Artículos relacionados a Heuristic Methods for Job Shop Scheduling: Active,...

Heuristic Methods for Job Shop Scheduling: Active, non-delay and heuristic schedule generation algorithm - Tapa blanda

 
9786204206752: Heuristic Methods for Job Shop Scheduling: Active, non-delay and heuristic schedule generation algorithm

Sinopsis

As a result, there are still some schedules that are not precise, causing a large make-span. In observations made on 5 products, the company requires a total production time (make-span) of 11 hours 54 minutes in completing production activities. In this research, scheduling evaluation is conducted to minimize make-span using the Active Schedule Generation algorithm, Non-delay Schedule Generation and Heuristic Schedule Generation Algorithm The approach used is to use a quantitative-comparative approach, namely research that compiles the calculation process to make comparisons between the results of the actual process with these methods. Therefore, the Heuristic Schedule Generation algorithm method was chosen as the best method and can be applied in the company to minimize the make-span.

"Sinopsis" puede pertenecer a otra edición de este libro.

Comprar nuevo

Ver este artículo

EUR 23,00 gastos de envío desde Alemania a Estados Unidos de America

Destinos, gastos y plazos de envío

Otras ediciones populares con el mismo título

9786204208473: Heuristic Methods for Job Shop Scheduling: Active, Non-delay and Heuristic Schedule Generation Algorithm

Edición Destacada

ISBN 10:  6204208470 ISBN 13:  9786204208473
Editorial: LAP LAMBERT Academic Publishing, 2021
Tapa blanda

Resultados de la búsqueda para Heuristic Methods for Job Shop Scheduling: Active,...

Imagen del vendedor

Muhammad Arul Zaini
ISBN 10: 6204206753 ISBN 13: 9786204206752
Nuevo Taschenbuch
Impresión bajo demanda

Librería: BuchWeltWeit Ludwig Meier e.K., Bergisch Gladbach, Alemania

Calificación del vendedor: 5 de 5 estrellas Valoración 5 estrellas, Más información sobre las valoraciones de los vendedores

Taschenbuch. Condición: Neu. This item is printed on demand - it takes 3-4 days longer - Neuware -As a result, there are still some schedules that are not precise, causing a large make-span. In observations made on 5 products, the company requires a total production time (make-span) of 11 hours 54 minutes in completing production activities. In this research, scheduling evaluation is conducted to minimize make-span using the Active Schedule Generation algorithm, Non-delay Schedule Generation and Heuristic Schedule Generation Algorithm The approach used is to use a quantitative-comparative approach, namely research that compiles the calculation process to make comparisons between the results of the actual process with these methods. Therefore, the Heuristic Schedule Generation algorithm method was chosen as the best method and can be applied in the company to minimize the make-span. 88 pp. Englisch. Nº de ref. del artículo: 9786204206752

Contactar al vendedor

Comprar nuevo

EUR 39,90
Convertir moneda
Gastos de envío: EUR 23,00
De Alemania a Estados Unidos de America
Destinos, gastos y plazos de envío

Cantidad disponible: 2 disponibles

Añadir al carrito

Imagen del vendedor

Muhammad Arul Zaini
Publicado por LAP LAMBERT Academic Publishing, 2021
ISBN 10: 6204206753 ISBN 13: 9786204206752
Nuevo Tapa blanda
Impresión bajo demanda

Librería: moluna, Greven, Alemania

Calificación del vendedor: 4 de 5 estrellas Valoración 4 estrellas, Más información sobre las valoraciones de los vendedores

Condición: New. Dieser Artikel ist ein Print on Demand Artikel und wird nach Ihrer Bestellung fuer Sie gedruckt. Autor/Autorin: Zaini Muhammad ArulMy name is Muhammad Arul Zaini, I was born on 9th September 1996 in Indonesia. Since a child I was educated and living far from my parents until I graduated and got a master s degree in engineering. I have dedicate. Nº de ref. del artículo: 519630314

Contactar al vendedor

Comprar nuevo

EUR 34,25
Convertir moneda
Gastos de envío: EUR 48,99
De Alemania a Estados Unidos de America
Destinos, gastos y plazos de envío

Cantidad disponible: Más de 20 disponibles

Añadir al carrito

Imagen del vendedor

Muhammad Arul Zaini
ISBN 10: 6204206753 ISBN 13: 9786204206752
Nuevo Taschenbuch

Librería: buchversandmimpf2000, Emtmannsberg, BAYE, Alemania

Calificación del vendedor: 5 de 5 estrellas Valoración 5 estrellas, Más información sobre las valoraciones de los vendedores

Taschenbuch. Condición: Neu. Neuware -As a result, there are still some schedules that are not precise, causing a large make-span. In observations made on 5 products, the company requires a total production time (make-span) of 11 hours 54 minutes in completing production activities. In this research, scheduling evaluation is conducted to minimize make-span using the Active Schedule Generation algorithm, Non-delay Schedule Generation and Heuristic Schedule Generation Algorithm The approach used is to use a quantitative-comparative approach, namely research that compiles the calculation process to make comparisons between the results of the actual process with these methods. Therefore, the Heuristic Schedule Generation algorithm method was chosen as the best method and can be applied in the company to minimize the make-span.Books on Demand GmbH, Überseering 33, 22297 Hamburg 88 pp. Englisch. Nº de ref. del artículo: 9786204206752

Contactar al vendedor

Comprar nuevo

EUR 39,90
Convertir moneda
Gastos de envío: EUR 60,00
De Alemania a Estados Unidos de America
Destinos, gastos y plazos de envío

Cantidad disponible: 2 disponibles

Añadir al carrito

Imagen del vendedor

Muhammad Arul Zaini
Publicado por LAP LAMBERT Academic Publishing, 2021
ISBN 10: 6204206753 ISBN 13: 9786204206752
Nuevo Taschenbuch
Impresión bajo demanda

Librería: AHA-BUCH GmbH, Einbeck, Alemania

Calificación del vendedor: 5 de 5 estrellas Valoración 5 estrellas, Más información sobre las valoraciones de los vendedores

Taschenbuch. Condición: Neu. nach der Bestellung gedruckt Neuware - Printed after ordering - As a result, there are still some schedules that are not precise, causing a large make-span. In observations made on 5 products, the company requires a total production time (make-span) of 11 hours 54 minutes in completing production activities. In this research, scheduling evaluation is conducted to minimize make-span using the Active Schedule Generation algorithm, Non-delay Schedule Generation and Heuristic Schedule Generation Algorithm The approach used is to use a quantitative-comparative approach, namely research that compiles the calculation process to make comparisons between the results of the actual process with these methods. Therefore, the Heuristic Schedule Generation algorithm method was chosen as the best method and can be applied in the company to minimize the make-span. Nº de ref. del artículo: 9786204206752

Contactar al vendedor

Comprar nuevo

EUR 40,89
Convertir moneda
Gastos de envío: EUR 60,75
De Alemania a Estados Unidos de America
Destinos, gastos y plazos de envío

Cantidad disponible: 1 disponibles

Añadir al carrito