Artículos relacionados a Project Scheduling and Cost Control: Planning, Monitoring...

Project Scheduling and Cost Control: Planning, Monitoring & Controlling the Baseline - Tapa dura

 
9781932159110: Project Scheduling and Cost Control: Planning, Monitoring & Controlling the Baseline

Sinopsis

New

"Sinopsis" puede pertenecer a otra edición de este libro.

Críticas

"With this book, Jim Taylor has captured the essence of project scheduling and cost control as a process versus just an activity, teaching the reader the true art and science of this vital process." -Bob McGannon, Director, Mindavation; "Finally, there is a book that describes the theoretical and practical applications of project schedule and cost planning and control covering the how and what it means for two difficult practical problems in all projects. This book explains, simply and practically, how to produce a schedule, create an estimate, and then execute the project. It is definitely an important resource for the new or experienced PM." -Joe R. "Chip" Stilwell, Stilwell and Associates of the USA, Inc.

Reseña del editor

Schedule and cost control are the key elements of successful project management. Yet, over 80% of all projects start with underestimated schedules and costs and are doomed to exceed projections before they begin. This clear and concise book demonstrates how to establish realistic estimates for successful project completion. It illustrates how to control a project's schedule and costs, but more importantly, it shows the reader how to develop the project's plans and processes so that controlling the schedule and costs are achievable goals.

"Sobre este título" puede pertenecer a otra edición de este libro.

  • EditorialJ Ross Publishing
  • Año de publicación2007
  • ISBN 10 1932159118
  • ISBN 13 9781932159110
  • EncuadernaciónTapa dura
  • IdiomaInglés
  • Número de páginas288

Comprar usado

Condición: Regular
Heavy wear. Ship within 24hrs....
Ver este artículo

GRATIS gastos de envío en Estados Unidos de America

Destinos, gastos y plazos de envío

Comprar nuevo

Ver este artículo

EUR 3,76 gastos de envío en Estados Unidos de America

Destinos, gastos y plazos de envío

Otras ediciones populares con el mismo título

9788131522363: Project Scheduling And Cost Control : Planning, Monitoring And Controlling The Baseline

Edición Destacada

ISBN 10:  8131522369 ISBN 13:  9788131522363
Tapa dura

Resultados de la búsqueda para Project Scheduling and Cost Control: Planning, Monitoring...

Imagen de archivo

Taylor, James
ISBN 10: 1932159118 ISBN 13: 9781932159110
Antiguo o usado Tapa dura

Librería: BooksRun, Philadelphia, PA, Estados Unidos de America

Calificación del vendedor: 5 de 5 estrellas Valoración 5 estrellas, Más información sobre las valoraciones de los vendedores

Hardcover. Condición: Fair. Illustrated. Heavy wear. Ship within 24hrs. Satisfaction 100% guaranteed. APO/FPO addresses supported. Nº de ref. del artículo: 1932159118-7-1-13

Contactar al vendedor

Comprar usado

EUR 7,89
Convertir moneda
Gastos de envío: GRATIS
A Estados Unidos de America
Destinos, gastos y plazos de envío

Cantidad disponible: 1 disponibles

Añadir al carrito

Imagen del vendedor

Taylor, James
Publicado por J. Ross Publishing, 2007
ISBN 10: 1932159118 ISBN 13: 9781932159110
Antiguo o usado Tapa dura

Librería: Zoom Books East, Glendale Heights, IL, Estados Unidos de America

Calificación del vendedor: 4 de 5 estrellas Valoración 4 estrellas, Más información sobre las valoraciones de los vendedores

Condición: good. Book is in good condition and may include underlining highlighting and minimal wear. The book can also include "From the library of" labels. May not contain miscellaneous items toys, dvds, etc. . We offer 100% money back guarantee and 24 7 customer service. Nº de ref. del artículo: ZEV.1932159118.G

Contactar al vendedor

Comprar usado

EUR 7,95
Convertir moneda
Gastos de envío: GRATIS
A Estados Unidos de America
Destinos, gastos y plazos de envío

Cantidad disponible: 1 disponibles

Añadir al carrito

Imagen de archivo

Taylor, James
Publicado por J. Ross Publishing, 2007
ISBN 10: 1932159118 ISBN 13: 9781932159110
Antiguo o usado Tapa dura

Librería: ThriftBooks-Dallas, Dallas, TX, Estados Unidos de America

Calificación del vendedor: 5 de 5 estrellas Valoración 5 estrellas, Más información sobre las valoraciones de los vendedores

Hardcover. Condición: Very Good. No Jacket. May have limited writing in cover pages. Pages are unmarked. ~ ThriftBooks: Read More, Spend Less 1.27. Nº de ref. del artículo: G1932159118I4N00

Contactar al vendedor

Comprar usado

EUR 9,49
Convertir moneda
Gastos de envío: GRATIS
A Estados Unidos de America
Destinos, gastos y plazos de envío

Cantidad disponible: 1 disponibles

Añadir al carrito

Imagen de archivo

Taylor, James
Publicado por J. Ross Publishing, 2007
ISBN 10: 1932159118 ISBN 13: 9781932159110
Antiguo o usado Tapa dura

Librería: Textbooks_Source, Columbia, MO, Estados Unidos de America

Calificación del vendedor: 5 de 5 estrellas Valoración 5 estrellas, Más información sobre las valoraciones de los vendedores

hardcover. Condición: Good. Illustrated. Ships in a BOX from Central Missouri! May not include working access code. Will not include dust jacket. Has used sticker(s) and some writing or highlighting. UPS shipping for most packages, (Priority Mail for AK/HI/APO/PO Boxes). Nº de ref. del artículo: 000876221U

Contactar al vendedor

Comprar usado

EUR 15,92
Convertir moneda
Gastos de envío: EUR 3,53
A Estados Unidos de America
Destinos, gastos y plazos de envío

Cantidad disponible: 7 disponibles

Añadir al carrito

Imagen del vendedor

Taylor, James
Publicado por J. Ross Publishing, 2008
ISBN 10: 1932159118 ISBN 13: 9781932159110
Antiguo o usado Tapa dura

Librería: Rosario Beach Rare Books, Lake Stevens, WA, Estados Unidos de America

Calificación del vendedor: 5 de 5 estrellas Valoración 5 estrellas, Más información sobre las valoraciones de los vendedores

Hardcover. Condición: Good. *Veteran-Owned, Family Run, Small Business in the Pacific Northwest* / roughly a dozen pages with highlighting; otherwise the book is in near fine condition. Nº de ref. del artículo: ABE-1703787382721

Contactar al vendedor

Comprar usado

EUR 20,42
Convertir moneda
Gastos de envío: GRATIS
A Estados Unidos de America
Destinos, gastos y plazos de envío

Cantidad disponible: 1 disponibles

Añadir al carrito

Imagen de archivo

Taylor, James
Publicado por J. Ross Publishing, 2007
ISBN 10: 1932159118 ISBN 13: 9781932159110
Nuevo Tapa dura

Librería: Grumpys Fine Books, Tijeras, NM, Estados Unidos de America

Calificación del vendedor: 5 de 5 estrellas Valoración 5 estrellas, Más información sobre las valoraciones de los vendedores

Hardcover. Condición: new. Prompt service guaranteed. Nº de ref. del artículo: Clean1932159118

Contactar al vendedor

Comprar nuevo

EUR 32,82
Convertir moneda
Gastos de envío: EUR 3,76
A Estados Unidos de America
Destinos, gastos y plazos de envío

Cantidad disponible: 1 disponibles

Añadir al carrito

Imagen del vendedor

Taylor, James C.
Publicado por J. Ross Publishing, 2007
ISBN 10: 1932159118 ISBN 13: 9781932159110
Antiguo o usado Tapa dura

Librería: GreatBookPrices, Columbia, MD, Estados Unidos de America

Calificación del vendedor: 5 de 5 estrellas Valoración 5 estrellas, Más información sobre las valoraciones de los vendedores

Condición: good. May show signs of wear, highlighting, writing, and previous use. This item may be a former library book with typical markings. No guarantee on products that contain supplements Your satisfaction is 100% guaranteed. Twenty-five year bookseller with shipments to over fifty million happy customers. Nº de ref. del artículo: 1728263-5

Contactar al vendedor

Comprar usado

EUR 41,41
Convertir moneda
Gastos de envío: EUR 2,34
A Estados Unidos de America
Destinos, gastos y plazos de envío

Cantidad disponible: 5 disponibles

Añadir al carrito

Imagen de archivo

Taylor, James
Publicado por J. Ross Publishing, 2007
ISBN 10: 1932159118 ISBN 13: 9781932159110
Nuevo Tapa dura

Librería: Textbooks_Source, Columbia, MO, Estados Unidos de America

Calificación del vendedor: 5 de 5 estrellas Valoración 5 estrellas, Más información sobre las valoraciones de los vendedores

hardcover. Condición: New. Illustrated. Ships same day or next business day! UPS shipping available (Priority Mail for AK/HI/APO/PO Boxes). Used sticker and some writing and/or highlighting. Used books may not include working access code. Used books will not include dust jackets. Nº de ref. del artículo: 000876221N

Contactar al vendedor

Comprar nuevo

EUR 40,31
Convertir moneda
Gastos de envío: EUR 3,53
A Estados Unidos de America
Destinos, gastos y plazos de envío

Cantidad disponible: 2 disponibles

Añadir al carrito

Imagen del vendedor

Taylor, James C.
Publicado por J. Ross Publishing, 2007
ISBN 10: 1932159118 ISBN 13: 9781932159110
Antiguo o usado Tapa dura

Librería: GreatBookPrices, Columbia, MD, Estados Unidos de America

Calificación del vendedor: 5 de 5 estrellas Valoración 5 estrellas, Más información sobre las valoraciones de los vendedores

Condición: As New. Unread book in perfect condition. Nº de ref. del artículo: 1728263

Contactar al vendedor

Comprar usado

EUR 54,56
Convertir moneda
Gastos de envío: EUR 2,34
A Estados Unidos de America
Destinos, gastos y plazos de envío

Cantidad disponible: Más de 20 disponibles

Añadir al carrito

Imagen del vendedor

Taylor, James C.
Publicado por J. Ross Publishing, 2007
ISBN 10: 1932159118 ISBN 13: 9781932159110
Nuevo Tapa dura

Librería: GreatBookPrices, Columbia, MD, Estados Unidos de America

Calificación del vendedor: 5 de 5 estrellas Valoración 5 estrellas, Más información sobre las valoraciones de los vendedores

Condición: New. Nº de ref. del artículo: 1728263-n

Contactar al vendedor

Comprar nuevo

EUR 57,21
Convertir moneda
Gastos de envío: EUR 2,34
A Estados Unidos de America
Destinos, gastos y plazos de envío

Cantidad disponible: Más de 20 disponibles

Añadir al carrito

Existen otras 12 copia(s) de este libro

Ver todos los resultados de su búsqueda