This report provides key results from a 30-month research and development project to study the effects of normal aging on the calibration and response time of nuclear plant pressure, level, and flow transmitters and to develop and validate new methods for testing the performance of the transmitters as installed in nuclear power plants. The project focused on aging tests of complete transmitter assemblies and critical transmitter components; testing the effects of sensing-line length, blockages, and voids on pressure sensor response time; investigating the oil loss phenomenon in Rosemount and other transmitters; validating new methods for on-line testing of pressure transmitter response time; investigating on-line detection of oil loss in Rosemount transmitters; and analyzing Licensee Event Report and Nuclear Plant Reliability Data System databases for pressure sensor failures in nuclear power plants. The authors demonstrated that the practice of response time testing and calibration once every 18 to 24 months is adequate for managing the normal aging of pressure transmitters.
"Sinopsis" puede pertenecer a otra edición de este libro.
This report provides key results from a 30-month research and development project to study the effects of normal aging on the calibration and response time of nuclear plant pressure, level, and flow transmitters and to develop and validate new methods for testing the performance of the transmitters as installed in nuclear power plants. The project focused on aging tests of complete transmitter assemblies and critical transmitter components; testing the effects of sensing-line length, blockages, and voids on pressure sensor response time; investigating the oil loss phenomenon in Rosemount and other transmitters; validating new methods for on-line testing of pressure transmitter response time; investigating on-line detection of oil loss in Rosemount transmitters; and analyzing Licensee Event Report and Nuclear Plant Reliability Data System databases for pressure sensor failures in nuclear power plants. The authors demonstrated that the practice of response time testing and calibration once every 18 to 24 months is adequate for managing the normal aging of pressure transmitters.
"Sobre este título" puede pertenecer a otra edición de este libro.
Librería: GreatBookPrices, Columbia, MD, Estados Unidos de America
Condición: New. Nº de ref. del artículo: 37415549-n
Cantidad disponible: Más de 20 disponibles
Librería: California Books, Miami, FL, Estados Unidos de America
Condición: New. Print on Demand. Nº de ref. del artículo: I-9781499576924
Cantidad disponible: Más de 20 disponibles
Librería: GreatBookPrices, Columbia, MD, Estados Unidos de America
Condición: As New. Unread book in perfect condition. Nº de ref. del artículo: 37415549
Cantidad disponible: Más de 20 disponibles
Librería: GreatBookPricesUK, Woodford Green, Reino Unido
Condición: As New. Unread book in perfect condition. Nº de ref. del artículo: 37415549
Cantidad disponible: Más de 20 disponibles
Librería: GreatBookPricesUK, Woodford Green, Reino Unido
Condición: New. Nº de ref. del artículo: 37415549-n
Cantidad disponible: Más de 20 disponibles
Librería: THE SAINT BOOKSTORE, Southport, Reino Unido
Paperback / softback. Condición: New. This item is printed on demand. New copy - Usually dispatched within 5-9 working days. Nº de ref. del artículo: C9781499576924
Cantidad disponible: Más de 20 disponibles