A protective relay does nothing visible for almost all of its service life. It measures, compares, and waits — and then, in the brief and violent moment a fault arrives, everything depends on whether the protection was proven correctly before it went into service.
The gap between a relay that is configured correctly and a protection scheme that actually works is wide, and it is where commissioning failures hide. A setting that is right on paper means little if a current transformer is wired with reversed polarity, if a trip contact lands on the wrong breaker, if a communications channel behaves unexpectedly, or if a single logic equation is wrong. Rote, menu-driven procedures collapse the moment the equipment, scheme, or symptom differs from the example.
This comprehensive, practical guide closes that gap. It treats testing and commissioning as a disciplined process of establishing evidence that a protection scheme behaves exactly as its approved design requires. Every protection function is developed from its operating principle — through the quantities and logic you must verify — to suitable test methods and the interpretation of results, so you can reason about an unfamiliar relay instead of memorising one model’s buttons.
What you will be able to do:
"Sinopsis" puede pertenecer a otra edición de este libro.
Librería: Grand Eagle Retail, Bensenville, IL, Estados Unidos de America
Paperback. Condición: new. Paperback. A protective relay does nothing visible for almost all of its service life. It measures, compares, and waits - and then, in the brief and violent moment a fault arrives, everything depends on whether the protection was proven correctly before it went into service. The gap between a relay that is configured correctly and a protection scheme that actually works is wide, and it is where commissioning failures hide. A setting that is right on paper means little if a current transformer is wired with reversed polarity, if a trip contact lands on the wrong breaker, if a communications channel behaves unexpectedly, or if a single logic equation is wrong. Rote, menu-driven procedures collapse the moment the equipment, scheme, or symptom differs from the example.This comprehensive, practical guide closes that gap. It treats testing and commissioning as a disciplined process of establishing evidence that a protection scheme behaves exactly as its approved design requires. Every protection function is developed from its operating principle - through the quantities and logic you must verify - to suitable test methods and the interpretation of results, so you can reason about an unfamiliar relay instead of memorising one model's buttons. What you will be able to do: Verify the full measurement-to-trip chain, from instrument transformers through relay logic to breaker operation.Test overcurrent (50/51), differential (87), and distance (21) protection, including inverse-time curves, restraint characteristics, harmonic/inrush security, and boundary searches.Prove synchronism-check, dead-bus/dead-line logic, and communications-assisted scheme behaviour end to end.Carry out safe secondary and primary injection with correct isolation, test blocks, and trip-path control.Plan and time distributed, multi-terminal end-to-end tests, then move a scheme through pre-energization readiness, staged energization, and clean handover.Investigate misoperations with event timelines, oscillography, and a competing-hypotheses method, and build a maintenance programme that keeps protection dependable.The treatment is deliberately manufacturer-neutral, so the methods stay valid across relay generations and vendors while you take specific settings and tolerances from your own controlling documents. Worked examples, practice problems, answer keys, and standards references appear throughout. Written for relay test technicians, protection and control engineers, and substation commissioning engineers - and suitable for advanced students entering the field - this is the first-principles reference for anyone who must prove a scheme before it is trusted. Take the next step toward testing and commissioning protection with clarity and confidence: open the book and start building tests that are rigorous, repeatable, and understood. This item is printed on demand. Shipping may be from multiple locations in the US or from the UK, depending on stock availability. Nº de ref. del artículo: 9798173517258
Cantidad disponible: 1 disponibles
Librería: California Books, Miami, FL, Estados Unidos de America
Condición: New. Print on Demand. Nº de ref. del artículo: I-9798173517258
Cantidad disponible: Más de 20 disponibles
Librería: PBShop.store US, Wood Dale, IL, Estados Unidos de America
PAP. Condición: New. New Book. Shipped from UK. THIS BOOK IS PRINTED ON DEMAND. Established seller since 2000. Nº de ref. del artículo: L0-9798173517258
Cantidad disponible: Más de 20 disponibles
Librería: PBShop.store UK, Fairford, GLOS, Reino Unido
PAP. Condición: New. New Book. Delivered from our UK warehouse in 4 to 14 business days. THIS BOOK IS PRINTED ON DEMAND. Established seller since 2000. Nº de ref. del artículo: L0-9798173517258
Cantidad disponible: Más de 20 disponibles
Librería: CitiRetail, Stevenage, Reino Unido
Paperback. Condición: new. Paperback. A protective relay does nothing visible for almost all of its service life. It measures, compares, and waits - and then, in the brief and violent moment a fault arrives, everything depends on whether the protection was proven correctly before it went into service. The gap between a relay that is configured correctly and a protection scheme that actually works is wide, and it is where commissioning failures hide. A setting that is right on paper means little if a current transformer is wired with reversed polarity, if a trip contact lands on the wrong breaker, if a communications channel behaves unexpectedly, or if a single logic equation is wrong. Rote, menu-driven procedures collapse the moment the equipment, scheme, or symptom differs from the example.This comprehensive, practical guide closes that gap. It treats testing and commissioning as a disciplined process of establishing evidence that a protection scheme behaves exactly as its approved design requires. Every protection function is developed from its operating principle - through the quantities and logic you must verify - to suitable test methods and the interpretation of results, so you can reason about an unfamiliar relay instead of memorising one model's buttons. What you will be able to do: Verify the full measurement-to-trip chain, from instrument transformers through relay logic to breaker operation.Test overcurrent (50/51), differential (87), and distance (21) protection, including inverse-time curves, restraint characteristics, harmonic/inrush security, and boundary searches.Prove synchronism-check, dead-bus/dead-line logic, and communications-assisted scheme behaviour end to end.Carry out safe secondary and primary injection with correct isolation, test blocks, and trip-path control.Plan and time distributed, multi-terminal end-to-end tests, then move a scheme through pre-energization readiness, staged energization, and clean handover.Investigate misoperations with event timelines, oscillography, and a competing-hypotheses method, and build a maintenance programme that keeps protection dependable.The treatment is deliberately manufacturer-neutral, so the methods stay valid across relay generations and vendors while you take specific settings and tolerances from your own controlling documents. Worked examples, practice problems, answer keys, and standards references appear throughout. Written for relay test technicians, protection and control engineers, and substation commissioning engineers - and suitable for advanced students entering the field - this is the first-principles reference for anyone who must prove a scheme before it is trusted. Take the next step toward testing and commissioning protection with clarity and confidence: open the book and start building tests that are rigorous, repeatable, and understood. This item is printed on demand. Shipping may be from our UK warehouse or from our Australian or US warehouses, depending on stock availability. Nº de ref. del artículo: 9798173517258
Cantidad disponible: 1 disponibles
Librería: AHA-BUCH GmbH, Einbeck, Alemania
Taschenbuch. Condición: Neu. Neuware - A protective relay does nothing visible for almost all of its service life. It measures, compares, and waits - and then, in the brief and violent moment a fault arrives, everything depends on whether the protection was proven correctly before it went into service. The gap between a relay that is configured correctly and a protection scheme that actually works is wide, and it is where commissioning failures hide. A setting that is right on paper means little if a current transformer is wired with reversed polarity, if a trip contact lands on the wrong breaker, if a communications channel behaves unexpectedly, or if a single logic equation is wrong. Rote, menu-driven procedures collapse the moment the equipment, scheme, or symptom differs from the example.>What you will be able to do: - Verify the full measurement-to-trip chain, from instrument transformers through relay logic to breaker operation.- Test overcurrent (50/51), differential (87), and distance (21) protection, including inverse-time curves, restraint characteristics, harmonic/inrush security, and boundary searches.- Prove synchronism-check, dead-bus/dead-line logic, and communications-assisted scheme behaviour end to end.- Carry out safe secondary and primary injection with correct isolation, test blocks, and trip-path control.- Plan and time distributed, multi-terminal end-to-end tests, then move a scheme through pre-energization readiness, staged energization, and clean handover.- Investigate misoperations with event timelines, oscillography, and a competing-hypotheses method, and build a maintenance programme that keeps protection dependable.>Written for relay test technicians, protection and control engineers, and substation commissioning engineers - and suitable for advanced students entering the field - this is the first-principles reference for anyone who must prove a scheme before it is trusted. Take the next step toward testing and commissioning protection with clarity and confidence: open the book and start building tests that are rigorous, repeatable, and understood. Nº de ref. del artículo: 9798173517258
Cantidad disponible: 2 disponibles