The subject selected for this 2013 study is the Space Elevator Tether Climber. The objective of the one year study was to survey current concepts and technologies related to tether climbers, identify critical issues, questions, and concerns, assess their impact on the development of space elevators, and project towards the future. The following are a few of the conclusions: • The study used the concept of “constant power” as a baseline because of its ability to lower design requirements on the tether climber. • The mass breakout of 6 MT for a climber and 14 MT for customer payloads seems feasible. The estimate is that with a travel time of one week to GEO seven tether climbers can be on a tether simultaneously. • The communication architecture should be integrated into the space elevator infrastructure and nodal layout. • Solar power, as the sole source, appears achievable. • The use of laser power as the sole source also seems achievable.
"Sinopsis" puede pertenecer a otra edición de este libro.
The subject selected for this 2013 study is the Space Elevator Tether Climber. The objective of the one year study was to survey current concepts and technologies related to tether climbers, identify critical issues, questions, and concerns, assess their impact on the development of space elevators, and project towards the future. The following are a few of the conclusions: · The study used the concept of "constant power" as a baseline because of its ability to lower design requirements on the tether climber. · The mass breakout of 6 MT for a climber and 14 MT for customer payloads seems feasible. The estimate is that with a travel time of one week to GEO seven tether climbers can be on a tether simultaneously. · The communication architecture should be integrated into the space elevator infrastructure and nodal layout. · Solar power, as the sole source, appears achievable. · The use of laser power as the sole source also seems achievable.
"Sobre este título" puede pertenecer a otra edición de este libro.
EUR 0,73 gastos de envío desde Estados Unidos de America a España
Destinos, gastos y plazos de envíoLibrería: PBShop.store US, Wood Dale, IL, Estados Unidos de America
PAP. Condición: New. New Book. Shipped from UK. THIS BOOK IS PRINTED ON DEMAND. Established seller since 2000. Nº de ref. del artículo: L0-9781312099821
Cantidad disponible: Más de 20 disponibles
Librería: PBShop.store UK, Fairford, GLOS, Reino Unido
PAP. Condición: New. New Book. Delivered from our UK warehouse in 4 to 14 business days. THIS BOOK IS PRINTED ON DEMAND. Established seller since 2000. Nº de ref. del artículo: L0-9781312099821
Cantidad disponible: Más de 20 disponibles
Librería: Ria Christie Collections, Uxbridge, Reino Unido
Condición: New. In. Nº de ref. del artículo: ria9781312099821_new
Cantidad disponible: Más de 20 disponibles
Librería: THE SAINT BOOKSTORE, Southport, Reino Unido
Paperback / softback. Condición: New. This item is printed on demand. New copy - Usually dispatched within 5-9 working days 262. Nº de ref. del artículo: C9781312099821
Cantidad disponible: Más de 20 disponibles
Librería: Chiron Media, Wallingford, Reino Unido
PF. Condición: New. Nº de ref. del artículo: 6666-IUK-9781312099821
Cantidad disponible: 10 disponibles
Librería: Majestic Books, Hounslow, Reino Unido
Condición: New. Print on Demand pp. 94 6:B&W 8.25 x 11 in or 280 x 210 mm Perfect Bound on White w/Gloss Lam. Nº de ref. del artículo: 131459020
Cantidad disponible: 4 disponibles
Librería: Books Puddle, New York, NY, Estados Unidos de America
Condición: New. pp. 94. Nº de ref. del artículo: 26128079891
Cantidad disponible: 4 disponibles
Librería: AHA-BUCH GmbH, Einbeck, Alemania
Taschenbuch. Condición: Neu. nach der Bestellung gedruckt Neuware - Printed after ordering - The subject selected for this 2013 study is the Space Elevator Tether Climber. The objective of the one year study was to survey current concepts and technologies related to tether climbers, identify critical issues, questions, and concerns, assess their impact on the development of space elevators, and project towards the future. The following are a few of the conclusions:¿ The study used the concept of 'constant power' as a baseline because of its ability to lower design requirements on the tether climber.¿ The mass breakout of 6 MT for a climber and 14 MT for customer payloads seems feasible. The estimate is that with a travel time of one week to GEO seven tether climbers can be on a tether simultaneously.¿ The communication architecture should be integrated into the space elevator infrastructure and nodal layout.¿ Solar power, as the sole source, appears achievable.¿ The use of laser power as the sole source also seems achievable. Nº de ref. del artículo: 9781312099821
Cantidad disponible: 1 disponibles
Librería: Biblios, Frankfurt am main, HESSE, Alemania
Condición: New. PRINT ON DEMAND pp. 94. Nº de ref. del artículo: 18128079897
Cantidad disponible: 4 disponibles
Librería: Lucky's Textbooks, Dallas, TX, Estados Unidos de America
Condición: New. Nº de ref. del artículo: ABLIING23Mar2411530045798
Cantidad disponible: Más de 20 disponibles