Artículos relacionados a Project Scheduling to Maximize Positive Impacts of...

Project Scheduling to Maximize Positive Impacts of Reconstruction Operations - Tapa blanda

Chaney, Andrew D.

 
9781249835059: Project Scheduling to Maximize Positive Impacts of Reconstruction Operations

Sinopsis

Since the decline of the Cold War, the risk of major con-ict between powerful industrialized nations has signi cantly decreased. Insecurity in the twenty- rst century is forecast to arise rather from the debris of imploding states. Such situations may require intervention | military or otherwise | by concerned states, and the frequency with which these interventions occur is increasing. To meet this new operational challenge, the US military must adapt its planning procedures to account for Security, Stabilization, Transition, and Reconstruction Operations (SSTRO).

"Sinopsis" puede pertenecer a otra edición de este libro.

Reseña del editor

Since the decline of the Cold War, the risk of major con-ict between powerful industrialized nations has signi cantly decreased. Insecurity in the twenty- rst century is forecast to arise rather from the debris of imploding states. Such situations may require intervention | military or otherwise | by concerned states, and the frequency with which these interventions occur is increasing. To meet this new operational challenge, the US military must adapt its planning procedures to account for Security, Stabilization, Transition, and Reconstruction Operations (SSTRO).

"Sobre este título" puede pertenecer a otra edición de este libro.

Sus derechos de garantía legal: Todos los consumidores de la UE se benefician de al menos dos años de protección de garantía legal para cualquier bien de consumo que se venda en la UE. Ver más