Function Approach to Transportation Projects : A Value Engineering Guide
Idioma: inglés
Editorial: iUniverse, 2009
- Tapa blanda
- Nuevo

Librería: GreatBookPrices, Columbia, MD, Estados Unidos de AmericaGreatBookPrices
Vendedor de IberLibro desde 6 de abril de 2009
Condición: Nuevo
EUR 20,62
Cantidad disponible: Más de 20 disponibles
Añadir al carritoN° de ref. del artículo 6344201-n
- Título
- Function Approach to Transportation Projects : A Value Engineering Guide
- Autor
- Kasi, Muthiah
- Editorial
- iUniverse
- Año de publicación
- 2009
- Estado
- New
- Encuadernación
- Encuadernación de tapa blanda
- Idioma
- inglés
- ISBN 10
- 144015144X
- ISBN 13
- 9781440151446
“Sinopsis” puede pertenecer a otra edición de este título.
Fragmento. © Reproducción autorizada. Todos los derechos reservados.
Function Approach to Transportation Projects
A Value Engineering GuideBy Muthiah KasiiUniverse, Inc.
Copyright © 2009 Muthiah KasiAll right reserved.
ISBN: 978-1-4401-5144-6
Contents
Preface..................................................vAcknowledgements.........................................ix1.0 Introduction.........................................12.0 Information Phase....................................93.0 Information Phase-Functions..........................194.0 Information Phase-Function Logic.....................275.0 Information Phase-Cost...............................456.0 Information Phase-Function Cost......................577.0 Speculation Phase....................................758.0 Evaluation Phase-Screening...........................879.0 Evaluation Phase-Ranking.............................10110.0 Development Phase...................................12311.0 Presentation Phase..................................13312.0 Organizing a VE Study...............................15113.0 Conclusion..........................................161Glossary.................................................171References...............................................177Index....................................................179
Chapter One
IntroductionObjective
The objective of this chapter is to introduce the VE methodology and VE job plan.
History Of Value Engineering Methodology
Larry Miles developed the concept of value methodology while working at General Electric during World War II. Due to shortage of materials, parts and personnel, products were in great demand. Mr. Miles, when purchasing, approached the problem of shortage by asking the question, "What does it do?" Once he had an answer, he explored the question, "What else will do the job?" Through this process he substituted an equivalent or better product that performed the same function as the one in shortage. This new "function based approach" became very successful and was accepted as a value analysis technique. Larry Miles defined value analysis as "... a system for use when better than normal results are needed."
In the 1960's, Charles Bytheway developed a structure for functions which later became a widely known concept, Function Analysis System Technique (FAST). Later, Thomas J. Snodgrass and Ted Fowler developed the concept of a customer-oriented FAST diagram. The term FAST in this book refers to a Function Logic Diagram.
What is Value?
Value is achieved when the project has a very high performance while reaching a broad acceptance at a reasonable cost. Value is subjective. It reflects people's feeling and their needs at the time. Sometimes people can't define or describe what they want. They confuse needs and desires leading to the perception of a constraint.
People value things differently. Consider this the next time you are in a large parking lot. You will see cars of different types, size, color and price. Each one of those cars was purchased because the owner decided it was the best value for them. As an outsider, we cannot make assumptions about the motivation behind those purchases because we don't know the owners. Don't be surprised if a wealthy person chose an economical car or if a luxury car owner can't quite afford the car payment. Similarly, value engineers should not assume how owners set emphasis on the variables that define value. The VE process described in this book places a high priority on understanding the stakeholders-including the owner, their needs, desires and constraints-in order to determine value.
For example, during a VE study of a train station entrance, the owner insisted on an entrance with the best spatial quality. The team developed the entrance with various shapes and dimensions. The owner kept rejecting each idea as too small, too big, too intimidating or too restrictive. As the team got frustrated, they asked him to define his version of spatial quality. He calmly replied, "I will tell you when I see it." The team proposed more ideas until the owner became excited and said, "That's it!" This example demonstrates how subjective the term value can be and how important it is to involve the owner in this part of the process. When the owners, or their representatives, participate in the study, it helps the team define the value of a project.
Determining Value
Exploring the definition of value is a key task during any VE study. When defining value, value engineers should weigh the circumstances under which value is determined. In addition, they should recognize that the constraints, needs and desires of the users, owners and stakeholders influence value.
Years ago, I arrived at a train station around 5:30 am. The temperature was -20 degrees with a lower wind chill index. I needed 40 cents for a bus ride. I checked my pocket and realized that I had only 39 cents. I checked my wallet for a dollar bill to drop in, but all I had was a $20 bill. I couldn't find a cab anywhere. I ended up walking a mile to the office in the cold weather. I would have used as much as $5 to get a bus ride. The question is "What is my estimated value of a penny?" It is definitely not $20. Under the circumstances, I set an upper limit value of $5. What I learned was that the circumstances often dictate the value, but there is always a limit.
Value by Comparison
Value engineering encourages people to ask the question "Why?" It makes people compare the benefits of various options and determine their worth. This approach can be practiced within the context of every decision in life. When my son, who was living in Illinois, wanted to go to an out-of-state university, I asked the question, "Why do you prefer to go to an out-of-state university?" His answer indicated that he wanted to go school with some of his friends. Out-of-state tuition would have cost $9,000/year ($36,000 for four years). For my son the out-or-state school would accomplish the function of Feel Comfortable. Instead of telling him it would cost us an additional $36,000 we equated that to a cost of a sports car. We promised him a car upon graduation if he chose the in-state university. He was given a choice of two functions: Feel Comfortable vs. Receive Gift. In the end, he chose the Attract User function over Assure Convenience function by opting for the in-state school. When he graduated from school, his accomplishment and his maturity made him decide he didn't want the sports car from us. He understood later that his decision to stay in-state resulted in a much higher value. My wife and I were not surprised with the outcome. Similarly in projects, value engineers should look for ideas with alternative functions to compare. Decision makers will be able to understand appropriate value comparisons and will be able to better appreciate its long term use.
Consider an interchange reconstruction project with two alternatives: one would keep all ramps open for a three year construction period, the second would require the ramp traffic to be rerouted with a two year construction period. Which alternative has more value, more inconvenient for a shorter period or less inconvenient for a longer period? These questions are very subjective. Under various circumstances both alternatives are acceptable. Defining value is a critical part of the VE process and instrumental to the ultimate satisfaction of the stakeholders. One way to define value is by comparing various alternatives.
What is Value Engineering?
Value engineering is a systematic team approach to creatively enhance the value of a project or product. In the industry, VE is often referred to with various other names such as value analysis, value planning and value management. When the technique is applied during project planning, it is called value planning. If the techniques are used on an already designed or constructed project, it is called value analysis. The approach to each of these varies slightly, however the job plan remains the same.
VE Job Plan
Value engineering advocates a step-by-step, systematic approach to solve a problem. This systematic approach is embodied within a job plan that has several phases and imposes a set of rules that must be adhered to. The rules may appear to be simple, but they are vital to the success of the value engineering study. This section describes a typical job plan and explains the rules of the job plan and the reasoning behind them.
A typical job plan consists of the following phases:
Job Plan
* Information Phase - Function Analysis Phase * Speculation Phase
* Evaluation Phase
* Development Phase
* Presentation Phase
These phases are illustrated below and are described in more detail in the chapters that follow. These phases can also be summarized with a series of questions, also presented here.
Information Phase
The Information Phase is divided into two sections. The purpose of the first section is to understand the user, owner and stakeholders, and their constraints, needs and desires. The second section is to translate this information into functions of the project. This includes a unique VE technique, function analysis. Function analysis lists the functions, places them in a logical manner and allocates cost to each of them. High cost functions will be tested for their worth. This will be the basis for the speculation of ideas.
Critical questions answered:
What is it?
What does it do? (functions)
What does it cost?
What should it cost? (function cost)
To define functions of the project, the VE team needs to know the owner's/designer's intended solution. The status of this solution depends upon the stage of the project. The following are suggested terms to use to convey the status of the project:
Phase Designation
During Planning As Given
During Design As Intended
At the Completion of Design As Designed
The VE alternatives generated by the VE team should be designated As Proposed.
Speculation Phase
In this phase, the VE team explores alternative ways of performing functions that enhance, or at least maintain, performance or acceptance at a reasonable cost. The key to speculation is to let the mind wander freely, with no limitations. Several techniques can be used to assist the participants in exploring the widest possible range of ideas. These are described in Chapter 7.
Critical questions answered:
What else will do the job?
What if ...?
What is the least expensive way of performing each function?
Evaluation Phase
In the Evaluation Phase the VE Team will rate and rank feasible ideas. The evaluation phase is performed in two steps, screening and ranking.
Critical questions answered:
Will it work?
Will it be acceptable?
Can we afford it?
Development Phase
In this phase the VE team will add information that will facilitate selection of a preferred alternative among the highest ranked alter- natives in the Evaluation Phase.
Critical questions answered:
How can we make it acceptable to owners/users?
What can we do to make it better?
What can be done to make it cost less?
What are the strengths and weaknesses of the leading alternatives?
Presentation Phase
In the Presentation Phase the VE team prepares to convince decision makers to accept the study results. This is accomplished through an effective presentation with facts and features.
Critical questions answered:
How do we present our recommendations?
What are the road blocks?
Who really makes the decision?
Rules for the VE Job Plan
The rules that govern each phase of a value engineering study are briefly described next.
Information Phase
Do not speculate
Do not jump to conclusions. Gather as much information as possible
Do not evaluate
Understand the problem
Speculation Phase
Do not bring preconceived notions to the discussion
Do not question the validity of an idea
Encourage everyone to participate in the creative phase
Evaluation Phase
Do not create
Do not jump to conclusions
Judge each idea against the criteria
Always be prepared to explain your ratings
Development Phase
Improve ideas
Double check that assumptions are reliable
Presentation Phase
Do not assume that ideas are good
Demonstrate their worth
Follow these three steps: inform, instruct and influence
Conclusion
In this chapter, an overview of the value engineering methodology was presented. The questions listed under each phase provide foundations for the understanding of the phase. Rules were presented for each phase. These can be used as checkpoints to ensure the overall objectives for that phase are being met, while adhering to the appropriate parameters. The next chapter describes the first part of the Information Phase: Understanding the project and the stakeholders.
Chapter Two
Information PhaseObjective
The objective of this chapter is to understand the purpose and need of the project. Needs and desires of the stakeholders, owners and users are also discovered. The team needs to understand the problem, the given solution, the stakeholders affected by the problem and the expectations of these stakeholders. This understanding will later be translated into project functions. Project functions are described in the Chapter 3.
Introduction
"If I had only known what I know now, I could have saved a lot of time and pain."
We have all heard similar statements many times in our lives. Exploration of ideas or events prior to the conclusion is key to a better decision process. This is exactly what value engineering process expects in its job plan. Understanding the existing conditions, exploring people's needs and desires are all a part of the information gathering phase. The job plan for VE begins with the Information Phase. In this phase the following questions are asked and answered:
What is it?
What does it do?
What does it cost?
What should it cost?
These questions can be addressed by describing existing conditions, understanding the issues or the problems, identifying the people behind the issues, discussing the As Given solution, if any, and estimating the cost of the solution. In addition, the question "What does it do?" is addressed in terms of functions. The concept of function is the backbone of the VE process. This process is explained in detail in Chapter 3.
Process
In order to ensure that all of the appropriate information is gathered, the following steps are listed as a guide. Explore each of these steps in detail and document the results. This list is only a guide, feel free to explore other areas that may uncover information useful to the project.
Information
Step 1. Describe project including the project history (Chapter 2)
Step 2. Identify stakeholders and develop constraints/needs/desires (Chapter 2)
Step 3. Determine the project functions from the list of stakeholder constraints, needs and desires (Chapter 3)
Function Analysis
Step 4. Develop a Function Logic Diagram from the perspective of the project. (Chapter 4)
Step 5. Determine the cost of each element. (Chapter 5)
Step 6. Distribute the cost of each element to each of its functions and analyze its worth. (Chapter 6)
Stakeholders
A key component of the Information Phase is to identify the stakeholders. Stakeholders are the ones who determine if the project is a success or failure.
There are three kinds of stakeholders: users, owners and others.
Owner
* Financially responsible for funding the project
* Shares in the funding
* Represents the owner's interests
* Manages the project
User
* Actively uses or maintains the project
Others
* Financially affected by the project
* Environmentally concerned about the project
* Disturbed by any required change in habits or recreation
Define Stakeholder Constraints/Needs/desires
Each stakeholder has expectations regarding the project. These expectations are grouped into constraints, needs and desires. Descriptions of these are as follows:
Constraints
* Legal requirements
* Standards of the owner
* Physical conditions of the site
* Commitments to stakeholders
Needs
* Expectations that must be fulfilled by the project if constraints are not violated
* Limitations or restrictions that are imposed by stakeholders but which can be violated. The degree of violations will be considered in the evaluation of alternatives.
Desires
* Expectations that should be fulfilled if cost is not a factor.
There are several points to keep in mind when identifying the stakeholder constraints, needs and desires. First of all, the majority of constraints are dictated by the law and the applicable codes and standards for land use. These constraints are too numerous to be listed for each VE Study.
(Continues...)
Excerpted from Function Approach to Transportation Projectsby Muthiah Kasi Copyright © 2009 by Muthiah Kasi. Excerpted by permission.
All rights reserved. No part of this excerpt may be reproduced or reprinted without permission in writing from the publisher.
Excerpts are provided by Dial-A-Book Inc. solely for the personal use of visitors to this web site.
“Acerca de” puede pertenecer a otra edición de este título.
GreatBookPrices
Columbia, MD, Estados Unidos de America
Vendedor de IberLibro desde 6 de abril de 2009
Tarifas de envío en Estados Unidos de America
| Artículo | De 5 a 14 días hábiles | De 8 a 14 días hábiles |
|---|---|---|
| Primer artículo | EUR 2,36 | EUR 2,36 |
Métodos de pago
Descripción de la tienda
SuperBookDeals.com is your top source for finding new books at the absolute lowest prices, guaranteed ! We offer big discounts - everyday - on millions of titles in virtually any category, from Architecture to Zoology -- and everything in between. Discover great deals and super-savings, on professional books, text book titles, the newest computer guides, or your favorite fiction authors. You'll find it all - at HUGE SAVINGS - at SuperBookDeals. Browse through our complete online product catalog today. Serving customers around the world for years, we help thousands find just the books they're looking for -- at incredibly low, bargain prices.…
Información empresarial del vendedor
Expert Trading Limited
9220 Rumsey Road, Suite 101
Columbia, MD Estados Unidos de America 21045
Condiciones de venta
Company Name: GreatBookPrices
Legal Entity: Expert Trading, LLC
Address: 6310 Stevens Forest, suite 200, Columbia MD 21046
Email address: CustomerService@SuperBookDeals.com
Phone number: 410-964-0026
consumer complaints can be addressed to address above
Registration #: 52-1713923
Authorized representative: Danielle Hainsey
Derecho al desistimiento
Si es un consumidor, puede rescindir el contrato de acuerdo con lo siguiente. Por consumidor se entiende cualquier persona física que actúe con fines ajenos a su actividad comercial, empresarial, oficio o profesión.
Información sobre el derecho de desistimiento
Derecho legal de desistimiento
Tiene derecho a rescindir este contrato en un plazo de 14 días sin dar ningún motivo.
El periodo de desistimiento vencerá a los 14 días desde que usted, o un tercero que no sea el transportista e indicado por usted, adquiera la posesión física del último bien o del último lote o pieza.
Para ejercer el derecho de desistimiento, complete de forma electrónica y envíe una declaración clara en nuestro sitio web, desde "Mis compras" en "Mi cuenta". Le enviaremos sin demora un acuse de recibo de dicho desistimiento a través de un soporte duradero (por ejemplo, por correo electrónico).
Para cumplir con el plazo de desistimiento, basta con que envíe su comunicación relativa al ejercicio del derecho de desistimiento antes de que venza el periodo de desistimiento.
Efectos del desistimiento
Si rescinde este contrato, le reembolsaremos todos los pagos que hayamos recibido de usted, incluidos los gastos de envío (excepto los gastos adicionales que surjan si elige un tipo de envío que no sea el tipo de envío estándar más económico que ofrecemos).
Podemos hacer una deducción del reembolso por la pérdida de valor de cualquier bien suministrado, si la pérdida es el resultado de una manipulación innecesaria por su parte.
Efectuaremos el reembolso sin demoras indebidas y, a más tardar, 14 días después de que se nos informe de su decisión de rescindir este contrato.
Efectuaremos el reembolso utilizando el mismo medio de pago que utilizó para la transacción inicial, a menos que haya acordado expresamente lo contrario; en cualquier caso, no incurrirá en ningún cargo como resultado de dicho reembolso.
Podremos retener el reembolso hasta que hayamos recibido los bienes o hasta que nos haya presentado una prueba de que los ha devuelto, lo que ocurra primero.
Deberá devolver los bienes o entregarlos a GreatBookPrices, Bensenville, Illinois, U.S.A., sin demoras indebidas y, en cualquier caso, en un plazo máximo de 14 días a partir del día en que nos comunique su desistimiento del presente contrato. El plazo se cumple si devuelve la mercancía antes de que venza el periodo de 14 días. Tendrá que asumir los gastos directos de devolución de los bienes. Usted solo es responsable de la disminución del valor de los bienes como resultado de una manipulación distinta a la necesaria para establecer la naturaleza, las características y el funcionamiento de los bienes.
Excepciones al derecho de desistimiento
El derecho de desistimiento no se aplica a lo siguiente:
- La entrega de periódicos, diarios o revistas, con la excepción de los contratos de suscripción; y
- El suministro de contenido digital que no se proporcione en un soporte tangible (por ejemplo, en un CD o DVD) si, al hacer el pedido, aceptó que podíamos empezar a entregarlo y que no podría desistir una vez iniciada la entrega.
Condiciones de envío
Our warehouses across the globe are fully operational without substantial delays. We are working hard and continue to overcome the daily challenges presented by COVID-19. We appreciate your understanding.
Internal processing of your order will take about 1-2 business days. Please allow an additional 4-14 business days for Media Mail delivery. We have multiple ship-from locations - MD,IL,NJ,UK,IN,NV,TN & GA