Artículos relacionados a Setup Optimization and Workload Balancing: For Mixed-Model...

Setup Optimization and Workload Balancing: For Mixed-Model Electronics Assembly Operations (Classic Reprint) - Tapa blanda

Balakrishnan, Anantaram

 
9781332281596: Setup Optimization and Workload Balancing: For Mixed-Model Electronics Assembly Operations (Classic Reprint)

Sinopsis

Excerpt from Setup Optimization and Workload Balancing: For Mixed-Model Electronics Assembly Operations

This paper addresses a medium-term, tactical decision facing high mix, low volume electronics assembly facilities containing several surface mount assembly modules (one or more placement machines in series, see Section Operating in parallel, possibly at different sites. We consider facilities in which each module can assemble several different products (with appropriate setups), and modules have overlapping capabilities, i.e for each product, we have a choice Of modules to assemble that product. Furthermore, the demand for individual products is not adequate to justify using dedicated, single-product modules. Operations with these characteristics, which we refer to as mixed-model assembly operations, are common in companies producing electronic subsystems for applications such as telecommunications, computer peripherals, consumer electronics, and medical systems. We will focus on the component placement Operation since the automatic placement machines are very expensive and also require considerable setup time. For convenience, we use the words machine, module, and line interchangeably. Given the equipment configuration and capacity of each machine, and the projected demand for various products, the tactical plan determines which products to assemble on each machine.

In making this tactical decision, managers must address two conflicting objectives reducing the setup or changeover times, and distributing the workload evenly across the parallel machines (relative to their available capacities). When lot sizes are small (say, tens or hundreds of boards per lot), equipment changeover times can equal or exceed the actual processing (placement) times. For instance, the time to change over production from one board type to another on a placement machine can vary from 15 minutes to over an hourdepending on the number of new components to be loaded, whereas placing all the components for a batch of 50 boards with, say, 200 placements per board, might require less than an hour of processing time. Reducing setup times is, therefore, an important concern both to increase productive capacity, and to provide quick response with minimal inventories. On the other hand, balancing the workload has several benefits including reducing overtime expenses, decreasing the lead time to supply board sets multiple board types that are assembled into a single unit) for final assembly, and providing safety capacity on each machine to accommodate contingencies. These two Objectives can be contradictory. To minimize total setup time, we might assign products that share many common components to the same machine; however, this strategy of grouping products solely based on component commonality can result in imbalances due to uneven group sizes.

About the Publisher

Forgotten Books publishes hundreds of thousands of rare and classic books. Find more at www.forgottenbooks.com

This book is a reproduction of an important historical work. Forgotten Books uses state-of-the-art technology to digitally reconstruct the work, preserving the original format whilst repairing imperfections present in the aged copy. In rare cases, an imperfection in the original, such as a blemish or missing page, may be replicated in our edition. We do, however, repair the vast majority of imperfections successfully; any imperfections that remain are intentionally left to preserve the state of such historical works.

"Sinopsis" puede pertenecer a otra edición de este libro.

Reseña del editor

Excerpt from Setup Optimization and Workload Balancing: For Mixed-Model Electronics Assembly Operations

This paper addresses a medium-term, tactical decision facing high mix, low volume electronics assembly facilities containing several surface mount assembly modules (one or more placement machines in series, see Section Operating in parallel, possibly at different sites. We consider facilities in which each module can assemble several different products (with appropriate setups), and modules have overlapping capabilities, i.e for each product, we have a choice Of modules to assemble that product. Furthermore, the demand for individual products is not adequate to justify using dedicated, single-product modules. Operations with these characteristics, which we refer to as mixed-model assembly operations, are common in companies producing electronic subsystems for applications such as telecommunications, computer peripherals, consumer electronics, and medical systems. We will focus on the component placement Operation since the automatic placement machines are very expensive and also require considerable setup time. For convenience, we use the words machine, module, and line interchangeably. Given the equipment configuration and capacity of each machine, and the projected demand for various products, the tactical plan determines which products to assemble on each machine.

In making this tactical decision, managers must address two conflicting objectives reducing the setup or changeover times, and distributing the workload evenly across the parallel machines (relative to their available capacities). When lot sizes are small (say, tens or hundreds of boards per lot), equipment changeover times can equal or exceed the actual processing (placement) times. For instance, the time to change over production from one board type to another on a placement machine can vary from 15 minutes to over an hourdepending on the number of new components to be loaded, whereas placing all the components for a batch of 50 boards with, say, 200 placements per board, might require less than an hour of processing time. Reducing setup times is, therefore, an important concern both to increase productive capacity, and to provide quick response with minimal inventories. On the other hand, balancing the workload has several benefits including reducing overtime expenses, decreasing the lead time to supply board sets multiple board types that are assembled into a single unit) for final assembly, and providing safety capacity on each machine to accommodate contingencies. These two Objectives can be contradictory. To minimize total setup time, we might assign products that share many common components to the same machine; however, this strategy of grouping products solely based on component commonality can result in imbalances due to uneven group sizes.

About the Publisher

Forgotten Books publishes hundreds of thousands of rare and classic books. Find more at www.forgottenbooks.com

This book is a reproduction of an important historical work. Forgotten Books uses state-of-the-art technology to digitally reconstruct the work, preserving the original format whilst repairing imperfections present in the aged copy. In rare cases, an imperfection in the original, such as a blemish or missing page, may be replicated in our edition. We do, however, repair the vast majority of imperfections successfully; any imperfections that remain are intentionally left to preserve the state of such historical works.

Reseña del editor

Excerpt from Setup Optimization and Workload Balancing: For Mixed-Model Electronics Assembly Operations

To cope with the rapid technological advances, product proliferation, shorter product lifecycles, and increasing competition, electronics companies are adopting flexible assembly strategies using multiple surface mount assembly modules to produce many different products in small batches. The component placement machines account for over half the investment in surface mount assembly lines, and also require considerable setup time (comparable to the actual processing time for small lot sizes) to changeover production from one product to another. This paper addresses a tactical planning problem for high mix, low volume electronics assembly facilities containing several placement machines (modules) operating in parallel. We propose an optimization model to decide which product families to assemble on each machine in order to minimize the total setup cost per demand period while ensuring that none of the machines is overloaded. Unlike strategic and operational models that emphasize either workload balancing or setup optimization, our tactical planning model simultaneously considers both these conflicting factors. To capture the impact of product grouping decisions on setup cost, we consider a partial set up policy that is both easy to implement in practice, and convenient to incorporate in the tactical planning model. The policy consists of reserving certain slots on each placement machine for permanent components, and loading the remaining components as needed to assemble each product.

We formulate the tactical planning problem as an integer program, and show that even the special case of minimizing the setup cost on a single machine for a given assignment of products is NP-hard. For the general model, we develop an optimization-based method, combining column generation, heusristics, and lower bounding procedures, to approximately solve the problem and assess the quality of the solution. As part of our development, we describe solution methods for two practical subproblems - a single machine, product selection subproblem, and the setup optimization subproblem - that might apply directly to short-term production planning. Our computational experience with medium-sized test problems provides insights regarding the effective implementation of column generation strategies in this problem context, and identifies some opportunities for improvement.

About the Publisher

Forgotten Books publishes hundreds of thousands of rare and classic books. Find more at www.forgottenbooks.com

This book is a reproduction of an important historical work. Forgotten Books uses state-of-the-art technology to digitally reconstruct the work, preserving the original format whilst repairing imperfections present in the aged copy. In rare cases, an imperfection in the original, such as a blemish or missing page, may be replicated in our edition. We do, however, repair the vast majority of imperfections successfully; any imperfections that remain are intentionally left to preserve the state of such historical works.

"Sobre este título" puede pertenecer a otra edición de este libro.

Sus derechos de garantía legal: Todos los consumidores de la UE se benefician de al menos dos años de protección de garantía legal para cualquier bien de consumo que se venda en la UE. Ver más