Hydropower Project EPC Contract Project Management Theory and Practice
Idioma: inglés
Editorial: China Water Power Press Pub. Date :2011-02-01, 2011
- Tapa blanda
- Nuevo

Librería: liu xing, Nanjing, JS, Chinaliu xing
Vendedor de IberLibro desde 7 de abril de 2009
Condición: Nuevo
EUR 68,14
- Giro bancario
- PayPal
Cantidad disponible: 10 disponibles
Añadir al carritoDescripción del artículo del vendedor
Ship out in 2 business day, And Fast shipping, Free Tracking number will be provided after the shipment.Paperback. Pages Number: 207 Publisher: China Water Power Press Pub. Date: 2011-02-01. Hydropower Project EPC Contract Project Management Theory and Practice from the status of the development of general contracting and development of hydropower projects of practical significance to general contracting. design-leading EPC project management and hydropower projects. hydropower The total project EPC contractor and the contents of the main management tasks. the owners and general contractors hydropower project under Asymmetric Information EPC project schedule of a quality control decision-making and optimal contract design theory and method. the total project hydropower project EPC contractor business risk assessment method. under the influence of various risk factors EPC project cost hydropower project risk analysis. based on the visual simulation of hydroelectric engineering EPC project schedule control. considering the interest rates and price rises under the influence of a risk target of Investment Fuzzy EPC project schedule optimization method. the total hydropower project EPC contract project management information integration. Kunming Hydropower Investigation and Design Institute for EPC Turnkey Project Management of specific control procedures. Malutang Phase II Hydropower Project management practices and other aspects of contracting a more systematic hydropower projects are introduced EPC Turnkey Project Management Theory and Practice. Hydropower Project EPC Contract Project Management Theory and Practice for general contracting in the Water Resources and Hydropower project owners. general contractors. subcontractors. supervision. and related Management to read. but also for teachers and students refer to relevant professional colleges . Contents: Preface Introduction Chapter 1 Introduction 1.1 Classification and general contracting of construction projects in China 1.2 Development of management system development and general contracting status of hydropower development of hydropower projects in China 1.3 EPC 1.3.1 Significance of the traditional management of hydropower projects disadvantages 1.3.2 Development of Hydropower Project 1.4 Significance of EPC research status issues 1.4.1 Overview and general contract management on the basic theory of general contractor on the project 1.4.2 Cost and schedule control of 1.4.3 on the total Contract Project Quality Management 1.4.4 Information Integration on the Contract Project Management 1.4.5 Project general contractor on the study of risk issues 1.4.6 1.5 book Chapter 2 to design hydropower projects as the leading EPC project management model 2.1 Introduction 2.2 The hydropower project EPC general contract management model hydropower project 2.2.1 Definition 2.2.2 EPC Contract EPC turnkey projects and hydropower project construction program 2.2.3 general contractor for the design of units of the hydropower project management 2.2 EPC .4 relevant departments of the general contractor relationship with the external 2.3 units of the general contractor for the design of the hydropower project EPC project management organizational structure and duties of the hydropower project 2.3.1 Organizational Structure 2.3.2 EPC project management and hydropower projects in the EPC project management organization 2.4 square duties to carry out the design as the leading EPC hydropower projects the need for and advantages of general contracting design-build 2.4.1 Trends 2.4.2 to design hydropower projects as the leading EPC contractor to carry out the necessity to design as the leading 2.4.3 hydropower project the advantages of EPC 2.5 EPC EPC project hydropower project owners manage the contents of the EPC hydropower projects and tasks 2.5.1 main content owners to manage the project 2.5.2 IndustryFour Satisfaction guaranteed,or money back.…
N° de ref. del artículo F12654
Detalles bibliográficos
- Título
- Hydropower Project EPC Contract Project Management Theory and Practice
- Autor
- CAI SHAO KUAN DENG
- Editorial
- China Water Power Press Pub. Date :2011-02-01
- Año de publicación
- 2011
- Estado
- New
- Encuadernación
- paperback
- Idioma
- inglés
- ISBN 10
- 7508482182
- ISBN 13
- 9787508482187
liu xing
Nanjing, JS, China
Vendedor de IberLibro desde 7 de abril de 2009
Tarifas de envío de China a Estados Unidos de America
| Artículo | De 16 a 30 días hábiles | De 8 a 16 días hábiles |
|---|---|---|
| Primer artículo | EUR 16,13 | EUR 26,89 |
Descripción de la tienda
Thank you for visiting My bookstore! We are an online bookstore, and Is the China's largest online book sales. Generally our books are from China, with reasonable price and decent printing quality. We are always trying our best to satisfy customer's needs!
Especialidad
Chemistry, Mathematics, Computer, Physics, Environment, Social SciencesInformación empresarial del vendedor
NAN JING SHI JIANG NING QU NING YUAN DIAN ZI SHANG WU ZHONG XIN
JS, China
Condiciones de venta
We guarantee the condition of every book as it's described on the Abebooks web sites. If you're dissatisfied with your purchase (Incorrect Book/Not as Described/Damaged) or if the order hasn't arrived, you're eligible for a refund within 30 days of the estimated delivery date. If you've changed your mind about a book that you've ordered, please use the Ask bookseller a question link to contact us and we'll respond within 2 business days. Please Note:We don't sell any international Edition to you. Don't send any question about international Edition to us.
Derecho al desistimiento
Si es un consumidor, puede rescindir el contrato de acuerdo con lo siguiente. Por consumidor se entiende cualquier persona física que actúe con fines ajenos a su actividad comercial, empresarial, oficio o profesión.
Información sobre el derecho de desistimiento
Derecho legal de desistimiento
Tiene derecho a rescindir este contrato en un plazo de 14 días sin dar ningún motivo.
El periodo de desistimiento vencerá a los 14 días desde que usted, o un tercero que no sea el transportista e indicado por usted, adquiera la posesión física del último bien o del último lote o pieza.
Para ejercer el derecho de desistimiento, complete de forma electrónica y envíe una declaración clara en nuestro sitio web, desde "Mis compras" en "Mi cuenta". Le enviaremos sin demora un acuse de recibo de dicho desistimiento a través de un soporte duradero (por ejemplo, por correo electrónico).
Para cumplir con el plazo de desistimiento, basta con que envíe su comunicación relativa al ejercicio del derecho de desistimiento antes de que venza el periodo de desistimiento.
Efectos del desistimiento
Si rescinde este contrato, le reembolsaremos todos los pagos que hayamos recibido de usted, incluidos los gastos de envío (excepto los gastos adicionales que surjan si elige un tipo de envío que no sea el tipo de envío estándar más económico que ofrecemos).
Podemos hacer una deducción del reembolso por la pérdida de valor de cualquier bien suministrado, si la pérdida es el resultado de una manipulación innecesaria por su parte.
Efectuaremos el reembolso sin demoras indebidas y, a más tardar, 14 días después de que se nos informe de su decisión de rescindir este contrato.
Efectuaremos el reembolso utilizando el mismo medio de pago que utilizó para la transacción inicial, a menos que haya acordado expresamente lo contrario; en cualquier caso, no incurrirá en ningún cargo como resultado de dicho reembolso.
Podremos retener el reembolso hasta que hayamos recibido los bienes o hasta que nos haya presentado una prueba de que los ha devuelto, lo que ocurra primero.
Deberá devolver los bienes o entregarlos a liu xing, Nanjing, JS, China, sin demoras indebidas y, en cualquier caso, en un plazo máximo de 14 días a partir del día en que nos comunique su desistimiento del presente contrato. El plazo se cumple si devuelve la mercancía antes de que venza el periodo de 14 días. Tendrá que asumir los gastos directos de devolución de los bienes. Usted solo es responsable de la disminución del valor de los bienes como resultado de una manipulación distinta a la necesaria para establecer la naturaleza, las características y el funcionamiento de los bienes.
Excepciones al derecho de desistimiento
El derecho de desistimiento no se aplica a lo siguiente:
- La entrega de periódicos, diarios o revistas, con la excepción de los contratos de suscripción; y
- El suministro de contenido digital que no se proporcione en un soporte tangible (por ejemplo, en un CD o DVD) si, al hacer el pedido, aceptó que podíamos empezar a entregarlo y que no podría desistir una vez iniciada la entrega.
Condiciones de envío
Most orders are shipped within 24 hours. We will delivery these items to you by SAL, EUB, EMS, FEDEX etc.