Artículos relacionados a CIM. Computer Integrated Manufacturing: Towards the...

CIM. Computer Integrated Manufacturing: Towards the Factory of the Future - Tapa blanda

 
9783642973154: CIM. Computer Integrated Manufacturing: Towards the Factory of the Future

Esta edición ISBN ya no está disponible.

Sinopsis

A. The Meaning of the "I" in CIM.- I. Data and Operations Integration.- II. A Typical CIM Process Chain.- III. The CIM-Enterprise: The Computer Steered Industrial Firm.- IV. CIM Definitions.- B. The Components of CIM.- I. Stage of Development of CIM Components.- a. Production Planning and Control.- 1. Primary Data Management.- 2. Planning Levels.- 3. Degree of Implementation.- 4. New Approaches to PPC Systems.- 4.1 Simultaneous Material and Capacity Management.- 4.2 Load-Oriented Order Release.- 4.3 Kanban.- 4.4 Running Total Concept.- 4.5 MRP II.- 4.6 Decentralization.- b. Computer Aided Design (CAD).- 1. Tasks.- 2. Geometric Models.- 3. CAD Standard Interfaces.- 4. Interactive Control.- c. Computer Aided Planning (CAP).- 1. Work Scheduling for Conventional Processing.- 2. Work Scheduling for NC Machines.- d. Computer Aided Manufacturing (CAM).- 1. Automated Production.- 1.1 Machine Tools.- 1.2 Robots.- 1.3 Storage Systems.- 1.4 Conveyance Systems.- 2. Computerized Organizational Forms for Flexible Production.- 2.1 Processing Centers.- 2.2 Flexible Production Cells.- 2.3 Flexible Production Systems.- 2.4 Production and Assembly Islands.- 2.5 Flexible Transfer Lines.- e. Computer Aided Quality Assurance (CAQ).- f. Maintenance.- II. Interfaces Between CIM Components.- a. Data Relationships Between CAD and CAM.- b. Data Relationships Between PPC and CAD/CAM.- 1. Data Flow From CAD/CAM to PPC.- 1.1 Primary Data.- 1.2 Customer Order Data.- 1.3 Production Order Data.- 2. Data Flow From PPC to CAD/CAM.- 2.1 Primary Data.- 2.2 Customer Order Data.- 2.3 Production Order Data.- C. Implementation of CIM: CIM Information Management.- I. Procedures and Project Management for Developing a CIM Strategy.- II. Establishing Objectives.- III. Definition of CIM Process Chains.- a. Sub-Chain 1: Linking Planning and Control.- b. Sub-Chain 2: Linking CAD and CAM.- c. Sub-Chain 3: Linking Master Data Management (Product Description Database).- d. Sub-Chain 4: Linking Production Control and CAM.- e. Sub-Chain 5: Inter-Company Process Chains.- 1. PPC Integration.- 1.1 Initial Position.- 1.2 Data Exchange.- 1.3 Application Integration.- 1.4 General Effects.- 2. CAD/CAM Integration.- 2.1 Initial Position.- 2.2 Data Exchange.- 2.3 Application Integration.- 2.4 General Effects.- f. Sub-Chain 6: Linking Operative Systems with Accounting and Controlling Systems.- IV. Critical Success Factors.- V. CIM Function Levels.- a. Levels Concept.- b. Tasks of a CIM Level.- VI. Data Structures.- VII. Applications Software.- a. Standard Software.- b. In-House Development Using Pre-Fabricated Components and Standards.- c. Expert Systems in CIM.- 1. Structure and Areas of Application.- 2. Expert System for Design Stage Cost Estimation.- 2.1 Introduction.- 2.2 Structure and Mode of Operation of Expert Systems.- 2.2.1 Design Stage Cost Estimation in the Planning Phase.- 2.2.2 Design Stage Cost Estimation in Phase 2 of the Design Process.- 2.2.3 Design Stage Cost Estimation in Phase 3 of the Design Process.- 2.3 System Architecture.- VIII. Computer-Technical Model.- a. Hardware Architecture.- b. Integration Instruments.- 1. Organizational Solution.- 2. Use of Tools.- 2.1 Microcomputers/Workstations.- 2.2 Database Query.- 2.3 Networking of Computer Systems.- 2.3.1 Types of Network.- 2.3.2 The Aims of MAP.- 2.3.3 MAP Functions.- 2.3.4 Embedding of MAP in General Network Architectures.- 3. Data Exchange.- 4. Common Database.- 5. Inter-Application Communication.- c. CIM Data Handlers as Integration Bridges.- IX. Implementation Paths.- D. CIM Implementations.- I. CIM Solutions in the German Industry.- a. CIM Implementation at ABS Pumpen AG, Lohmar.- b. Information and Control System in the Production Area as a Central Agency for the Dataflow of a CIM concept at BMW AG, Dingolfing.- c. Computerized Flexible Production Chains for Pressed Sheet Metal Parts at MBB, Bremen.- d. CIM Implementation at Metabowerken, Nürtingen.- 1. Developing a CIM Strategy.- 2. Focal Areas of the Metab

"Sinopsis" puede pertenecer a otra edición de este libro.

  • EditorialSpringer
  • Año de publicación2014
  • ISBN 10 3642973159
  • ISBN 13 9783642973154
  • EncuadernaciónPaperback
  • IdiomaInglés
  • Contacto del fabricanteno disponible

(Ningún ejemplar disponible)

Buscar:



Crear una petición

¿No encuentra el libro que está buscando? Seguiremos buscando por usted. Si alguno de nuestros vendedores lo incluye en IberLibro, le avisaremos.

Crear una petición

Otras ediciones populares con el mismo título