Decarbonization of Copper Production by Optimal Demand Response and Power-to-Hydrogen (Paperback)
Idioma: inglés
Editorial: Verlag G. Mainz, 2022
- Tapa blanda
- Nuevo

Librería: Grand Eagle Retail, Bensenville, IL, Estados Unidos de AmericaGrand Eagle Retail
Vendedor de IberLibro desde 12 de octubre de 2005
Condición: Nuevo
EUR 47,50
Cantidad disponible: 1 disponible
Añadir al carritoDescripción del artículo del vendedor
Paperback. To avoid greenhouse gas (GHG) emissions and mitigate climate change, low-carbon technologies must be used to provide renewable energy and replace fossil fuels. However, this system transition is very material-intensive and leads to high demand for critical materials. Copper is such a material that is essential for electrical applications and many low-carbon technologies. The production of copper itself is an energyintensive process. Thus, two challenges arise that are addressed in this thesis: the flexible process operation in a fluctuating renewable energy system and the avoidance of process-based GHG emissions.The flexible operation of electricity-intensive processes can support the power grid and provide economic benefits. Demand response (DR) describes operational adjustments based on an economic incentive, such as fluctuating electricity prices. Our initial analysis shows a large DR potential of two electricity-intensive process steps in copper production. To consider the DR potential of the entire production process and to capture the dependencies of the many process steps, we formulate a detailed scheduling model of a representative copper production process. The developed mixed-integer linear program (MILP) allows minimizing the electricity costs without reducing the production volume. This process-wide scheduling enables significant DR potential, reducing annual electricity costs by up to 14.2% and shifting large parts of the electricity demand.Avoiding process-based GHG emissions is challenging because fossil fuels are hard to substitute in some processes. These processes use fossil fuels as high-temperature process heat and as chemical reducing agents. A promising alternative for these use cases is hydrogen (H2), when H2 is produced from renewable electricity using water electrolysis (Power-to-H2). The oxygen produced as a by-product offers further benefits as it can be utilized in copper production. To optimally design a power-to-H2 system, we formulate a MILP that minimizes the total annualized cost. The resulting CO2 abatement costs are 201EUR/t CO2-eq, which exceeds the current prices of EU allowances. However, a sensitivity analysis shows great potential through further development of water electrolysis.Decarbonization through Power-to-H2 offers additional DR potential. Our scheduling model of the decarbonized copper production shows that DR strongly contributes to low CO2 abatement costs. Consequently, this work identifies the potential of decarbonized copper production that provides a critical material for low-carbon technologies and supports the power grid through DR. Shipping may be from multiple locations in the US or from the UK, depending on stock availability.…
N° de ref. del artículo 9783958864580
- Título
- Decarbonization of Copper Production by Optimal Demand Response and Power-to-Hydrogen (Paperback)
- Autor
- Dr Fritz Thomas Carl Roeben
- Editorial
- Verlag G. Mainz
- Año de publicación
- 2022
- Estado
- new
- Encuadernación
- Paperback
- Idioma
- inglés
- ISBN 10
- 3958864589
- ISBN 13
- 9783958864580
To avoid greenhouse gas (GHG) emissions and mitigate climate change, low-carbon technologies must be used to provide renewable energy and replace fossil fuels. However, this system transition is very material-intensive and leads to high demand for critical materials. Copper is such a material that is essential for electrical applications and many low-carbon technologies. The production of copper itself is an energyintensive process. Thus, two challenges arise that are addressed in this thesis: the flexible process operation in a fluctuating renewable energy system and the avoidance of process-based GHG emissions.
The flexible operation of electricity-intensive processes can support the power grid and provide economic benefits. Demand response (DR) describes operational adjustments based on an economic incentive, such as fluctuating electricity prices. Our initial analysis shows a large DR potential of two electricity-intensive process steps in copper production. To consider the DR potential of the entire production process and to capture the dependencies of the many process steps, we formulate a detailed scheduling model of a representative copper production process. The developed mixed-integer linear program (MILP) allows minimizing the electricity costs without reducing the production volume. This process-wide scheduling enables significant DR potential, reducing annual electricity costs by up to 14.2% and shifting large parts of the electricity demand.
Avoiding process-based GHG emissions is challenging because fossil fuels are hard to substitute in some processes. These processes use fossil fuels as high-temperature process heat and as chemical reducing agents. A promising alternative for these use cases is hydrogen (H2), when H2 is produced from renewable electricity using water electrolysis (Power-to-H2). The oxygen produced as a by-product offers further benefits as it can be utilized in copper production. To optimally design a power-to-H2 system, we formulate a MILP that minimizes the total annualized cost. The resulting CO2 abatement costs are 201EUR/t CO2-eq, which exceeds the current prices of EU allowances. However, a sensitivity analysis shows great potential through further development of water electrolysis.
Decarbonization through Power-to-H2 offers additional DR potential. Our scheduling model of the decarbonized copper production shows that DR strongly contributes to low CO2 abatement costs. Consequently, this work identifies the potential of decarbonized copper production that provides a critical material for low-carbon technologies and supports the power grid through DR.
“Sinopsis” puede pertenecer a otra edición de este título.
Grand Eagle Retail
Bensenville, IL, Estados Unidos de America
Vendedor de IberLibro desde 12 de octubre de 2005
Tarifas de envío en Estados Unidos de America
| Artículo | De 6 a 14 días hábiles | De 6 a 16 días hábiles |
|---|---|---|
| Primer artículo | EUR 0,00 | EUR 0,00 |
Métodos de pago
Información empresarial del vendedor
APOLLO ONLINE CORP.
605 Geddes Street
Wilmington, DE Estados Unidos de America 19805
Condiciones de venta
We guarantee the condition of every book as it¿s described on the Abebooks web sites. If you¿ve changed
your mind about a book that you¿ve ordered, please use the Ask bookseller a question link to contact us
and we¿ll respond within 2 business days.
Books ship from California and Michigan.
Derecho al desistimiento
Si es un consumidor, puede rescindir el contrato de acuerdo con lo siguiente. Por consumidor se entiende cualquier persona física que actúe con fines ajenos a su actividad comercial, empresarial, oficio o profesión.
Información sobre el derecho de desistimiento
Derecho legal de desistimiento
Tiene derecho a rescindir este contrato en un plazo de 14 días sin dar ningún motivo.
El periodo de desistimiento vencerá a los 14 días desde que usted, o un tercero que no sea el transportista e indicado por usted, adquiera la posesión física del último bien o del último lote o pieza.
Para ejercer el derecho de desistimiento, complete de forma electrónica y envíe una declaración clara en nuestro sitio web, desde "Mis compras" en "Mi cuenta". Le enviaremos sin demora un acuse de recibo de dicho desistimiento a través de un soporte duradero (por ejemplo, por correo electrónico).
Para cumplir con el plazo de desistimiento, basta con que envíe su comunicación relativa al ejercicio del derecho de desistimiento antes de que venza el periodo de desistimiento.
Efectos del desistimiento
Si rescinde este contrato, le reembolsaremos todos los pagos que hayamos recibido de usted, incluidos los gastos de envío (excepto los gastos adicionales que surjan si elige un tipo de envío que no sea el tipo de envío estándar más económico que ofrecemos).
Podemos hacer una deducción del reembolso por la pérdida de valor de cualquier bien suministrado, si la pérdida es el resultado de una manipulación innecesaria por su parte.
Efectuaremos el reembolso sin demoras indebidas y, a más tardar, 14 días después de que se nos informe de su decisión de rescindir este contrato.
Efectuaremos el reembolso utilizando el mismo medio de pago que utilizó para la transacción inicial, a menos que haya acordado expresamente lo contrario; en cualquier caso, no incurrirá en ningún cargo como resultado de dicho reembolso.
Podremos retener el reembolso hasta que hayamos recibido los bienes o hasta que nos haya presentado una prueba de que los ha devuelto, lo que ocurra primero.
Deberá devolver los bienes o entregarlos a Grand Eagle Retail, Bensenville, Illinois, U.S.A., sin demoras indebidas y, en cualquier caso, en un plazo máximo de 14 días a partir del día en que nos comunique su desistimiento del presente contrato. El plazo se cumple si devuelve la mercancía antes de que venza el periodo de 14 días. Tendrá que asumir los gastos directos de devolución de los bienes. Usted solo es responsable de la disminución del valor de los bienes como resultado de una manipulación distinta a la necesaria para establecer la naturaleza, las características y el funcionamiento de los bienes.
Excepciones al derecho de desistimiento
El derecho de desistimiento no se aplica a lo siguiente:
- La entrega de periódicos, diarios o revistas, con la excepción de los contratos de suscripción; y
- El suministro de contenido digital que no se proporcione en un soporte tangible (por ejemplo, en un CD o DVD) si, al hacer el pedido, aceptó que podíamos empezar a entregarlo y que no podría desistir una vez iniciada la entrega.
Condiciones de envío
Orders usually ship within 2 business days. All books within the US ship free of charge. Delivery is 4-14 business days anywhere in the United States.
Books ship from California and Michigan.
If your book order is heavy or oversized, we may contact you to let you know extra shipping is required.