The great expositors of Blake and those who have followed in their footsteps have clarified the most minute particulars of Blake's vision. Now, in the place of traditional exegesis, comes a significantly new set of critical problems and interpretive methods. In this volume of essays, the major shift in Blake studies, already under way in practice, is addressed, gauged, analyzed, and debated.
The contributors assembled here, leading exponents of contemporary critical methods as well as close students of Blake, argue the grounds, purposes, and validity of each approach and then apply its method in detailed readings of Blake's works. We see deconstruction, psychoanalytic interpretation, feminist critique, semiotic analysis, Marxist criticism, revisionism, and other methods brought to bear on Blake's texts and into confrontation with one another by those best able to do so.
Through the essays themselves and in the reaction they will certainly provoke, Critical Paths will bring increased theoretical awareness to the study of Blake and will further the ongoing redefinition of Blake's art. At the same time, the collection investigates the general problem of methodology in literary studies by means of a casebook examination of modern critical approaches. Blake criticism and current literary theory here come together; the encounter illuminates and enriches both.
"Sinopsis" puede pertenecer a otra edición de este libro.
"This timely collection of essays ads tot he momentum that has been building in recent years for a fresh start in Blake studies--an impulse both to cleanse the doors of perception of Blake's critics and to sweep out the interpreter's parlor in which his now-familiar body of poetry has come to reside. . . . The most appealing feature of "Critical Paths" is its spirit of exploration--its zest in challenging cherished assumptions, its impatience with questions that have been asked too often, its agile movement between skepticism and affirmation, its air of the workshop rather than the museum or the shrine."--Mary Lynn Johnson
"Sobre este título" puede pertenecer a otra edición de este libro.
Librería: Book House in Dinkytown, IOBA, Minneapolis, MN, Estados Unidos de America
Hardcover. Condición: Very Good. Estado de la sobrecubierta: Very Good Dust Jacket. Very good hardcover in very good dust jacket. Binding is sound, sturdy and square. Text is clean and crisp. Light age-toning. Light shelf wear to dust jacket. Ships from Dinkytown in Minneapolis, Minnesota. Nº de ref. del artículo: 177448
Cantidad disponible: 1 disponibles
Librería: Bear Bookshop, John Greenberg, Brattleboro, VT, Estados Unidos de America
382pp. Illustrated in black and white Nice clean tight bright copy: Near Fine/Near Fine dj. Nº de ref. del artículo: 34070813
Cantidad disponible: 1 disponibles
Librería: Bear Bookshop, John Greenberg, Brattleboro, VT, Estados Unidos de America
Condición: Near Fine/Near Fine dj. 382pp. Illustrated in black and white. Nº de ref. del artículo: 58052904
Cantidad disponible: 1 disponibles
Librería: Anybook.com, Lincoln, Reino Unido
Condición: Fair. This is an ex-library book and may have the usual library/used-book markings inside.This book has hardback covers. In fair condition, suitable as a study copy. No dust jacket. Please note the Image in this listing is a stock photo and may not match the covers of the actual item,900grams, ISBN:0822307510. Nº de ref. del artículo: 7097227
Cantidad disponible: 1 disponibles