Artículos relacionados a Resources-constrained Project Scheduling

Resources-constrained Project Scheduling - Tapa dura

 
9781905209729: Resources-constrained Project Scheduling

Esta edición ISBN ya no está disponible.

Sinopsis

This title presents a large variety of models and algorithms dedicated to the resource-constrained project scheduling problem (RCPSP), which aims at scheduling at minimal duration a set of activities subject to precedence constraints and limited resource availabilities. In the first part, the standard variant of RCPSP is presented and analyzed as a combinatorial optimization problem. Constraint programming and integer linear programming formulations are given. Relaxations based on these formulations and also on related scheduling problems are presented. Exact methods and heuristics are surveyed. Computational experiments, aiming at providing an empirical insight on the difficulty of the problem, are provided. The second part of the book focuses on several other variants of the RCPSP and on their solution methods. Each variant takes account of real-life characteristics which are not considered in the standard version, such as possible interruptions of activities, production and consumption of resources, cost-based approaches and uncertainty considerations. The last part presents industrial case studies where the RCPSP plays a central part. Applications are presented in various domains such as assembly shop and rolling ingots production scheduling, project management in information technology companies and instruction scheduling for VLIW processor architectures.

"Sinopsis" puede pertenecer a otra edición de este libro.

Acerca del autor

Christian Artigues is a researcher at the Laboratory for Analysis and Architecture of Systems (LAAS) of the French National Institute for Scientific Research (CNRS). Sophie Demassey is an Assistant Professor at the School of Mining Engineering (EMN), Nantes, France. Emmanuel Neron is Assistant Professor at the Computer Science Department of Polytech'Tours, France, and is a member of the Computer Science Laboratory of the University of Tours, France.

"Sobre este título" puede pertenecer a otra edición de este libro.

(Ningún ejemplar disponible)

Buscar:



Crear una petición

¿No encuentra el libro que está buscando? Seguiremos buscando por usted. Si alguno de nuestros vendedores lo incluye en IberLibro, le avisaremos.

Crear una petición

Otras ediciones populares con el mismo título

9781848210349: Resource-Constrained Project Scheduling: Models, Algorithms, Extensions and Applications (Control Systems, Robotics, and Manufacturing)

Edición Destacada

ISBN 10:  1848210345 ISBN 13:  9781848210349
Editorial: ISTE Ltd and John Wiley & So..., 2008
Tapa dura