This book examines the Capacitated Lot Sizing Problem (CLSP) in process industries. In almost all process industries, there are situations where products have short/long setup times, and the setup of the product and its subsequent production are carried over, across consecutive periods. The setup of a product is carried over across more than one successive period in the case of products having long setup times. A product having short setup has its setup time less than the capacity of the period in which it is setup. The setup is immediately followed by its production of the product and it may also be carried over, across successive time period(s). Many process industries require production of a product to occur immediately after its setup (without the presence of idle time between the setup and production of the product), and they also require the product to be continuously produced without any interruption. This book considers a single-machine, single-level and multiple-item CLSP problem. This book introduces the Capacitated Lot Sizing Problem with Production Carryover and Setup Crossover across periods (CLSP-PCSC). Mathematical models are proposed which are all encompassing that they can handle continuous manufacturing (as in process industries), and also situations where the setup costs and holding costs are product dependent and time independent/time dependent, with possible backorders, and with other appropriate adaptations.  Comprehensive heuristics are proposed based on these mathematical models to solve the CLSP-PCSC. The performance of the proposed models and heuristics are evaluated using problem instances of various sizes. This book also covers mathematical models developed for the Capacitated Lot Sizing Problem with Production Carryover and Setup Crossover across periods, and with Sequence-Dependent Setup Times and Setup Costs (CLSP-SD-PCSC). These models allow the presence of backorders and also address real-life situations present in process industries such as production of a product starting immediately after its setup and its uninterrupted production carryover across periods, along with the presence of short/long setup times. Heuristics proposed for the CLSP-PCSC can be extended to address the CLSP problem with sequence dependent setup costs and setup times. All the models and heuristics proposed in this book address some real-life considerations present in process industries.

"Sinopsis" puede pertenecer a otra edición de este libro.

Acerca del autor

Ramya Ravi currently works in Caterpillar India Private Limited at Chennai, India. She completed Bachelor of Engineering in Electrical and Electronics Engineering at Sri Chandrasekharendra Saraswati Viswa Mahavidhyala University in 2008. She completed Master of Engineering in Industrial Engineering at Thiagarajar College of Engineering, Madurai (Anna University) in 2011. Thereafter, she received Ph.D. in Operations Management from IIT Madras in 2017. Her research interests include Supply Chain Management, Inventory Optimization, Production Planning and Scheduling, and Analytics. She has a publication in International Journal of Production Research, and she has attended international conferences, both in India and abroad. 
Chandrasekharan Rajendran is a Professor in the Department of Management Studies at IIT Madras, India. He holds RAGS Family Foundation Institute Chair in IIT Madras. He has been serving on the faculty of IIT Madras since 1987. His research interests include Operations and Supply Chain Management, Logistics and Distribution Management, Scheduling in Manufacturing and Service Systems, Optimization and Heuristic Techniques, Simulation Modeling, and Quality Management. He is a recipient of Alexander von Humboldt Research Fellowship of Germany and he is also a Visiting Professor in University of Passau, Germany. He has been conferred Dr. rer. pol. h.c. (Doctor of Business Administration and Economics (Honoris Causa)) by University of Passau for his outstanding achievements and contributions to research. He has been ranked among the best researchers, both in India and world-wide, in Operations Management. 
Hans Ziegler has his Diploma from University of Karlsruhe (TH) (now called Karlsruhe Institute of Technology), and PhD and Post-doctoral Habilitation from University of Paderborn. He had been on the faculty of Universities of Paderborn and Darmstadt, before moving to University of Passau where he holds the Chair for Production, Operations and Logistics Management (since 1991). He has research interests in Operations Research, Production and Operations Management, Supply Chain and Logistics Management, Scheduling in Manufacturing and Service Systems, and Inventory Management. Prof. Ziegler has publications in many renowned international journals such as Computers and Industrial Engineering, Computers and Operations Research, Engineering Costs and Production Economics, European Journal of Operational Research, International Journal of Advanced Manufacturing and Technology, International Journal of Production Research, Production Planning and Control, Operations Research Letters, OR Spektrum, and Zeitschrift fuer Operations Research.
Sanjay Mohapatra received his B.E. from NIT Rourkela, M.Tech from IIT Madras, PGDBM XIMB, India and has finished his Ph.D. from Utkal University, India under Management Department. At present, heis an Associate Professor in Information Systems in XIMB, India. Professor Mohapatra has more than 21 years of industry experience. He has worked in various capacities in organizations like Hindustan Aeronautics Limited, Larsen & Toubro, PricewaterHouse, Infosys, Polaris & J&B Software. His teaching interests are in IT Strategy and Management Information Systems and research interests are in the area of IT enabled processes. He has authored/co-authored nine books and more than twenty papers in peer reviewed international journals.
Dr. K.Ganesh is Senior Knowledge Expert and Global Lead of “supply chain management center of competence” at McKinsey & Company, Chennai, India. He has graduated in Production Engineering from Annamalai University with the university first rank. He pursued his Masters’ degree in Industrial Engineering at NIT Trichy and secured college first. He then moved to IIT Madras where he obtained his doctoral degree in Supply Chain. He is having total 14 years of research and consulting experience in the supply chain consulting and worked with top consulting firms such as TCS and IBM. He has published more than 100 papers in leading international research and written 10 international books. He is himself a lyricist and has written several poems in both English and Tamil.

De la contraportada

This book examines the Capacitated Lot Sizing Problem (CLSP) in process industries. In almost all process industries, there are situations where products have short/long setup times, and the setup of the product and its subsequent production are carried over, across consecutive periods. The setup of a product is carried over across more than one successive period in the case of products having long setup times. A product having short setup has its setup time less than the capacity of the period in which it is setup. The setup is immediately followed by its production of the product and it may also be carried over, across successive time period(s). Many process industries require production of a product to occur immediately after its setup (without the presence of idle time between the setup and production of the product), and they also require the product to be continuously produced without any interruption. This book considers a single-machine, single-level and multiple-item CLSP problem. This book introduces the Capacitated Lot Sizing Problem with Production Carryover and Setup Crossover across periods (CLSP-PCSC). Mathematical models are proposed which are all encompassing that they can handle continuous manufacturing (as in process industries), and also situations where the setup costs and holding costs are product dependent and time independent/time dependent, with possible backorders, and with other appropriate adaptations.  Comprehensive heuristics are proposed based on these mathematical models to solve the CLSP-PCSC. The performance of the proposed models and heuristics are evaluated using problem instances of various sizes. This book also covers mathematical models developed for the Capacitated Lot Sizing Problem with Production Carryover and Setup Crossover across periods, and with Sequence-Dependent Setup Times and Setup Costs (CLSP-SD-PCSC). These models allow the presence of backorders and also address real-life situations present in process industries such as production of a product starting immediately after its setup and its uninterrupted production carryover across periods, along with the presence of short/long setup times. Heuristics proposed for the CLSP-PCSC can be extended to address the CLSP problem with sequence dependent setup costs and setup times. All the models and heuristics proposed in this book address some real-life considerations present in process industries.

"Sobre este título" puede pertenecer a otra edición de este libro.

  • EditorialSpringer Nature Switzerland AG
  • Año de publicación2019
  • ISBN 10 3030012212
  • ISBN 13 9783030012212
  • EncuadernaciónTapa dura
  • IdiomaInglés
  • Número de edición1
  • Número de páginas232
  • Contacto del fabricanteno disponible

Comprar usado

Condición: Excelente
Zustand: Sehr gut | Seiten: 232...
Ver este artículo

EUR 6,90 gastos de envío desde Alemania a España

Destinos, gastos y plazos de envío

Comprar nuevo

Ver este artículo

EUR 11,00 gastos de envío desde Alemania a España

Destinos, gastos y plazos de envío

Resultados de la búsqueda para Capacitated Lot Sizing Problems in Process Industries

Imagen de archivo

Ravi Ramya, Chandrasekharan Rajendran, K. Ganesh, Sanjay Mohapatra, Hans Ziegler
Publicado por Springer International Publishing, 2019
ISBN 10: 3030012212 ISBN 13: 9783030012212
Antiguo o usado Tapa dura

Librería: Buchpark, Trebbin, Alemania

Calificación del vendedor: 5 de 5 estrellas Valoración 5 estrellas, Más información sobre las valoraciones de los vendedores

Condición: Sehr gut. Zustand: Sehr gut | Seiten: 232 | Sprache: Englisch | Produktart: Bücher. Nº de ref. del artículo: 32628358/2

Contactar al vendedor

Comprar usado

EUR 13,12
Convertir moneda
Gastos de envío: EUR 6,90
De Alemania a España
Destinos, gastos y plazos de envío

Cantidad disponible: 1 disponibles

Añadir al carrito

Imagen de archivo

Ramya, Ravi et al.
Publicado por Cham, Springer., 2019
ISBN 10: 3030012212 ISBN 13: 9783030012212
Antiguo o usado Tapa dura

Librería: Universitätsbuchhandlung Herta Hold GmbH, Berlin, Alemania

Calificación del vendedor: 4 de 5 estrellas Valoración 4 estrellas, Más información sobre las valoraciones de los vendedores

XXXV, 196 p. Hardcover. Versand aus Deutschland / We dispatch from Germany via Air Mail. Einband bestoßen, daher Mängelexemplar gestempelt, sonst sehr guter Zustand. Imperfect copy due to slightly bumped cover, apart from this in very good condition. Stamped. Sprache: Englisch. Nº de ref. del artículo: 34416AB

Contactar al vendedor

Comprar usado

EUR 19,00
Convertir moneda
Gastos de envío: EUR 10,00
De Alemania a España
Destinos, gastos y plazos de envío

Cantidad disponible: 1 disponibles

Añadir al carrito

Imagen del vendedor

Ravi Ramya
ISBN 10: 3030012212 ISBN 13: 9783030012212
Nuevo Tapa dura
Impresión bajo demanda

Librería: BuchWeltWeit Ludwig Meier e.K., Bergisch Gladbach, Alemania

Calificación del vendedor: 5 de 5 estrellas Valoración 5 estrellas, Más información sobre las valoraciones de los vendedores

Buch. Condición: Neu. This item is printed on demand - it takes 3-4 days longer - Neuware -This book examines the Capacitated Lot Sizing Problem (CLSP) in process industries. In almost all process industries, there are situations where products have short/long setup times, and the setup of the product and its subsequent production are carried over, across consecutive periods. The setup of a product is carried over across more than one successive period in the case of products having long setup times. A product having short setup has its setup time less than the capacity of the period in which it is setup. The setup is immediately followed by its production of the product and it may also be carried over, across successive time period(s). Many process industries require production of a product to occur immediately after its setup (without the presence of idle time between the setup and production of the product), and they also require the product to be continuously produced without any interruption. This book considers a single-machine, single-level and multiple-item CLSP problem. This book introduces the Capacitated Lot Sizing Problem with Production Carryover and Setup Crossover across periods (CLSP-PCSC). Mathematical models are proposed which are all encompassing that they can handle continuous manufacturing (as in process industries), and also situations where the setup costs and holding costs are product dependent and time independent/time dependent, with possible backorders, and with other appropriate adaptations. Comprehensive heuristics are proposed based on these mathematical models to solve the CLSP-PCSC. The performance of the proposed models and heuristics are evaluated using problem instances of various sizes. This book also covers mathematical models developed for the Capacitated Lot Sizing Problem with Production Carryover and Setup Crossover across periods, and with Sequence-Dependent Setup Times and Setup Costs (CLSP-SD-PCSC). These models allow the presence of backorders and also address real-life situations present in process industries such as production of a product starting immediately after its setup and its uninterrupted production carryover across periods, along with the presence of short/long setup times. Heuristics proposed for the CLSP-PCSC can be extended to address the CLSP problem with sequence dependent setup costs and setup times. All the models and heuristics proposed in this book address some real-life considerations present in process industries. 232 pp. Englisch. Nº de ref. del artículo: 9783030012212

Contactar al vendedor

Comprar nuevo

EUR 53,49
Convertir moneda
Gastos de envío: EUR 11,00
De Alemania a España
Destinos, gastos y plazos de envío

Cantidad disponible: 2 disponibles

Añadir al carrito

Imagen del vendedor

Ravi Ramya
Publicado por Springer International Publishing, 2019
ISBN 10: 3030012212 ISBN 13: 9783030012212
Nuevo Tapa dura

Librería: AHA-BUCH GmbH, Einbeck, Alemania

Calificación del vendedor: 5 de 5 estrellas Valoración 5 estrellas, Más información sobre las valoraciones de los vendedores

Buch. Condición: Neu. Druck auf Anfrage Neuware - Printed after ordering - This book examines the Capacitated Lot Sizing Problem (CLSP) in process industries. In almost all process industries, there are situations where products have short/long setup times, and the setup of the product and its subsequent production are carried over, across consecutive periods. The setup of a product is carried over across more than one successive period in the case of products having long setup times. A product having short setup has its setup time less than the capacity of the period in which it is setup. The setup is immediately followed by its production of the product and it may also be carried over, across successive time period(s). Many process industries require production of a product to occur immediately after its setup (without the presence of idle time between the setup and production of the product), and they also require the product to be continuously produced without any interruption. This book considers a single-machine, single-level and multiple-item CLSP problem. This book introduces the Capacitated Lot Sizing Problem with Production Carryover and Setup Crossover across periods (CLSP-PCSC). Mathematical models are proposed which are all encompassing that they can handle continuous manufacturing (as in process industries), and also situations where the setup costs and holding costs are product dependent and time independent/time dependent, with possible backorders, and with other appropriate adaptations. Comprehensive heuristics are proposed based on these mathematical models to solve the CLSP-PCSC. The performance of the proposed models and heuristics are evaluated using problem instances of various sizes. This book also covers mathematical models developed for the Capacitated Lot Sizing Problem with Production Carryover and Setup Crossover across periods, and with Sequence-Dependent Setup Times and Setup Costs (CLSP-SD-PCSC). These models allow the presence of backorders and also address real-life situations present in process industries such as production of a product starting immediately after its setup and its uninterrupted production carryover across periods, along with the presence of short/long setup times. Heuristics proposed for the CLSP-PCSC can be extended to address the CLSP problem with sequence dependent setup costs and setup times. All the models and heuristics proposed in this book address some real-life considerations present in process industries. Nº de ref. del artículo: 9783030012212

Contactar al vendedor

Comprar nuevo

EUR 53,49
Convertir moneda
Gastos de envío: EUR 11,99
De Alemania a España
Destinos, gastos y plazos de envío

Cantidad disponible: 1 disponibles

Añadir al carrito

Imagen del vendedor

Ravi Ramya
ISBN 10: 3030012212 ISBN 13: 9783030012212
Nuevo Tapa dura

Librería: buchversandmimpf2000, Emtmannsberg, BAYE, Alemania

Calificación del vendedor: 5 de 5 estrellas Valoración 5 estrellas, Más información sobre las valoraciones de los vendedores

Buch. Condición: Neu. Neuware -This book examines the Capacitated Lot Sizing Problem (CLSP) in process industries. In almost all process industries, there are situations where products have short/long setup times, and the setup of the product and its subsequent production are carried over, across consecutive periods. The setup of a product is carried over across more than one successive period in the case of products having long setup times. A product having short setup has its setup time less than the capacity of the period in which it is setup. The setup is immediately followed by its production of the product and it may also be carried over, across successive time period(s). Many process industries require production of a product to occur immediately after its setup (without the presence of idle time between the setup and production of the product), and they also require the product to be continuously produced without any interruption. This book considers a single-machine, single-level and multiple-item CLSP problem. This book introduces the Capacitated Lot Sizing Problem with Production Carryover and Setup Crossover across periods (CLSP-PCSC). Mathematical models are proposed which are all encompassing that they can handle continuous manufacturing (as in process industries), and also situations where the setup costs and holding costs are product dependent and time independent/time dependent, with possible backorders, and with other appropriate adaptations. Comprehensive heuristics are proposed based on these mathematical models to solve the CLSP-PCSC. The performance of the proposed models and heuristics are evaluated using problem instances of various sizes. This book also covers mathematical models developed for the Capacitated Lot Sizing Problem with Production Carryover and Setup Crossover across periods, and with Sequence-Dependent Setup Times and Setup Costs (CLSP-SD-PCSC). These models allow the presence of backorders and also address real-life situations present in process industries such as production of a product starting immediately after its setup and its uninterrupted production carryover across periods, along with the presence of short/long setup times. Heuristics proposed for the CLSP-PCSC can be extended to address the CLSP problem with sequence dependent setup costs and setup times. All the models and heuristics proposed in this book address some real-life considerations present in process industries.Springer Verlag GmbH, Tiergartenstr. 17, 69121 Heidelberg 232 pp. Englisch. Nº de ref. del artículo: 9783030012212

Contactar al vendedor

Comprar nuevo

EUR 53,49
Convertir moneda
Gastos de envío: EUR 35,00
De Alemania a España
Destinos, gastos y plazos de envío

Cantidad disponible: 2 disponibles

Añadir al carrito