ELECTRIC UTILITY RESOURCE PLANNING
Idioma: inglés
Editorial: CRC Press, 2025
- Tapa blanda
- Nuevo

Librería: Basi6 International, Irving, TX, Estados Unidos de AmericaBasi6 International
Vendedor de IberLibro desde 24 de junio de 2016
Condición: Nuevo
EUR 69,40
Cantidad disponible: 1 disponible
Añadir al carritoDescripción del artículo del vendedor
New. US edition. Expediting shipping for all USA and Europe orders excluding PO Box. Excellent Customer Service.
N° de ref. del artículo ABEOCT25-316320
- Título
- ELECTRIC UTILITY RESOURCE PLANNING
- Autor
- SIM, STEVEN
- Editorial
- CRC Press
- Año de publicación
- 2025
- Estado
- Brand New
- Encuadernación
- Encuadernación de tapa blanda
- Idioma
- inglés
- ISBN 10
- 1032294221
- ISBN 13
- 9781032294223
- Edición
- 2ª Edición
In 2012, using easy-to-understand text and examples, the first edition of this book explained how electric utilities “work,” and how they plan (or should plan) for the future, by:
- "Creating" a hypothetical electric utility
- Explaining how (and why) this utility will operate its system of generating units
- Guiding readers through a planning analysis for the utility, examining various resource options (solar, new gas-fueled generation, and conservation)
- Introducing four Fundamental Principles of Resource Planning that should guide utilities as they plan for the future
The first edition material, with significant updates, now appears as Part I of the second edition of this book. Part II of this book then presents six all-new chapters that address the challenges (and opportunities) of moving toward a zero-carbon future. Using the same hypothetical utility, with its new goal to utilize solar and batteries to serve 100% of its customers’ energy with zero carbon emissions by a future “target”year, Part II of this book addresses many subjects, including:
- The enormous amount of MW of new solar and batteries the utility will need to add
- Why certain characteristics of new solar and battery additions change as increasing amounts of these resources are added
- In the years prior to achieving its zero-carbon goal, how the hourly operation of the utility’s existing fossil-fueled generators, plus the new solar, will change (and why the stability of the transmission grid will be challenged)
With this second edition, author Dr. Steven Sim again applies the experience and insights he gained from more than 30 years of resource planning for Florida Power & Light (FPL). As one of the largest electric utilities in the United States, FPL has faced a multitude of resource planning challenges, including how to get to zero carbon. During this time period, Dr. Sim performed and directed thousands of analyses designed to address these challenges. He also served as an expert witness in dozens of regulatory hearings, addressing both the economics of resource options and the non-economic impacts (air emissions, system reliability, fuel usage, etc.) associated with these options.
“Sinopsis” puede pertenecer a otra edición de este título.
Acerca del autor
Dr. Steven Sim has worked in the field of energy analysis since the mid-1970s. He graduated from the University of Miami (Florida) with bachelor’s and master’s degrees in mathematics in 1973 and 1975, respectively. He then earned a doctorate in environmental science and engineering from the University of California at Los Angeles (UCLA) in 1979 with an emphasis on energy.
During his doctoral work, Dr. Sim also completed an internship of approximately a year and a half at the Florida Solar Energy Center (FSEC), a research arm of Florida’s state university system located in Merritt Island, Florida, near Cape Canaveral. His work at FSEC involved an examination of consumers’ experience with solar water heaters and projections of the potential for renewable energy in the Southeastern United States.
In 1979, Dr. Sim joined Florida Power & Light Company (FPL), a subsidiary of NextEra Energy, Inc. FPL is one of the largest electric utilities in the United States. In the more than 40 years from 1979 to the time the 2nd edition of this book is being written, FPL has experienced tremendous population growth in the geographic area it serves. Annual average growth has been roughly 74,000 net new customer accounts per year during that period. With each customer account representing approximately 2.5 people, this represents a growth of approximately 185,000 more people per year that FPL needed to serve.
Therefore, the growth that FPL had to keep up with was roughly equivalent to 1 million new people every 5.4 years. Few, if any, other electric utilities have had to face the challenges inherent in meeting continued growth of this magnitude over such an extended time. This extraordinary growth, combined with the planning issues that all utilities face including changing environmental regulations, fuel decisions, modification/retirement of existing generating units, changes in generating technologies, etc., ensured that FPL’s planning efforts have addressed a wide variety of resource planning challenges.
During that time, Dr. Sim has had several roles in regard to FPL’s resource planning efforts. He spent approximately the first 10 years of his career at FPL designing a number of FPL’s demand side management (DSM) programs. One of these, the Passive Home Program, earned a U.S. Department of Energy (DOE) award for innovation. Among the numerous other DSM programs he either designed or co-designed were the Conservation Water Heating Program (that featured heat pump and solar water heaters) and one of the nation’s most successful load management programs (FPL’s residential load control program, known as the On Call Program, has approximately 800,000 participating customers).
In the course of designing these DSM programs, he became very interested in gaining a better understanding of how DSM programs affect FPL’s entire utility system. Of particular interest were how FPL’s DSM programs impacted the actual operation of FPL’s generation, transmission, and distribution systems, including impacts on air emissions for the FPL system as a whole, and fuel usage by all of the power plants in FPL’s system.
This interest led to him joining FPL’s System Planning Department in 1991. This department (since renamed the Integrated Resource Planning Department) is charged with determining when new resources should be added to the FPL system, the magnitude of the needed new resources, and what the best resources are for FPL to add to meet the continued growth in customers (and their demand for electricity), changing environmental laws, and other regulatory requirements.
Dr. Sim has found this work to be challenging, continually evolving, and always interesting. Over this time, Dr. Sim has performed, directed, and/or collaborated on many thousands of analyses designed to examine how FPL can best serve its customers given these changing circumstances, laws, and regulations. In addition to these analyses, Dr. Sim has also served as an FPL witness in dozens of hearings before the Florida Public Service Commission (FPSC) and in hearings/meetings with other Florida governmental agencies and organizations. A partial list of the subjects addressed in these hearings included: the economic and non-economic impacts to the FPL system of proposed new resource additions including nuclear, coal, natural gas, solar, battery storage, and conversion of existing fossil-fueled generating units to hydrogen-fueled units; the economic and non-economic impacts to the FPL system of FPL’s DSM programs that are alternatives to new power plants; analyses of generation additions versus transmission additions; the air emission and fuel use impacts to the FPL system from each of these resource options; the reliability of the utility system; and the planning processes that can be used by a utility to plan for new resources.
In these numerous regulatory hearings, Dr. Sim has provided both written and oral testimony. In so doing, he has had the opportunity to respond to a wide variety of inquiries from regulators, administrative law judges, environmental organizations, fuel suppliers, etc., regarding a host of issues. Dr. Sim has also participated in various collaborative efforts with other electric utility organizations and individual utilities, including advisory groups for the international Electric Power Research Institute (EPRI). In addition, he has served on the Southeast Electric Exchange’s (SEE) Integrated Resource Planning Task Force and the resource planning group of the Florida Reliability Coordinating Council (formerly the Florida Coordinating Group). He has also served as Chair for the latter two groups.
These activities have further broadened his perspective of the challenges facing other electric utilities across the country and how these challenges are being addressed. Over the years, he has spoken at a number of electric utility conferences, both national and international. At one of those conferences, the 6th National Demand-Side Management Conference, Dr. Sim was awarded the Outstanding Speaker Award. He has also enjoyed speaking with, and to, a variety of individuals and groups that were interested in energy issues, particularly those issues that directly involve electric utilities. He has seen this interest grow in recent years as issues such as energy prices, climate change, renewable energy, and federal/state energy policy are regularly in the news.
In light of this growing public interest, Dr. Sim wrote the 1st edition of this book in 2012 to share the insight he had gained in over 30 years of directly analyzing energy-related issues for one of the biggest electric utilities in the United States, and in collaborating with others in the electric utility industry regarding the challenges they have faced.
In the decade since 2012 and the publishing of the 1st edition of this book, there have been many changes in the electric utility industry that FPL and other utilities have faced in their resource planning work. As an example, one of Dr. Sim’s major projects was to direct the resource planning analyses to determine what it would take for FPL to get to zero-carbon operation in various target years. Based in large part on the results of these analyses, NextEra Energy made an announcement in June 2022 of a "Real Zero" goal of getting to zero carbon emissions by 2045.
The utility industry changes that have occurred since the 1st edition of this book was published, and especially the analyses of what it takes to achieve a zero-carbon goal, led to the writing of the 2nd edition of this book.
Dr. Sim retired from FPL in October 2022. He continues to teach a resource planning course for FPL and other NextEra Energy companies. His hope is that, through the 2nd edition of this book (and/or the resource planning course sessions), he will be able to convey insight he has gained in over 40 years of various aspects of resource planning work for such a large, rapidly growing electric utility. And, as a result, that this insight will help to facilitate discussions on a variety of energy-related issues, leading to better informed decisions by utilities, regulators, and legislators. Finally, he hopes that you will not only find this book informative, but enjoyable to read as well.
“Acerca de” puede pertenecer a otra edición de este título.
Basi6 International
Irving, TX, Estados Unidos de America
Vendedor de IberLibro desde 24 de junio de 2016
Tarifas de envío en Estados Unidos de America
| Artículo | De 3 a 6 días hábiles | De 5 a 14 días hábiles |
|---|---|---|
| Primer artículo | EUR 0,00 | EUR 0,00 |
Métodos de pago
Descripción de la tienda
Professional Book Seller offering fast shipping and hassle-free returns for every order. Our 100% satisfaction policy guarantees that you get the best product and the best service at the best price!
Especialidad
Educational and reference booksInformación empresarial del vendedor
Basi6 International LLC
1018 Camino Lago
Irving, TX Estados Unidos de America 75039
Condiciones de venta
Basi6 Interntional LLC
(A Texas State LLC)
Contact Information:
Raman Arora
Basi6.int@gmail.com
+1-214-4998944
Registered Address:
1944 Lantana Ln,
Irving, TX 75063
Returns Address:
1944 Lantana Ln,
Irving, TX 75063
Derecho al desistimiento
Si es un consumidor, puede rescindir el contrato de acuerdo con lo siguiente. Por consumidor se entiende cualquier persona física que actúe con fines ajenos a su actividad comercial, empresarial, oficio o profesión.
Información sobre el derecho de desistimiento
Derecho legal de desistimiento
Tiene derecho a rescindir este contrato en un plazo de 14 días sin dar ningún motivo.
El periodo de desistimiento vencerá a los 14 días desde que usted, o un tercero que no sea el transportista e indicado por usted, adquiera la posesión física del último bien o del último lote o pieza.
Para ejercer el derecho de desistimiento, complete de forma electrónica y envíe una declaración clara en nuestro sitio web, desde "Mis compras" en "Mi cuenta". Le enviaremos sin demora un acuse de recibo de dicho desistimiento a través de un soporte duradero (por ejemplo, por correo electrónico).
Para cumplir con el plazo de desistimiento, basta con que envíe su comunicación relativa al ejercicio del derecho de desistimiento antes de que venza el periodo de desistimiento.
Efectos del desistimiento
Si rescinde este contrato, le reembolsaremos todos los pagos que hayamos recibido de usted, incluidos los gastos de envío (excepto los gastos adicionales que surjan si elige un tipo de envío que no sea el tipo de envío estándar más económico que ofrecemos).
Podemos hacer una deducción del reembolso por la pérdida de valor de cualquier bien suministrado, si la pérdida es el resultado de una manipulación innecesaria por su parte.
Efectuaremos el reembolso sin demoras indebidas y, a más tardar, 14 días después de que se nos informe de su decisión de rescindir este contrato.
Efectuaremos el reembolso utilizando el mismo medio de pago que utilizó para la transacción inicial, a menos que haya acordado expresamente lo contrario; en cualquier caso, no incurrirá en ningún cargo como resultado de dicho reembolso.
Podremos retener el reembolso hasta que hayamos recibido los bienes o hasta que nos haya presentado una prueba de que los ha devuelto, lo que ocurra primero.
Deberá devolver los bienes o entregarlos a Basi6 International, Irving, Texas, U.S.A., sin demoras indebidas y, en cualquier caso, en un plazo máximo de 14 días a partir del día en que nos comunique su desistimiento del presente contrato. El plazo se cumple si devuelve la mercancía antes de que venza el periodo de 14 días. Tendrá que asumir los gastos directos de devolución de los bienes. Usted solo es responsable de la disminución del valor de los bienes como resultado de una manipulación distinta a la necesaria para establecer la naturaleza, las características y el funcionamiento de los bienes.
Excepciones al derecho de desistimiento
El derecho de desistimiento no se aplica a lo siguiente:
- La entrega de periódicos, diarios o revistas, con la excepción de los contratos de suscripción; y
- El suministro de contenido digital que no se proporcione en un soporte tangible (por ejemplo, en un CD o DVD) si, al hacer el pedido, aceptó que podíamos empezar a entregarlo y que no podría desistir una vez iniciada la entrega.
Condiciones de envío
All orders shipped via FedEx or DHL and delivered to your doorstep within 3-5 days. We do not ship to P.O.Boxes and a proper street address must be provided to avoid any delays.