Construction Project Management (Paperback)
Idioma: inglés
Editorial: Raintree Press (OR), 2026
- Tapa blanda
- Nuevo

Librería: Grand Eagle Retail, Bensenville, IL, Estados Unidos de AmericaGrand Eagle Retail
Vendedor de IberLibro desde 12 de octubre de 2005
Condición: Nuevo
EUR 50,04
Cantidad disponible: 1 disponible
Añadir al carritoDescripción del artículo del vendedor
Paperback. Construction Project Management is a comprehensive, step-by-step guide for managing building projects. The content goes well beyond a general introduction, focusing on the practical knowledge and skills that are essential in the workplace. The discussion begins with an overview of the construction market, the players, the codes, the permits, trade organizations, and new technologies. We'll then look at how contractors are organized, the way new work is picked up, and the role of unions. Coverage continues with clear guidance through each step of the construction process: Construction Contracts Several types of agreements are used for commercial work. These chapters walk through the differences and draw attention to key areas.like the common reasons for confusion over the start date.Preconstruction Services The contractor is often involved well before breaking ground on negotiated projects. This section details creating budgets, avoiding mistakes in scheduling, giving design input, and how value engineering works.Final Estimate This will become the roadmap for all project spending. In twelve chapters, the estimating process is covered, from soliciting subcontractor bids and doing quantity surveys to pricing work and developing a clarifications list.Buyout Writing subcontracts means looking for ways to save money, avoiding "scope holes" and not doing business with someone that won't perform. It's all covered!Payment Applications Several chapters walk through the payment process, how front-end loading works, how risk is evaluated for materials stored offsite, and why some owners require cost substantiations.Change Proposals Getting paid for extra work is essential. These chapters explain what qualifies as a change and how to organize, distribute, price, and track added work. A step by step procedure is then outlined for assembling change proposals and change orders.Subcontractor Management When a subcontractor goes out of business, finding a replacement and cleaning up unpaid bills is the project manager's responsibility. This chapter discusses how these situations unfold and how risk is managed.Construction Project Management explains how the business works, the shortcuts, what to avoid, where money is made or lost, and how risk is managed. This is a valuable resource packed with insights that are immediately useful to the reader. This guide to the construction business goes well beyond a general introduction, focusing on the knowledge and skills that are essential in the workplace. This item is printed on demand. Shipping may be from multiple locations in the US or from the UK, depending on stock availability.…
N° de ref. del artículo 9798985859096
- Título
- Construction Project Management (Paperback)
- Autor
- Tim Fenton
- Editorial
- Raintree Press (OR)
- Año de publicación
- 2026
- Estado
- new
- Encuadernación
- Paperback
- Idioma
- inglés
- ISBN 13
- 9798985859096
- Edición
- 2ª Edición
Written for the new professional, Construction Project Management is an invaluable guide that explains how building projects are managed and how the construction process works.
This text offers a comprehensive introduction to the industry, but what makes it special is its practical focus. Rather than staying theoretical, its aim is to explain the knowledge and skills that are essential in the workplace.
This second edition starts with an overview of the construction market, the players, the codes, the permits, the trade organizations, and new technologies. The topic then zeros in on contractor organization, the way new work is picked up, and the role of unions.
Contracts are explained with all their components and exhibits, with attention drawn to special areas of concern.
Preconstruction services are provided on most negotiated projects. In six chapters you’ll find out how it works, what is expected of the contractor, and how it benefits the project.
The final estimate will become the roadmap for all project spending. Twelve chapters are devoted to the entire process, from soliciting subcontractor bids and doing quantity surveys to pricing work and developing a clarifications list.
The “buyout” and writing subcontracts comes after the estimate. Discover how it’s done and learn about the three measures of a successful buyout.
In preparation for the construction phase, the topic turns to schedules, meetings and jobsite safety. You’ll also gain insight on the relationship between the project manager and superintendent.
Each step of the billing process is walked through in detail. The project manager oversees this effort which is a key element in managing the project finances.
Getting paid for changes is vital to the project’s success. In five chapters, the step-by-step process for identifying and processing changes is outlined.
Managing quality takes considerable effort. You’ll gain an understanding of submittals, field questions, and consultant reports, and learn how mockups and pre-installation meetings can avoid later problems.
The risk management section introduces the reader to five types of labor shortages and some practical solutions. We’ll then explain what is involved when a subcontractor or vendor goes out of business. And finally, the insurance chapter gives an overview of twelve types of insurance that can limit the contractor’s risk.
Closeout is a long process the project manager will oversee. Learn about everything from punch lists, final billings, and warranties, to owner manuals, demobilizing, and audits.
Dive into these details of managing building projects:
• Should a non-performing subcontractor be terminated?
• How are profit centers built into negotiated work?
• What are the warning signs of a supplier with financial trouble?
• Should the contractor require that all direction from the owner be in writing?
• What is overbilling, how is it done, and how is it prevented?
Find all this and plenty more in Construction Project Management !
This is a great career that pays well and is in high demand.
“Sinopsis” puede pertenecer a otra edición de este título.
Grand Eagle Retail
Bensenville, IL, Estados Unidos de America
Vendedor de IberLibro desde 12 de octubre de 2005
Tarifas de envío en Estados Unidos de America
| Artículo | De 6 a 14 días hábiles | De 6 a 16 días hábiles |
|---|---|---|
| Primer artículo | EUR 0,00 | EUR 0,00 |
Métodos de pago
Información empresarial del vendedor
APOLLO ONLINE CORP.
605 Geddes Street
Wilmington, DE Estados Unidos de America 19805
Condiciones de venta
We guarantee the condition of every book as it¿s described on the Abebooks web sites. If you¿ve changed
your mind about a book that you¿ve ordered, please use the Ask bookseller a question link to contact us
and we¿ll respond within 2 business days.
Books ship from California and Michigan.
Derecho al desistimiento
Si es un consumidor, puede rescindir el contrato de acuerdo con lo siguiente. Por consumidor se entiende cualquier persona física que actúe con fines ajenos a su actividad comercial, empresarial, oficio o profesión.
Información sobre el derecho de desistimiento
Derecho legal de desistimiento
Tiene derecho a rescindir este contrato en un plazo de 14 días sin dar ningún motivo.
El periodo de desistimiento vencerá a los 14 días desde que usted, o un tercero que no sea el transportista e indicado por usted, adquiera la posesión física del último bien o del último lote o pieza.
Para ejercer el derecho de desistimiento, complete de forma electrónica y envíe una declaración clara en nuestro sitio web, desde "Mis compras" en "Mi cuenta". Le enviaremos sin demora un acuse de recibo de dicho desistimiento a través de un soporte duradero (por ejemplo, por correo electrónico).
Para cumplir con el plazo de desistimiento, basta con que envíe su comunicación relativa al ejercicio del derecho de desistimiento antes de que venza el periodo de desistimiento.
Efectos del desistimiento
Si rescinde este contrato, le reembolsaremos todos los pagos que hayamos recibido de usted, incluidos los gastos de envío (excepto los gastos adicionales que surjan si elige un tipo de envío que no sea el tipo de envío estándar más económico que ofrecemos).
Podemos hacer una deducción del reembolso por la pérdida de valor de cualquier bien suministrado, si la pérdida es el resultado de una manipulación innecesaria por su parte.
Efectuaremos el reembolso sin demoras indebidas y, a más tardar, 14 días después de que se nos informe de su decisión de rescindir este contrato.
Efectuaremos el reembolso utilizando el mismo medio de pago que utilizó para la transacción inicial, a menos que haya acordado expresamente lo contrario; en cualquier caso, no incurrirá en ningún cargo como resultado de dicho reembolso.
Podremos retener el reembolso hasta que hayamos recibido los bienes o hasta que nos haya presentado una prueba de que los ha devuelto, lo que ocurra primero.
Deberá devolver los bienes o entregarlos a Grand Eagle Retail, Bensenville, Illinois, U.S.A., sin demoras indebidas y, en cualquier caso, en un plazo máximo de 14 días a partir del día en que nos comunique su desistimiento del presente contrato. El plazo se cumple si devuelve la mercancía antes de que venza el periodo de 14 días. Tendrá que asumir los gastos directos de devolución de los bienes. Usted solo es responsable de la disminución del valor de los bienes como resultado de una manipulación distinta a la necesaria para establecer la naturaleza, las características y el funcionamiento de los bienes.
Excepciones al derecho de desistimiento
El derecho de desistimiento no se aplica a lo siguiente:
- La entrega de periódicos, diarios o revistas, con la excepción de los contratos de suscripción; y
- El suministro de contenido digital que no se proporcione en un soporte tangible (por ejemplo, en un CD o DVD) si, al hacer el pedido, aceptó que podíamos empezar a entregarlo y que no podría desistir una vez iniciada la entrega.
Condiciones de envío
Orders usually ship within 2 business days. All books within the US ship free of charge. Delivery is 4-14 business days anywhere in the United States.
Books ship from California and Michigan.
If your book order is heavy or oversized, we may contact you to let you know extra shipping is required.