Design criteria for the construction or rehabilitation of dams and hydraulic structures generally begin with a section defining the design flood. Flood determination methods have evolved over the years, but must continue to progress given the degree of uncertainty surrounding the assessment of extreme floods and the fact that factors external to flooding must be taken into account in risk assessment. This ICOLD Bulletin 187 follows in the footsteps of the previous one. It consists of three main chapters following the introductory chapter. The second chapter examines the main aspects of flood volume. The third chapter follows on from the previous bulletin and looks in more detail at stochastic approaches to flood risk assessment. The final chapter deals with the forecasting aspects of proactive flood management. Case studies illustrating short-, medium- and long-term management challenges are presented in Appendix A.
Les critères de conception pour la construction ou la réhabilitation des barrages et des structures hydrauliques commencent généralement par une section définissant la crue de projet. Les méthodes de détermination des crues ont évolué au fil des ans, mais elles doivent continuer à progresser étant donné le degré d'incertitude concernant l'évaluation des crues extrêmes et le fait que les facteurs externes aux crues doivent être pris en compte dans l'évaluation des risques. Ce ICOLD Bulletin 187 suit les traces du précédent bulletin. Il se compose de trois chapitres principaux faisant suite au chapitre d'introduction. Le deuxième chapitre examine les principaux aspects liés au volume des crues. Le troisième chapitre fait suite au bulletin précédent et aborde plus en détail les approches stochastiques concernant l'évaluation des risques de crues. Le dernier chapitre traite des aspects prévisionnels liés à la gestion proactive des crues. Des études de cas illustrant les défis de gestion à court, moyen ou long terme sont présentées à l'annexe A.
"Sinopsis" puede pertenecer a otra edición de este libro.
The Commission Internationale des Grands Barrages (CIGB) / International Commission on Large Dams (ICOLD) is a non-governmental International Organization which provides a forum for the exchange of knowledge and experience in dam engineering.
The Organization leads the profession in ensuring that dams are built safely, efficiently, economically, and without detrimental effects on the environment. Its original aim was to encourage advances in the planning, design, construction, operation, and maintenance of large dams and their associated civil works, by collecting and disseminating relevant information and by studying related technical questions.
Since the late sixties, focus was put on subjects of current concern such as dam safety, monitoring of performance, reanalysis of older dams and spillways, effects of ageing and environmental impact. More recently, new subjects include cost studies at the planning and construction stages, harnessing international rivers, information for the public at large, and financing.
"Sobre este título" puede pertenecer a otra edición de este libro.
Librería: Basi6 International, Irving, TX, Estados Unidos de America
Condición: Brand New. New. US edition. Expediting shipping for all USA and Europe orders excluding PO Box. Excellent Customer Service. Nº de ref. del artículo: ABEOCT25-311260
Cantidad disponible: 5 disponibles
Librería: GreatBookPrices, Columbia, MD, Estados Unidos de America
Condición: As New. Unread book in perfect condition. Nº de ref. del artículo: 49461081
Cantidad disponible: 10 disponibles
Librería: BuchWeltWeit Ludwig Meier e.K., Bergisch Gladbach, Alemania
Taschenbuch. Condición: Neu. This item is printed on demand - it takes 3-4 days longer - Neuware -Design criteria for the construction or rehabilitation of dams and hydraulic structures generally begin with a section defining the design flood. Flood determination methods have evolved over the years, but must continue to progress given the degree of uncertainty surrounding the assessment of extreme floods and the fact that factors external to flooding must be taken into account in risk assessment. This ICOLD Bulletin 187 follows in the footsteps of the previous one. It consists of three main chapters following the introductory chapter. The second chapter examines the main aspects of flood volume. The third chapter follows on from the previous bulletin and looks in more detail at stochastic approaches to flood risk assessment. The final chapter deals with the forecasting aspects of proactive flood management. Case studies illustrating short-, medium- and long-term management challenges are presented in Appendix A.Les critères de conception pour la construction ou la réhabilitation des barrages et des structures hydrauliques commencent généralement par une section définissant la crue de projet. Les méthodes de détermination des crues ont évolué au fil des ans, mais elles doivent continuer à progresser étant donné le degré d'incertitude concernant l'évaluation des crues extrêmes et le fait que les facteurs externes aux crues doivent être pris en compte dans l'évaluation des risques. Ce ICOLD Bulletin 187 suit les traces du précédent bulletin. Il se compose de trois chapitres principaux faisant suite au chapitre d'introduction. Le deuxième chapitre examine les principaux aspects liés au volume des crues. Le troisième chapitre fait suite au bulletin précédent et aborde plus en détail les approches stochastiques concernant l'évaluation des risques de crues. Le dernier chapitre traite des aspects prévisionnels liés à la gestion proactive des crues. Des études de cas illustrant les défis de gestion à court, moyen ou long terme sont présentées à l'annexe A. 226 pp. Englisch. Nº de ref. del artículo: 9781032987354
Cantidad disponible: 2 disponibles
Librería: GreatBookPrices, Columbia, MD, Estados Unidos de America
Condición: New. Nº de ref. del artículo: 49461081-n
Cantidad disponible: 10 disponibles
Librería: THE SAINT BOOKSTORE, Southport, Reino Unido
Paperback / softback. Condición: New. New copy - Usually dispatched within 4 working days. Nº de ref. del artículo: B9781032987354
Cantidad disponible: 1 disponibles
Librería: GreatBookPricesUK, Woodford Green, Reino Unido
Condición: New. Nº de ref. del artículo: 49461081-n
Cantidad disponible: 10 disponibles
Librería: GreatBookPricesUK, Woodford Green, Reino Unido
Condición: As New. Unread book in perfect condition. Nº de ref. del artículo: 49461081
Cantidad disponible: 10 disponibles
Librería: PBShop.store US, Wood Dale, IL, Estados Unidos de America
PAP. Condición: New. New Book. Shipped from UK. THIS BOOK IS PRINTED ON DEMAND. Established seller since 2000. Nº de ref. del artículo: L0-9781032987354
Cantidad disponible: Más de 20 disponibles
Librería: PBShop.store UK, Fairford, GLOS, Reino Unido
PAP. Condición: New. New Book. Delivered from our UK warehouse in 4 to 14 business days. THIS BOOK IS PRINTED ON DEMAND. Established seller since 2000. Nº de ref. del artículo: L0-9781032987354
Cantidad disponible: Más de 20 disponibles
Librería: California Books, Miami, FL, Estados Unidos de America
Condición: New. Nº de ref. del artículo: I-9781032987354
Cantidad disponible: Más de 20 disponibles