This monograph deals with deterministic project scheduling with time windows for activities and with limited resources. In addition to project duration or makespan, a large number of mostly nonregular objective functions are considered, for example, net present value, earliness plus tardiness cost, cost of resources purchased or rented, or variation of resource utilization over time. A structural analysis of the different project scheduling problems is given and many exact and heuristic solution procedures with detailed performance analysis are presented, which exploit the specific problem structure. Moreover, some interesting applications to make-to-order production and batch production in process industries are investigated.
"Sinopsis" puede pertenecer a otra edición de este libro.
This monograph deals with deterministic project scheduling with time windows for activities and with limited resources. In addition to project duration or makespan, a large number of mostly nonregular objective functions are considered, for example, net present value, earliness plus tardiness cost, cost of resources purchased or rented, or variation of resource utilization over time. A structural analysis of the different project scheduling problems is given and many exact and heuristic solution procedures with detailed performance analysis are presented, which exploit the specific problem structure. Moreover, some interesting applications to make-to-order production and batch production in process industries are investigated.
"Sobre este título" puede pertenecer a otra edición de este libro.
Librería: CSG Onlinebuch GMBH, Darmstadt, Alemania
Softcover. Condición: Gut. Gebraucht - Gut Zustand: Gut, XI, 335 pp. About this book: The monograph deals with deterministic project scheduling with time windows for activities and with limited resources. In addition to project duration or makespan, a large number of mostly nonregular objective functions are considered, for example, net present value, earliness plus tardiness cost, cost of resources purchased or rented, or variation of resource utilization over time. A structural analysis of the different project scheduling problems is given and many exact and heuristic solution procedures with detailed performance analysis are presented, which exploit the specific problem structure. Moreover, some interesting applications to make-to-order production and batch production in process industries are investigated. Written for researchers. Nº de ref. del artículo: 16776
Cantidad disponible: 1 disponibles
Librería: Buchpark, Trebbin, Alemania
Condición: Sehr gut. Zustand: Sehr gut | Sprache: Englisch | Produktart: Bücher | Keine Beschreibung verfügbar. Nº de ref. del artículo: 628954/202
Cantidad disponible: 1 disponibles
Librería: Mispah books, Redhill, SURRE, Reino Unido
paperback. Condición: Very Good. Very Good. Dust Jacket may NOT BE INCLUDED.CDs may be missing. SHIPS FROM MULTIPLE LOCATIONS. book. Nº de ref. del artículo: ERICA82935404246363
Cantidad disponible: 1 disponibles