In order to facilitate U. S. national security strategy, the U. S. Military has a renewed focus on conducting Stability Operations. These complex operations often take place over long periods and involve various different, but interrelated tasks. Current methods of planning require subjective analysis and previous experiences to determine prioritization when allocating limited resources. Successfully used in civilian industry as a way to plan and execute complex projects, the critical path method might apply to stability operations. The research attempted to determine if applying the critical path method would assist in developing and conducting stability operations. The research includes a review of literature outlining current national strategic requirements for conducting stability operations, followed by a description of current planning methods and a systematic method to apply critical path method to stability operations. After conducting an analytical wargame on three conditions of a case study using the War in Iraq, the conclusion was that combining doctrinal, traditional lines of effort with the application of the critical path method can assist future stability operations.
"Sinopsis" puede pertenecer a otra edición de este libro.
In order to facilitate U. S. national security strategy, the U. S. Military has a renewed focus on conducting Stability Operations. These complex operations often take place over long periods and involve various different, but interrelated tasks. Current methods of planning require subjective analysis and previous experiences to determine prioritization when allocating limited resources. Successfully used in civilian industry as a way to plan and execute complex projects, the critical path method might apply to stability operations. The research attempted to determine if applying the critical path method would assist in developing and conducting stability operations. The research includes a review of literature outlining current national strategic requirements for conducting stability operations, followed by a description of current planning methods and a systematic method to apply critical path method to stability operations. After conducting an analytical wargame on three conditions of a case study using the War in Iraq, the conclusion was that combining doctrinal, traditional lines of effort with the application of the critical path method can assist future stability operations.
Joseph S. Cooper is originally from Buffalo, New York. He is the recipient of an M.F.A. from Naropa University. His most recent publications include The American Drivel Review, Big Game Books, BlazeVox 2k6, BOMBAY GIN, Dusie Press, Hot Whiskey Magazine, Small Town, and String of Small Machines. His chapbook entitled Insuring the Wicker Man Shadow Created Delusion, co-authored with Jared Hayes, was published by Hot Whiskey Press in 2005.
"Sobre este título" puede pertenecer a otra edición de este libro.
Librería: Mispah books, Redhill, SURRE, Reino Unido
Paperback. Condición: Like New. Like New. book. Nº de ref. del artículo: ERICA79612493684136
Cantidad disponible: 1 disponibles