Electrical Power in Data Centers - Made Simple and Interesting (Paperback)
Idioma: inglés
Editorial: Independently Published, 2026
- Tapa blanda
- Nuevo

Librería: Grand Eagle Retail, Bensenville, IL, Estados Unidos de AmericaGrand Eagle Retail
Vendedor de IberLibro desde 12 de octubre de 2005
Condición: Nuevo
EUR 22,88
Cantidad disponible: 1 disponible
Añadir al carritoDescripción del artículo del vendedor
Paperback. There is a good chance you are reading this on a device powered by electricity, connected to the internet through a data center that consumes as much power as a small city, served by a grid whose inner workings almost nobody outside a narrow circle of engineers has ever stopped to think about. That invisibility is precisely the problem this book sets out to solve.We live in an age that runs on data. Every search query, every streamed video, every AI-generated response, every bank transaction, every medical record retrieved at a hospital reception desk - all of it passes through vast warehouses of computing hardware that have one overwhelming, non-negotiable requirement: electricity. Reliable, clean, continuous, enormous quantities of electricity. And yet the story of how that electricity is generated, transported, transformed, and delivered to the server racks that power the digital world is almost never told in language that ordinary intelligent people can follow.This book tells that story.It does not assume you have an engineering degree. It does not assume you know what a transformer does, or why grain-oriented electrical steel matters, or what a gas turbine has to do with the speed of your internet connection. It assumes only that you are curious - that you sense, perhaps, that the data center boom reshaping our economy is built on a physical foundation that deserves to be understood, and that you would like someone to explain it clearly, honestly, and without burying you in jargon.That is exactly what these pages set out to do.What This Book CoversWe begin where the story begins - with the sheer scale of what data centers actually demand from the electrical grid, and why that demand is unlike anything the power industry has encountered before. From there we descend, layer by layer, through the physical infrastructure that makes it all possible: the transmission lines, the substations, the transformers, the switchgear, the cables, the generators. We look at the materials those systems are made from - copper, electrical steel, superalloys, rare earth elements - and at the remarkable, fragile global supply chains that produce them. We examine the machines at the heart of the system, particularly the gas turbines whose lead times now stretch years into the future and whose scarcity is quietly reshaping energy strategy across the world.We then look outward - at the industries and communities affected when the power supply that everyone assumed was simply there begins to show signs of strain. Manufacturing, healthcare, financial services, agriculture, and the small businesses that have built their operations on the quiet assumption that cloud infrastructure will always be available and affordable - all of these are navigating consequences that most of their leaders did not see coming.The book closes with a clear-eyed look at the paths forward: the policy tools, the emerging technologies, and the shifts in how data centers themselves are designed and operated that together offer a realistic route through a challenge that is significant but not insurmountable.Why This MattersThe decisions being made right now - about where to build data centers, how to structure long-term power agreements, where to invest in manufacturing capacity, how to train the engineers and tradespeople the grid will need - will shape the reliability and affordability of electrical power for a generation. Those decisions are being made by politicians, investors, corporate boards, and regulators, most of whom do not have an electrical engineering background. This book exists to give those decision-makers - and the citizens who will live with the consequences of their choices - the understanding they need to ask the right questions and recognise a good answer when they hear one. < Shipping may be from multiple locations in the US or from the UK, depending on stock availability.…
N° de ref. del artículo 9798196206184
- Título
- Electrical Power in Data Centers - Made Simple and Interesting (Paperback)
- Autor
- Rashmi Nair
- Editorial
- Independently Published
- Año de publicación
- 2026
- Estado
- new
- Encuadernación
- Paperback
- Idioma
- inglés
- ISBN 13
- 9798196206184
- Serie
- Libro 7 de 17: Data Centers - Careers
We live in an age that runs on data. Every search query, every streamed video, every AI-generated response, every bank transaction, every medical record retrieved at a hospital reception desk — all of it passes through vast warehouses of computing hardware that have one overwhelming, non-negotiable requirement: electricity. Reliable, clean, continuous, enormous quantities of electricity. And yet the story of how that electricity is generated, transported, transformed, and delivered to the server racks that power the digital world is almost never told in language that ordinary intelligent people can follow.
This book tells that story.
It does not assume you have an engineering degree. It does not assume you know what a transformer does, or why grain-oriented electrical steel matters, or what a gas turbine has to do with the speed of your internet connection. It assumes only that you are curious — that you sense, perhaps, that the data center boom reshaping our economy is built on a physical foundation that deserves to be understood, and that you would like someone to explain it clearly, honestly, and without burying you in jargon.
That is exactly what these pages set out to do.
What This Book Covers
We begin where the story begins — with the sheer scale of what data centers actually demand from the electrical grid, and why that demand is unlike anything the power industry has encountered before. From there we descend, layer by layer, through the physical infrastructure that makes it all possible: the transmission lines, the substations, the transformers, the switchgear, the cables, the generators. We look at the materials those systems are made from — copper, electrical steel, superalloys, rare earth elements — and at the remarkable, fragile global supply chains that produce them. We examine the machines at the heart of the system, particularly the gas turbines whose lead times now stretch years into the future and whose scarcity is quietly reshaping energy strategy across the world.
We then look outward — at the industries and communities affected when the power supply that everyone assumed was simply there begins to show signs of strain. Manufacturing, healthcare, financial services, agriculture, and the small businesses that have built their operations on the quiet assumption that cloud infrastructure will always be available and affordable — all of these are navigating consequences that most of their leaders did not see coming.
The book closes with a clear-eyed look at the paths forward: the policy tools, the emerging technologies, and the shifts in how data centers themselves are designed and operated that together offer a realistic route through a challenge that is significant but not insurmountable.
Why This Matters
The decisions being made right now — about where to build data centers, how to structure long-term power agreements, where to invest in manufacturing capacity, how to train the engineers and tradespeople the grid will need — will shape the reliability and affordability of electrical power for a generation. Those decisions are being made by politicians, investors, corporate boards, and regulators, most of whom do not have an electrical engineering background. This book exists to give those decision-makers — and the citizens who will live with the consequences of their choices — the understanding they need to ask the right questions and recognise a good answer when they hear one.
“Sinopsis” puede pertenecer a otra edición de este título.
Grand Eagle Retail
Bensenville, IL, Estados Unidos de America
Vendedor de IberLibro desde 12 de octubre de 2005
Tarifas de envío en Estados Unidos de America
| Artículo | De 6 a 14 días hábiles | De 6 a 16 días hábiles |
|---|---|---|
| Primer artículo | EUR 0,00 | EUR 0,00 |
Métodos de pago
Información empresarial del vendedor
APOLLO ONLINE CORP.
605 Geddes Street
Wilmington, DE Estados Unidos de America 19805
Condiciones de venta
We guarantee the condition of every book as it¿s described on the Abebooks web sites. If you¿ve changed
your mind about a book that you¿ve ordered, please use the Ask bookseller a question link to contact us
and we¿ll respond within 2 business days.
Books ship from California and Michigan.
Derecho al desistimiento
Si es un consumidor, puede rescindir el contrato de acuerdo con lo siguiente. Por consumidor se entiende cualquier persona física que actúe con fines ajenos a su actividad comercial, empresarial, oficio o profesión.
Información sobre el derecho de desistimiento
Derecho legal de desistimiento
Tiene derecho a rescindir este contrato en un plazo de 14 días sin dar ningún motivo.
El periodo de desistimiento vencerá a los 14 días desde que usted, o un tercero que no sea el transportista e indicado por usted, adquiera la posesión física del último bien o del último lote o pieza.
Para ejercer el derecho de desistimiento, complete de forma electrónica y envíe una declaración clara en nuestro sitio web, desde "Mis compras" en "Mi cuenta". Le enviaremos sin demora un acuse de recibo de dicho desistimiento a través de un soporte duradero (por ejemplo, por correo electrónico).
Para cumplir con el plazo de desistimiento, basta con que envíe su comunicación relativa al ejercicio del derecho de desistimiento antes de que venza el periodo de desistimiento.
Efectos del desistimiento
Si rescinde este contrato, le reembolsaremos todos los pagos que hayamos recibido de usted, incluidos los gastos de envío (excepto los gastos adicionales que surjan si elige un tipo de envío que no sea el tipo de envío estándar más económico que ofrecemos).
Podemos hacer una deducción del reembolso por la pérdida de valor de cualquier bien suministrado, si la pérdida es el resultado de una manipulación innecesaria por su parte.
Efectuaremos el reembolso sin demoras indebidas y, a más tardar, 14 días después de que se nos informe de su decisión de rescindir este contrato.
Efectuaremos el reembolso utilizando el mismo medio de pago que utilizó para la transacción inicial, a menos que haya acordado expresamente lo contrario; en cualquier caso, no incurrirá en ningún cargo como resultado de dicho reembolso.
Podremos retener el reembolso hasta que hayamos recibido los bienes o hasta que nos haya presentado una prueba de que los ha devuelto, lo que ocurra primero.
Deberá devolver los bienes o entregarlos a Grand Eagle Retail, Bensenville, Illinois, U.S.A., sin demoras indebidas y, en cualquier caso, en un plazo máximo de 14 días a partir del día en que nos comunique su desistimiento del presente contrato. El plazo se cumple si devuelve la mercancía antes de que venza el periodo de 14 días. Tendrá que asumir los gastos directos de devolución de los bienes. Usted solo es responsable de la disminución del valor de los bienes como resultado de una manipulación distinta a la necesaria para establecer la naturaleza, las características y el funcionamiento de los bienes.
Excepciones al derecho de desistimiento
El derecho de desistimiento no se aplica a lo siguiente:
- La entrega de periódicos, diarios o revistas, con la excepción de los contratos de suscripción; y
- El suministro de contenido digital que no se proporcione en un soporte tangible (por ejemplo, en un CD o DVD) si, al hacer el pedido, aceptó que podíamos empezar a entregarlo y que no podría desistir una vez iniciada la entrega.
Condiciones de envío
Orders usually ship within 2 business days. All books within the US ship free of charge. Delivery is 4-14 business days anywhere in the United States.
Books ship from California and Michigan.
If your book order is heavy or oversized, we may contact you to let you know extra shipping is required.