"Sinopsis" puede pertenecer a otra edición de este libro.
Librería: PBShop.store UK, Fairford, GLOS, Reino Unido
PAP. Condición: New. New Book. Delivered from our UK warehouse in 4 to 14 business days. THIS BOOK IS PRINTED ON DEMAND. Established seller since 2000. Nº de ref. del artículo: L0-9798192848302
Cantidad disponible: Más de 20 disponibles
Librería: California Books, Miami, FL, Estados Unidos de America
Condición: New. Print on Demand. Nº de ref. del artículo: I-9798192848302
Cantidad disponible: Más de 20 disponibles
Librería: Grand Eagle Retail, Bensenville, IL, Estados Unidos de America
Paperback. Condición: new. Paperback. The Field Reference for Managers Who Manage Engineers, and Were Never Taught MEP.A ceiling conflict caught on a drawing costs a redline. The same conflict caught after ductwork, sprinkler mains, and cable tray are already installed costs three trades, two weeks, and a change order.Most construction managers are never formally taught mechanical, electrical, and plumbing systems. They are still held responsible for them: the submittals, the coordination meetings, the inspections, the budget. The gap is not engineering knowledge. It is the ability to read what the engineer designed, recognise what the subcontractor is actually installing, and see a conflict coming before it is built.This handbook closes that gap. It builds coordination judgment, not design capability. Equations appear only where a construction manager genuinely needs to sanity-check a submitted number.Read mechanical, electrical, plumbing, fire protection, and controls drawings with confidenceTrace an air-side system from unit to diffuser, and a one-line diagram from service to branch panelRecognise the field defects that most often fail an inspection, and prepare for the walkthroughSequence rough-in across trades so systems can be installed in the order their geometry requiresRun coordination and clash detection meetings that resolve conflicts instead of logging themEvaluate cost proposals and challenge a change order on technical groundsKnow when a field question is yours to answer and when it must go to the engineer of recordTwenty-one chapters, in three parts. Part I: reading drawings, specifications, and submittals, and handling site utilities before they set the schedule. Part II: HVAC, power distribution, emergency and standby systems, plumbing, fire protection, building automation, and specialty scope including elevators and low-voltage systems. Part III: coordination and clash detection, trade sequencing, commissioning, inspections and permitting, change orders and cost control, closeout and warranty, and the energy trends reshaping design.Every chapter opens with learning objectives and closes with practice problems that test judgment rather than calculation. Case applications trace real failures back to the decision that caused them.For construction managers, project managers, superintendents, field engineers, owner's representatives, and construction management students responsible for MEP scope without an engineering background.Stop being surprised by MEP scope. Open the book and start reading the job the way the coordination meeting demands. This item is printed on demand. Shipping may be from multiple locations in the US or from the UK, depending on stock availability. Nº de ref. del artículo: 9798192848302
Cantidad disponible: 1 disponibles
Librería: PBShop.store US, Wood Dale, IL, Estados Unidos de America
PAP. Condición: New. New Book. Shipped from UK. THIS BOOK IS PRINTED ON DEMAND. Established seller since 2000. Nº de ref. del artículo: L0-9798192848302
Cantidad disponible: Más de 20 disponibles
Librería: CitiRetail, Stevenage, Reino Unido
Paperback. Condición: new. Paperback. The Field Reference for Managers Who Manage Engineers, and Were Never Taught MEP.A ceiling conflict caught on a drawing costs a redline. The same conflict caught after ductwork, sprinkler mains, and cable tray are already installed costs three trades, two weeks, and a change order.Most construction managers are never formally taught mechanical, electrical, and plumbing systems. They are still held responsible for them: the submittals, the coordination meetings, the inspections, the budget. The gap is not engineering knowledge. It is the ability to read what the engineer designed, recognise what the subcontractor is actually installing, and see a conflict coming before it is built.This handbook closes that gap. It builds coordination judgment, not design capability. Equations appear only where a construction manager genuinely needs to sanity-check a submitted number.Read mechanical, electrical, plumbing, fire protection, and controls drawings with confidenceTrace an air-side system from unit to diffuser, and a one-line diagram from service to branch panelRecognise the field defects that most often fail an inspection, and prepare for the walkthroughSequence rough-in across trades so systems can be installed in the order their geometry requiresRun coordination and clash detection meetings that resolve conflicts instead of logging themEvaluate cost proposals and challenge a change order on technical groundsKnow when a field question is yours to answer and when it must go to the engineer of recordTwenty-one chapters, in three parts. Part I: reading drawings, specifications, and submittals, and handling site utilities before they set the schedule. Part II: HVAC, power distribution, emergency and standby systems, plumbing, fire protection, building automation, and specialty scope including elevators and low-voltage systems. Part III: coordination and clash detection, trade sequencing, commissioning, inspections and permitting, change orders and cost control, closeout and warranty, and the energy trends reshaping design.Every chapter opens with learning objectives and closes with practice problems that test judgment rather than calculation. Case applications trace real failures back to the decision that caused them.For construction managers, project managers, superintendents, field engineers, owner's representatives, and construction management students responsible for MEP scope without an engineering background.Stop being surprised by MEP scope. Open the book and start reading the job the way the coordination meeting demands. This item is printed on demand. Shipping may be from our UK warehouse or from our Australian or US warehouses, depending on stock availability. Nº de ref. del artículo: 9798192848302
Cantidad disponible: 1 disponibles
Librería: AHA-BUCH GmbH, Einbeck, Alemania
Taschenbuch. Condición: Neu. Neuware - The Field Reference for Managers Who Manage Engineers, and Were Never Taught MEP.A ceiling conflict caught on a drawing costs a redline. The same conflict caught after ductwork, sprinkler mains, and cable tray are already installed costs three trades, two weeks, and a change order.Most construction managers are never formally taught mechanical, electrical, and plumbing systems. They are still held responsible for them: the submittals, the coordination meetings, the inspections, the budget. The gap is not engineering knowledge. It is the ability to read what the engineer designed, recognise what the subcontractor is actually installing, and see a conflict coming before it is built.This handbook closes that gap. It builds coordination judgment, not design capability. Equations appear only where a construction manager genuinely needs to sanity-check a submitted number.- Read mechanical, electrical, plumbing, fire protection, and controls drawings with confidence- Trace an air-side system from unit to diffuser, and a one-line diagram from service to branch panel- Recognise the field defects that most often fail an inspection, and prepare for the walkthrough- Sequence rough-in across trades so systems can be installed in the order their geometry requires- Run coordination and clash detection meetings that resolve conflicts instead of logging them- Evaluate cost proposals and challenge a change order on technical grounds- Know when a field question is yours to answer and when it must go to the engineer of recordTwenty-one chapters, in three parts. Part I: reading drawings, specifications, and submittals, and handling site utilities before they set the schedule. Part II: HVAC, power distribution, emergency and standby systems, plumbing, fire protection, building automation, and specialty scope including elevators and low-voltage systems. Part III: coordination and clash detection, trade sequencing, commissioning, inspections and permitting, change orders and cost control, closeout and warranty, and the energy trends reshaping design.Every chapter opens with learning objectives and closes with practice problems that test judgment rather than calculation. Case applications trace real failures back to the decision that caused them.For construction managers, project managers, superintendents, field engineers, owner's representatives, and construction management students responsible for MEP scope without an engineering background.Stop being surprised by MEP scope. Open the book and start reading the job the way the coordination meeting demands. Nº de ref. del artículo: 9798192848302
Cantidad disponible: 2 disponibles