Lean Project Delivery and Integrated Practices in Modern Construction
Idioma: inglés
Editorial: Taylor and Francis Ltd, GB, 2020
- Tapa dura
- Nuevo

Librería: Rarewaves.com UK, London, Reino UnidoRarewaves.com UK
Vendedor de AbeBooks desde el 11 de junio de 2025
Condición: Nuevo
EUR 166,79
Cantidad disponible: Más de 20 disponibles
Añadir al carritoDescripción del artículo del vendedor
Lean Project Delivery and Integrated Practices in Modern Construction is the new and enhanced edition of the pioneering book Modern Construction by Lincoln H. Forbes and Syed M. Ahmed.This book provides a multi-faceted approach for applying lean methodologies to improve design and construction processes. Recognizing the wide diversity in the landscape of projects, and encompassing private and public sector activity, buildings and infrastructure, the book expands upon the detailed coverage of integrated project delivery and new lean tools and techniques to include: Greater emphasis on the importance of creating a lean culture and the initiatives required to transform the industry; Expanded discussions of the foundational writings in lean construction theory; Exploration of the synergies between "lean" and "green" initiatives; Specific procedures for modifying planning and scheduling activities to improve the performance of the project team; Expanded sections on quality, and topics that have become a part of the lean lexicon, such as Choosing by Advantages, "line of balance"/location-based scheduling, virtual design teams, takt time planning and set-based design; Discussion questions for beginners and advanced lean practitioners; and Improved cross-referencing within the text to help the reader navigate the frameworks, techniques and tools to support the application of lean principles.The techniques described here enhance the use of resources, reducing waste, minimizing delays, increasing quality and reducing overall costs. They enable practitioners to improve the quality of the built environment, secure higher levels of customer/owner satisfaction, and simultaneously improve their profitability. This book is essential reading for all those wanting to be at the forefront of construction management and lean thinking.…
N° de ref. del artículo LU-9781138311244
- Título
- Lean Project Delivery and Integrated Practices in Modern Construction
- Autor
- Syed M. Ahmed, Lincoln H. Forbes
- Editorial
- Taylor and Francis Ltd, GB
- Año de publicación
- 2020
- Estado
- New
- Encuadernación
- Hardback
- Idioma
- inglés
- ISBN 10
- 1138311243
- ISBN 13
- 9781138311244
- Edición
- 2ª Edición
- Peso del artículo
- 1133 gramos
This book provides a multi-faceted approach for applying lean methodologies to improve design and construction processes.
“Sinopsis” puede pertenecer a otra edición de este título.
Acerca del autor
Lincoln H. Forbes, PhD, PE, CM-Lean, specializes in Lean Project Delivery and lean management systems. A professional engineer, he has over 35 years’ experience in quality/performance improvement as well as facilities design and construction management support. Dr. Forbes is a member of the Lean Construction Institute (LCI) and the International Group for Lean Construction (IGLC). He holds the CM-Lean credential from the Associated General Contractors of America (AGC). He is a fellow of the Institute of Industrial and Systems Engineers (IISE), and is the founder and past president of their Construction Division. A senior member of the American Society for Quality (ASQ), he also holds the LEED AP designation. He held senior facilities-related positions with Miami-Dade County Public Schools earlier in his career. Dr. Forbes has also served in adjunct positions in construction management programs at East Carolina University, Florida International University, and Drexel University. He is a principal consultant for Harding Associates, Inc. in Miami, Florida. He holds PhD, MBA, and MSIE degrees from the University of Miami. He has authored several papers, columns, book chapters and books; he has served as a reviewer for the ASCE Journal of Construction Engineering and Management, and the Journal of the Built Environment Project and Asset Management (BEPAM).
Syed M. Ahmed,PhD, is a full Professor and Chairperson of the Department of Construction Management at East Carolina University (ECU) in Greenville, North Carolina. He was Associate Professor and Graduate Program Director in the Department of Construction Management of the College of Engineering & Computing at Florida International University (FIU) in Miami. He was also an affiliated faculty member of the Department of Civil & Environmental Engineering at FIU. Dr. Ahmed has over 35 years of international experience in industry, teaching, research, and consulting in the United States, Hong Kong, Pakistan, Mexico, and Jamaica. He is the author of several books and has published extensively with over 160 peer-reviewed publications in international journals and conferences in his areas of expertise. Dr. Ahmed is currently on the editorial board of more than six international journals and serves as the associate editor of the American Society of Civil Engineers (ASCE) Journalof Construction Engineering & Management and the Built Environment Project and Asset Management (BEPAM) journal.
“Acerca de” puede pertenecer a otra edición de este título.
Rarewaves.com UK
London, Reino Unido
Vendedor de AbeBooks desde el 11 de junio de 2025
Tarifas de envío de Reino Unido a Estados Unidos de America
| Artículo | De 60 a 60 días hábiles | De 60 a 60 días hábiles |
|---|---|---|
| Primer artículo | EUR 76,12 | EUR 117,10 |
Métodos de pago
Información empresarial del vendedor
RAREWAVES.COM LIMITED
Elsley Court, 20-22 Great Titchfield Street
London, Reino Unido W1W 8BE
Derecho al desistimiento
Si es un consumidor, puede rescindir el contrato de acuerdo con lo siguiente. Por consumidor se entiende cualquier persona física que actúe con fines ajenos a su actividad comercial, empresarial, oficio o profesión.
Información sobre el derecho de desistimiento
Derecho legal de desistimiento
Tiene derecho a rescindir este contrato en un plazo de 14 días sin dar ningún motivo.
El periodo de desistimiento vencerá a los 14 días desde que usted, o un tercero que no sea el transportista e indicado por usted, adquiera la posesión física del último bien o del último lote o pieza.
Para ejercer el derecho de desistimiento, complete de forma electrónica y envíe una declaración clara en nuestro sitio web, desde "Mis compras" en "Mi cuenta". Le enviaremos sin demora un acuse de recibo de dicho desistimiento a través de un soporte duradero (por ejemplo, por correo electrónico).
Para cumplir con el plazo de desistimiento, basta con que envíe su comunicación relativa al ejercicio del derecho de desistimiento antes de que venza el periodo de desistimiento.
Efectos del desistimiento
Si rescinde este contrato, le reembolsaremos todos los pagos que hayamos recibido de usted, incluidos los gastos de envío (excepto los gastos adicionales que surjan si elige un tipo de envío que no sea el tipo de envío estándar más económico que ofrecemos).
Podemos hacer una deducción del reembolso por la pérdida de valor de cualquier bien suministrado, si la pérdida es el resultado de una manipulación innecesaria por su parte.
Efectuaremos el reembolso sin demoras indebidas y, a más tardar, 14 días después de que se nos informe de su decisión de rescindir este contrato.
Efectuaremos el reembolso utilizando el mismo medio de pago que utilizó para la transacción inicial, a menos que haya acordado expresamente lo contrario; en cualquier caso, no incurrirá en ningún cargo como resultado de dicho reembolso.
Podremos retener el reembolso hasta que hayamos recibido los bienes o hasta que nos haya presentado una prueba de que los ha devuelto, lo que ocurra primero.
Deberá devolver los bienes o entregarlos a Rarewaves.com UK, Unit 144 The Lightbox, 111 Power Road, W4 5PY, London, London, United Kingdom, sin demoras indebidas y, en cualquier caso, en un plazo máximo de 14 días a partir del día en que nos comunique su desistimiento del presente contrato. El plazo se cumple si devuelve la mercancía antes de que venza el periodo de 14 días. Tendrá que asumir los gastos directos de devolución de los bienes. Usted solo es responsable de la disminución del valor de los bienes como resultado de una manipulación distinta a la necesaria para establecer la naturaleza, las características y el funcionamiento de los bienes.
Excepciones al derecho de desistimiento
El derecho de desistimiento no se aplica a lo siguiente:
- La entrega de periódicos, diarios o revistas, con la excepción de los contratos de suscripción; y
- El suministro de contenido digital que no se proporcione en un soporte tangible (por ejemplo, en un CD o DVD) si, al hacer el pedido, aceptó que podíamos empezar a entregarlo y que no podría desistir una vez iniciada la entrega.
Condiciones de envío
Please note that we do not offer Priority shipping to any country.
We currently do not ship to the below countries:
Russia
Belarus
Ukraine
Please do not attempt to place orders with any of these countries as a ship to address - they will be cancelled.