This report summarizes the lessons learned from the nine pilot site visits that were performed to review early implementation of the maintenance rule using the draft NRC Maintenance Inspection Procedure. Licensees followed NUMARC 93-01, "Industry Guideline for Monitoring the Effectiveness of Maintenance at Nuclear Power Plants." In general, the licensees were thorough in determining which structures, systems, and components (SSCs) were within the scope of the maintenance rule at each site. The use of an expert panel was an appropriate and practical method of determining which SSCs are risk significant. When setting goals, all licensees considered safety but many licensees did not consider operating experience throughout the industry. Although required to do so, licensees were not monitoring at the system or train level the performance or condition for some systems used in standby service but not significant to risk. Most licensees had not established adequate monitoring of structures under the rule. Licensees established reasonable plans for doing periodic evaluations, balancing unavailability and reliability, and assessing the effect of taking equipment out of service for maintenance. However, these plans were not evaluated because they had not been fully implemented at the time of the site visits.
"Sinopsis" puede pertenecer a otra edición de este libro.
This report summarizes the lessons learned from the nine pilot site visits that were performed to review early implementation of the maintenance rule using the draft NRC Maintenance Inspection Procedure. Licensees followed NUMARC 93-01, "Industry Guideline for Monitoring the Effectiveness of Maintenance at Nuclear Power Plants." In general, the licensees were thorough in determining which structures, systems, and components (SSCs) were within the scope of the maintenance rule at each site. The use of an expert panel was an appropriate and practical method of determining which SSCs are risk significant. When setting goals, all licensees considered safety but many licensees did not consider operating experience throughout the industry. Although required to do so, licensees were not monitoring at the system or train level the performance or condition for some systems used in standby service but not significant to risk. Most licensees had not established adequate monitoring of structures under the rule. Licensees established reasonable plans for doing periodic evaluations, balancing unavailability and reliability, and assessing the effect of taking equipment out of service for maintenance. However, these plans were not evaluated because they had not been fully implemented at the time of the site visits.
"Sobre este título" puede pertenecer a otra edición de este libro.
EUR 19,49 gastos de envío desde Alemania a España
Destinos, gastos y plazos de envíoLibrería: moluna, Greven, Alemania
Condición: New. KlappentextThis report summarizes the lessons learned from the nine pilot site visits that were performed to review early implementation of the maintenance rule using the draft NRC Maintenance Inspection Procedure. Licensees followed NUM. Nº de ref. del artículo: 6548614
Cantidad disponible: Más de 20 disponibles
Librería: THE SAINT BOOKSTORE, Southport, Reino Unido
Paperback / softback. Condición: New. This item is printed on demand. New copy - Usually dispatched within 5-9 working days 139. Nº de ref. del artículo: C9781286861745
Cantidad disponible: Más de 20 disponibles
Librería: Lucky's Textbooks, Dallas, TX, Estados Unidos de America
Condición: New. Nº de ref. del artículo: ABLING22Oct2517050408533
Cantidad disponible: Más de 20 disponibles