics Section II Boiler Start bypass system the basic procedures of Section III DC boiler Kai outage Section IV Boiler Start conditions of normal operation of the first section of the fifth chapter of the drum boiler Overview Section II boiler state parameter monitoring requirements section static characteristics of the fourth quarter of section V of the dynamic characteristics of state parameter adjustment static characteristics of the sixth chapter of the DC characteristics and adjust the characteristics of the boiler status parameters Section 1 Section II of the dynamic characteristics of the third quarter to adjust the characteristics of Chapter VII of the milling system start and stop and transported economical operation in the fourth quarter of milling system common fault line first milling system start and stop the running of the second milling system to adjust the third quarter pulverizing system and deal with Chapter VIII of the boiler combustion control and regulation Section I pulverized coal burner ignition furnace Cause of Explosion in section II. and the prevention of section IV of the measures in the third quarter furnace safety supervisory system boiler combustion regulation automatically adjusts the combustion section V. Chapter large capacity thermal power peaking first transformer run advantages and disadvantages of Section II of Chapter 10 of the transformer to run the boiler running unit unit load to adjust the load adjustment method in section II of Section 1 Power Unit Power Unit Load Control System Section III unit unit run controlFour Satisfaction guaranteed,or money back.

N° de ref. del artículo NE003652

Detalles bibliográficos

Título
Learning from the textbook: large boiler operation(Chinese Edition)
Autor
JIN WEI QIANG
Editorial
China Electric Power Press
Año de publicación
2000
Estado
New
Encuadernación
paperback
Idioma
chino
ISBN 10
780125497X
ISBN 13
9787801254979

liu xing

Nanjing, JS, China

Vendedor de 5 estrellas

Vendedor de AbeBooks desde 7 de abril de 2009

Tarifas de envío de China a Estados Unidos de America

ArtículoDe 16 a 30 días hábilesDe 8 a 16 días hábiles
Primer artículoEUR 15,52EUR 25,86
Los plazos de entrega los establecen los vendedores y varían según el transportista y la ubicación. Los pedidos que pasan por la aduana pueden sufrir retrasos y los compradores son responsables de los aranceles o tarifas asociadas. Los vendedores pueden ponerse en contacto con usted en relación con cargos adicionales para cubrir cualquier aumento en los costes de envío de los artículos.

Métodos de pago

Puede pagar con su tarjeta de crédito en AbeBooks.com.
  • Giro bancario
  • PayPal

Descripción de la tienda

Thank you for visiting My bookstore! We are an online bookstore, and Is the China's largest online book sales. Generally our books are from China, with reasonable price and decent printing quality. We are always trying our best to satisfy customer's needs!

Especialidad

Chemistry, Mathematics, Computer, Physics, Environment, Social Sciences

Información empresarial del vendedor

NAN JING SHI JIANG NING QU NING YUAN DIAN ZI SHANG WU ZHONG XIN

Room 264, Oujiang Shopping Center, No. 1 Dongxin South Road, Dongshan Street, Jiangning District, NanJing
Nanjing, JS China 211100